Evaluating the Performance of Longitudinal Barriers on Curved, Superelevated Off-Ramps

NCHRP Research Report 1138: Evaluating the Performance of Longitudinal Barriers on Curved, Superelevated Off-Ramps presents insights and guidelines related to the performance of longitudinal barriers placed on varying curved, superelevated ramp sections. The insights and guidelines were developed using vehicle dynamics analyses, finite element crash simulations, and full-scale crash testing. This report will be of immediate interest to highway designers and safety staff at transportation agencies who seek safer practices in designing, selecting, and deploying longitudinal barriers on curved, superelevated off-ramps. Longitudinal barriers are roadside safety devices commonly used to prevent errant vehicles from impacting hazards located alongside the traveled way. These barriers have been placed along the roadway, ranging from rigid concrete parapets to semi-rigid beam guardrails to relatively flexible wire rope barriers. Historically, the development and testing of longitudinal barriers have been conducted under the assumption that the barriers are installed in relatively straight sections parallel to the roadway. While the barriers designed under this assumption have performed well, their behavior when installed on curved roadways is largely unknown.

Language

  • English

Project

  • Status: Completed
  • Funding: $325,000
  • Contract Numbers:

    Project 22-29B

  • Sponsor Organizations:

    State Departments of Transportation (participating member states of American Association of State Highway Transportation Officials (AASHTO))

    American Association of State Highway Transportation Officials (AASHTO)
    444 North Capitol Street, NW
    Washington, DC  United States  20001

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Managing Organizations:

    National Cooperative Highway Research Program (NCHRP)

    Transportation Research Board
    500 Fifth Street, NW
    Washington, DC  United States  20001
  • Project Managers:

    Barcena, Roberto

  • Performing Organizations:

    George Mason University

    Fairfax, VA  United States  22030
  • Principal Investigators:

    Marzougui, Dhafer

  • Start Date: 20190129
  • Expected Completion Date: 20230831
  • Actual Completion Date: 20230831

Subject/Index Terms

Filing Info

  • Accession Number: 01675048
  • Record Type: Research project
  • Source Agency: Transportation Research Board
  • Contract Numbers: Project 22-29B
  • Files: TRB, RIP
  • Created Date: Jul 17 2018 9:04AM