Bridge Hydro-mining Thickness Measurements
This project proposes to measure the thickness of the removed concrete material as a result of hydrodemolition (and manual removal) using before and after LIDAR measurements and adapting/developing change detection algorithms.
- Record URL:
Language
- English
Project
- Status: Completed
- Funding: $2500.00
-
Contract Numbers:
DTRT06-G-0014
00042275
-
Sponsor Organizations:
Missouri University of Science & Technology, Rolla
Department of Engineering
202 University Center
Rolla, MO 65409 -
Performing Organizations:
Missouri Department of Transportation
1617 Missouri Boulevard
P.O. Box 270
Jefferson City, MO United States 65102 -
Principal Investigators:
Maerz, Norbert
- Start Date: 20130315
- Expected Completion Date: 0
- Actual Completion Date: 20131231
- Source Data: RiP Project 34546
Subject/Index Terms
- TRT Terms: Concrete bridges; Laser radar; Measurement; Thickness
- Uncontrolled Terms: Hydrodemolition
- Subject Areas: Geotechnology; Highways; Research; I30: Materials;
Filing Info
- Accession Number: 01517408
- Record Type: Research project
- Source Agency: Center for Infrastructure Engineering Studies
- Contract Numbers: DTRT06-G-0014, 00042275
- Files: UTC, RIP
- Created Date: Mar 7 2014 1:01AM