Developing a Quality of Signal Timing Performance Measure Methodology for Arterial Operations (NDOT 607-17-803)

The Moving Ahead for Progress in the 21st Century (MAP-21) Act and the Fixing America's Surface Transportation (FAST) Act have emphasized performance-oriented and outcome-based transportation planning. While various performance measures for freeway operations have been established, methodologies for establishing arterial performance measures have not been defined. Conventional approaches to arterial performance measurement include the analytical methods documented in the Highway Capacity Manual (HCM). These methods describe arterial performance incorporating traffic delay and stops; the methods can be used to determine the quality of signal timing on an arterial road, making it a cost-effective engineering solution. In Nevada’s urban areas, signalized arterials carry nearly 40% of the total vehicle miles of travel (VMT); as a result, these arterials play a critical role in the overall transportation system’s efficiency. It is imperative that performance measurement criteria are established, so that the quality of signal timing and coordination along major arterials can be assessed. Efficient arterial operations and desirable performance outcomes cannot be achieved without traffic signals operating at their optimal levels. This research project, conducted on behalf of the Nevada Department of Transportation (NDOT), seeks to develop a scoring methodology for assessing the quality of signal timing along signalized arterials. It is anticipated that this scoring methodology will yield an index score based on common performance measures, that are obtained through either probe vehicle travel runs, or signal controller sensor and timing data.

Language

  • English

Project

  • Status: Completed
  • Funding: $272,986.00
  • Contract Numbers:

    607-17-803

  • Sponsor Organizations:

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Managing Organizations:

    Nevada Department of Transportation

    1263 South Stewart Street
    Carson City, NV  United States  89712
  • Performing Organizations:

    University of Nevada, Reno

    1664 N. Virginia Street
    Reno, Nevada  United States  89557
  • Principal Investigators:

    Zong, Tian

    Hao, Xu

  • Start Date: 20171204
  • Expected Completion Date: 20200831
  • Actual Completion Date: 20200831

Subject/Index Terms

Filing Info

  • Accession Number: 01653192
  • Record Type: Research project
  • Source Agency: Nevada Department of Transportation
  • Contract Numbers: 607-17-803
  • Files: RIP
  • Created Date: Dec 4 2017 5:34PM