Post Tensioned Box-Girder Deck Replacement Method

A design and/or construction methodology is needed for the replacement of deteriorated post tensioned box girder decks without the reliance on falsework and while maintaining reduced traffic service on the bridge. The proposed solution shall be practical and implementable.