Precipitation Estimates for Eastern Washington Stormwater Designs
Current Washington State Department of Transportation (WSDOT) stormwater designs for Eastern Washington rely on precipitation estimates obtained from relatively crude studies done in the 1960s. Inadequate data can lead to over-design and unnecessary construction cost or under-design and damage from overflow. This project will extend the update of precipitation information recently completed for Western Washington to Eastern Washington. The information will also support stormwater analyses that will be required by the DOE stormwater manual for Eastern Washington now under development.
Language
- English
Project
- Status: Proposed
-
Contract Numbers:
03-366
-
Sponsor Organizations:
Washington State Department of Transportation
Transportation Building
Olympia, WA United States 98504 -
Project Managers:
Brooks, Rhonda
- Start Date: 20030700
- Expected Completion Date: 0
- Actual Completion Date: 0
- Source Data: RiP Project 7770
Subject/Index Terms
- TRT Terms: Drainage structures; Overflows; Precipitation (Meteorology); Research projects; Runoff; Storms; Water control
- Subject Areas: Construction; Hydraulics and Hydrology; Research; I30: Materials;
Filing Info
- Accession Number: 01459248
- Record Type: Research project
- Source Agency: Washington State Department of Transportation
- Contract Numbers: 03-366
- Files: RIP, STATEDOT
- Created Date: Jan 3 2013 12:59PM