Bidding of Accelerated Bridge Construction Projects: Case Studies and Consensus Building

Accelerated bridge construction (ABC) is the solution of choice to upgrade substandard bridges, while maintaining traffic flow and optimizing safety through work zones. However, the perception of higher construction costs for ABC versus conventional construction continues in spite of numerous ABC projects having lower construction costs relative to conventional construction. This inaccurate perception and the fear of cost overruns are causing some bridge owners to be hesitant about using ABC technologies, especially those technologies related to bridge system moves which can provide the greatest benefit for safety and traffic flow impacts. Whether to use ABC for a specific project needs to be decided at the project development stage. Research is needed to assist state DOTs in identifying how best to set up bid items and the bid process within their agencies to be able to effectively document ABC costs for prefabricated bridge element construction and also bridge system moves including lateral slides, longitudinal launches, and self-propelled modular transporter (SPMT) moves. This project will focus upon consensus building of bid items used for ABC projects to allow for cost-based decisions regarding ABC implementation to be made.

Language

  • English

Project

  • Status: Completed
  • Funding: $30427
  • Contract Numbers:

    69A3551747121

  • Sponsor Organizations:

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174

    Department of Transportation

    Office of the Secretary
    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Project Managers:

    Azizinamini, Atorod

  • Performing Organizations:

    Iowa State University, Ames

    Institute for Transportation
    2711 South Loop Drive, Suite 4700
    Ames, Iowa  United States  50010-8664

    Accelerated Bridge Construction University Transportation Center (ABC-UTC)

    Florida International University
    10555 W. Flagler Street
    Miami, FL  United States  33174
  • Principal Investigators:

    Freeseman, Katelyn

    Shane, Jennifer

  • Start Date: 20180101
  • Expected Completion Date: 20201231
  • Actual Completion Date: 0
  • USDOT Program: University Transportation Centers

Subject/Index Terms

Filing Info

  • Accession Number: 01711095
  • Record Type: Research project
  • Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
  • Contract Numbers: 69A3551747121
  • Files: UTC, RIP
  • Created Date: Jul 17 2019 11:35AM