ABC Deck Connections, Laboratory Testing and Evaluation
This project is examining new connections between pre-cast bridge deck plates. In accelerated bridge construction off site pre-cast deck panels are often used. Once placed on the bridge girders, these deck panels must be tied together. This research is examining improved connections to ensure proper performance of these panel connections.
Language
- English
Project
- Status: Active
- Funding: $117545.00
-
Contract Numbers:
UT07.801
-
Sponsor Organizations:
Utah Department of Transportation
4501 South 2700 West
Project Development
Salt Lake City, UT United States 84114-8380 -
Project Managers:
Hsiao, Daniel
-
Performing Organizations:
Utah State University Transportation Center
Utah State University
Logan, UT United States 84322-4110 -
Principal Investigators:
Halling, Marvin
- Start Date: 20080101
- Expected Completion Date: 0
- Actual Completion Date: 20101231
- Source Data: RiP Project 27763
Subject/Index Terms
- TRT Terms: Bridge construction; Bridge decks; Bridge design; Design; Laboratory tests; Prefabricated structures; Structural connection
- Uncontrolled Terms: Deck panels
- Subject Areas: Bridges and other structures; Construction; Design; Highways; Transportation (General);
Filing Info
- Accession Number: 01461096
- Record Type: Research project
- Source Agency: Utah State University Transportation Center
- Contract Numbers: UT07.801
- Files: UTC, RIP, STATEDOT
- Created Date: Jan 3 2013 1:39PM