SPR-4108: Development of Comprehensive CPT-Based Geotechnical Design Manual for Indiana Transportation Infrastructure
The main goal of this project is the development of a comprehensive cone penetrometer test (CPT)-based geotechnical design manual for site exploration, interpretation of soil behavior, and design of shallow/deep foundations, embankments and retaining walls in Indiana. Currently, geotechnical designs are carried out using soil strength and stiffness parameters that are obtained from time-consuming and relatively expensive laboratory tests. Since the CPT is an in situ test, the manual will provide the basis for Indiana Department of Transportation (INDOT) engineers to use CPT results directly for the assessment of site conditions and the design of geotechnical projects in the future.
Language
- English
Project
- Status: Completed
- Funding: $325686
-
Contract Numbers:
SPR-4108
-
Sponsor Organizations:
Purdue University/Indiana Department of Transportation JHRP
Purdue University
1284 Civil Engineering Building, Room 4154
West Lafayette, IN United States 47907-1284 -
Principal Investigators:
Salgado, Rodrigo
Prezzi, Monica
Niazi, Fawad S.
- Start Date: 20170101
- Expected Completion Date: 20201231
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Cone penetrometers; Embankments and retaining walls; Foundations; Geotechnical engineering; Soil mechanics; Stiffness
- Geographic Terms: Indiana
- Subject Areas: Bridges and other structures; Geotechnology; Highways;
Filing Info
- Accession Number: 01616115
- Record Type: Research project
- Source Agency: Indiana Department of Transportation
- Contract Numbers: SPR-4108
- Files: RIP, STATEDOT
- Created Date: Nov 3 2016 3:56PM