Hazard Mitigation Indefinite Delivery/Indefinite Quantity (IDIQ)Contract
The scope of this contract includes conducting research in the area of bridge vulnerabilities to single or multiple hazards, development of the mitigation and adaptation countermeasures including materials for existing and new structures, development of the next generation of analysis and design tools, and methodologies to address extreme events, assessment of the condition and health of bridge networks after extreme events, and materials research to develop resilient systems. Extreme event loads include both natural hazards, such as flooding, wind, and seismic; as well as manmade hazards, such as overloads, fire, impact forces, unintentional (explosion), or intentional blast events (terrorism).
-
Supplemental Notes:
- Program Information: Surface Transportation Research, Infrastructure Research and Technology
Language
- English
Project
- Status: Active
- Funding: $4206789
-
Contract Numbers:
DTFH61-14-D-00007
DTFH61-14-D-00010
-
Sponsor Organizations:
Federal Highway Administration
Turner-Fairbank Highway Research Center
McLean, VA United States 22101 -
Project Managers:
Jalinoos, Frank
-
Performing Organizations:
205 E 42nd Street
New York, NY United States 10017 -
Principal Investigators:
Agrawal, Anil
- Start Date: 20140206
- Expected Completion Date: 20190215
- Actual Completion Date: 0
Subject/Index Terms
- TRT Terms: Bridges; Floods; Hazard evaluation; Loads; Resilience (Materials); Seismicity; Structural health monitoring
- Subject Areas: Bridges and other structures; Highways; Maintenance and Preservation;
Filing Info
- Accession Number: 01577145
- Record Type: Research project
- Source Agency: Department of Transportation
- Contract Numbers: DTFH61-14-D-00007, DTFH61-14-D-00010
- Files: RIP, USDOT
- Created Date: Sep 28 2015 11:12AM