Designing and Applying a Decision Support System for DOT Fleet Assignment and Operation: Phase 2

Striping operations generate a significant workload for MoDOT maintenance operations. The requirement for each striping crew to replenish its stock of paint and other consumable items from a bulk storage facility, along with the necessity to make several passes on most of the routes to stripe all the lines on that road, introduce the potential for inefficiencies in the form of deadhead miles that striping crew vehicles must travel while not actively applying pavement markings. These inefficiencies generate unnecessary travel, wasted time, and vehicle wear. Phase 2 updates a 2015 project that developed a decision support tool for scheduling and routing road striping operations. The updates presented in the final report improve the optimization model, which generates more user-friendly outputs.

Language

  • English

Project

  • Status: Completed
  • Funding: $40000
  • Contract Numbers:

    DTRT13-G-UTC37

  • Sponsor Organizations:

    Midwest Transportation Center

    Iowa State University
    2711 S Loop Drive, Suite 4700
    Ames, IA  United States  50010-8664

    Missouri Department of Transportation

    1617 Missouri Boulevard
    P.O. Box 270
    Jefferson City, MO  United States  65102

    Office of the Assistant Secretary for Research and Technology

    University Transportation Centers Program
    Department of Transportation
    Washington, DC  United States  20590
  • Managing Organizations:

    Midwest Transportation Center

    Iowa State University
    2711 S Loop Drive, Suite 4700
    Ames, IA  United States  50010-8664
  • Performing Organizations:

    University of Missouri, Columbia

    Department of Civil Engineering
    Columbia, MO  United States  65211
  • Principal Investigators:

    McGarvey, Ronald

  • Start Date: 20151209
  • Expected Completion Date: 20160630
  • Actual Completion Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 01594548
  • Record Type: Research project
  • Source Agency: Midwest Transportation Center
  • Contract Numbers: DTRT13-G-UTC37
  • Files: UTC, RIP
  • Created Date: Mar 25 2016 9:49AM