Extending Application of Simple for Dead and Continuous for Live Load Steel Bridge System to ABC Applications in Seismic Regions - Phase II - Component Testing

During Phase I of the project, suitable details were developed using numerical analysis. The next step is performing component level testing on the connection details prior to a large scale shake table test. The goal of the component test is to proof load the connection between the substructure and superstructure. If designed properly, the failure should not occur within the connection itself. The objective of the proposed project is the design and testing of the component level specimen.

    Language

    • English

    Project

    • Status: Active
    • Contract Numbers:

      69A3551747121

    • Sponsor Organizations:

      Accelerated Bridge Construction University Transportation Center (ABC-UTC)

      Florida International University
      10555 W. Flagler Street
      Miami, FL  United States  33174

      Office of the Assistant Secretary for Research and Technology

      University Transportation Centers Program
      Department of Transportation
      Washington, DC  United States  20590
    • Performing Organizations:

      Florida International University

      10555 W. Flagler Street
      Room 3602
      Miami, FL  United States  33172
    • Principal Investigators:

      Azizinamini, Atorod

      Yakel, Aaron

    • Start Date: 20160601
    • Expected Completion Date: 20201231
    • Actual Completion Date: 20180629
    • USDOT Program: University Transportation Centers
    • USDOT Program: University Transportation Centers Program

    Subject/Index Terms

    Filing Info

    • Accession Number: 01601733
    • Record Type: Research project
    • Source Agency: Accelerated Bridge Construction University Transportation Center (ABC-UTC)
    • Contract Numbers: 69A3551747121
    • Files: UTC, RIP
    • Created Date: Jun 8 2016 5:36PM