Dynamic Evaluation and Design of Prefabricated Concrete Bridge Rails
The scope of work outlined below, builds upon the results of the Accelerated Bridge Construction-University Transportation Center (ABC-UTC) research project completed in Phase I. Tasks include: Task 1: Review of ABC-UTC Project (Phase I) and move forward with details for Two Precast Barrier Concepts for Dynamic Evaluation and Development of Design Methodology; Task 2: Conduct Numerical Modeling and LS-DYNA Simulation using Phase-I data; Task 3: Perform Impact Load Investigation on Two Prototype Designs; Task 4: Refine of Designs based on outcomes of from Task 3; Task 5: Perform Full-Scale Crash Tests on a Concrete Barrier-Deck Subassembly for Loads Corresponding to TL-4 and TL-5; Task 6: Calibrate Numerical Models; Task 7: Complete Parametric Study and Design Optimization; Task 8: Development Design, Construction and Implementation Guidelines; and Task 9: Conduct Life-Cycle Performance and Cost Analysis.
-
Supplemental Notes:
- Contract to a Performing Organization has not yet been awarded.
Language
- English
Project
- Status: Active
- Funding: $75000
-
Contract Numbers:
Addendum 617
-
Sponsor Organizations:
Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010 -
Project Managers:
Abu-Hawash, Ahmad
-
Principal Investigators:
Sritharan, Sri
- Start Date: 20170615
- Expected Completion Date: 20190531
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Barriers (Roads); Bridge construction; Bridge design; Bridge railings; Concrete bridges; Crash tests; Evaluation; Guidelines; Impact loads; Life cycle analysis; Numerical analysis; Prefabricated bridges; Simulation
- Subject Areas: Bridges and other structures; Construction; Highways;
Filing Info
- Accession Number: 01645862
- Record Type: Research project
- Source Agency: Iowa Department of Transportation
- Contract Numbers: Addendum 617
- Files: RIP, STATEDOT
- Created Date: Sep 7 2017 4:03PM