Installation, Maintenance and Repair of Weigh-in-Motion Systems at LTPP Sites

A core objective of the Long-Term Pavement Performance (LTPP) Specific Pavement Study (SPS) is to understand and quantify the relationship between pavement performance, truck volumes, and axle loadings. The objective of this project is to improve the quality and increase the quantity of monitored traffic data (volumes, classifications, and weights) at the SPS-1, -2, -5, -6, and -8 test sites. There are a total of 64 SPS-1, -2, -5, and -6 test sites and 20 SPS-8 sites throughout North America. This multi-year study will attempt to collect research quality data by installing a Bending Plate, Load Cell, or Quartz Sensor at as many of these SPS sites as economically possible. For the purpose of this study, research quality data is defined to be at least 210 days of data (in a year) of known calibration meeting LTPP's precision requirements for steering and tandem axles, gross vehicle weight, speed, and axle spacing. This is a two-phase project that runs concurrently. This contract represents Phase II and it involves determining if a site is suitable for installing a WIM system; installing and maintaining a new WIM system; performing the initial calibration for a newly installed WIM system; downloading and performing verification checks for the previous day's data for the site; and providing a five-year warranty of the system after acceptance of the site by the Federal Highway Administration (FHWA). Information on the Phase I activities for this project can be found under the title "LTPP Weigh-in-Motion Field Calibrations and Validations."

    Language

    • English

    Project

    • Status: Active
    • Funding: $14676285.00
    • Contract Numbers:

      DTFH6105D00001

    • Sponsor Organizations:

      Federal Highway Administration

      1200 New Jersey Avenue, SE
      Washington, DC  United States  20590
    • Project Managers:

      Walker, Deborah

    • Performing Organizations:

      International Road Dynamics

      702 - 43rd Street East
      Saskatoon, Saskatchewan
      ,     S7K 3T9
    • Principal Investigators:

      Czinku, Roy

    • Start Date: 20041028
    • Expected Completion Date: 0
    • Actual Completion Date: 20111231
    • Source Data: RiP Project 10542

    Subject/Index Terms

    Filing Info

    • Accession Number: 01464891
    • Record Type: Research project
    • Source Agency: Federal Highway Administration
    • Contract Numbers: DTFH6105D00001
    • Files: RIP, USDOT
    • Created Date: Jan 3 2013 2:51PM