Post Tensioned Box-Girder Deck Replacement Method
A design and/or construction methodology is needed for the replacement of deteriorated post tensioned box girder decks without the reliance on falsework and while maintaining reduced traffic service on the bridge. The proposed solution shall be practical and implementable.
Language
- English
Project
- Status: Active
- Sponsor Organizations: Sacramento, CA United States 95819
-
Project Managers:
Lee, Peter
- Performing Organizations: Davis, CA United States 95616
-
Principal Investigators:
Chai, Rob
- Start Date: 20140901
- Expected Completion Date: 20180531
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Box girder bridges; Bridge construction; Bridge decks; Bridge design; Deterioration; Girder bridges; Posttensioning; Traffic loads
- Subject Areas: Bridges and other structures; Highways; Maintenance and Preservation;
Filing Info
- Accession Number: 01620514
- Record Type: Research project
- Source Agency: California Department of Transportation
- Files: RIP, STATEDOT
- Created Date: Jan 4 2017 10:53AM