Ultra-High Performance Concrete Connections Between Precast Bridge Deck Elements
Precast concrete bridge deck panels and precast concrete deck-bulb-tee girders both present solutions capable of facilitating accelerated construction/reconstruction/rehabilitation of highway bridges. However, the connections between these elements, which must be completed in the field, have proved to be a hurdle to successful implementation. In short, the connections between elements present long-term durability concerns and often result in less than desirable performance of the system as a whole. Ultra-High Performance Concrete (UHPC) is a type of advanced cementitious material that is particularly well suited to highway bridge applications due to its enhanced durability and increased strengths as compared to conventional concretes. UHPC has the potential to work particularly well in connection details between precast elements due to its ability to develop mild steel reinforcement over short distances allowing for the design of minimal width cast-in-place joints which do not require post-tensioning or complex embedments. New York State DOT (NYSDOT) is particularly interested in this concept and is completing two bridge rehabilitation projects during the summer of 2009 which implement the cast-in-place UHPC connection. NYSDOT has partnered with the Federal Highway Administration (FHWA) to investigate the performance of the cast-in-place UHPC connection detail through full-scale structural testing at the Turner-Fairbank Highway Research Center. The objective of this study is to investigate the structural performance of ultra-high performance concrete (UHPC) connection details developed for implementation in precast concrete bridge deck systems.
- Record URL:
Language
- English
Project
- Status: Completed
- Funding: $125000
-
Contract Numbers:
TPF-5(217)
-
Sponsor Organizations:
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC United States 20590Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010New York State Department of Transportation
50 Wolf Road
Albany, NY United States 12232 -
Project Managers:
Graybeal, Benjamin
- Start Date: 20211014
- Expected Completion Date: 0
- Actual Completion Date: 0
- Source Data: RiP Project 42021
Subject/Index Terms
- TRT Terms: Bridge decks; Cast in place structures; Durability; Precast concrete; Ultra high performance concrete
- Uncontrolled Terms: Accelerated construction; Bulbtee girders
- Subject Areas: Bridges and other structures; Highways; Materials;
Filing Info
- Accession Number: 01560750
- Record Type: Research project
- Source Agency: Federal Highway Administration
- Contract Numbers: TPF-5(217)
- Files: RIP, STATEDOT
- Created Date: Apr 22 2015 1:03AM