<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Research in Progress (RIP)</title>
    <link>https://rip.trb.org/</link>
    <atom:link href="https://rip.trb.org/Record/RSS?s=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" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Research in Progress (RIP)</title>
      <url>https://rip.trb.org/Images/PageHeader-wTitle-RIP.jpg</url>
      <link>https://rip.trb.org/</link>
    </image>
    <item>
      <title>IoT-Driven Digital Twin Framework for the Design and Fabrication of Precast Elements</title>
      <link>https://rip.trb.org/View/2491026</link>
      <description><![CDATA[Despite the promising potential, the integration of Internet-of-Things (IoT) and digital twin (DT) technologies in precast concrete production is yet to be explored to surmount the challenges associated with their implementation. First, combining data from various IoT sensors and integrating them into DT models requires robust data management systems and interoperability between different software and hardware platforms. Also, the initial cost of implementing IoT systems and developing DT models can be excessively high, particularly for small-to-medium-sized precast companies, the widespread use of IoT in construction raises concerns about data security and the potential vulnerability of IoT-enabled systems to cyberattacks. Therefore, the primary aim of this exploratory project is to explore the integration of IoT and Digital Twin technologies into the design and fabrication of precast elements.]]></description>
      <pubDate>Wed, 22 Jan 2025 11:38:38 GMT</pubDate>
      <guid>https://rip.trb.org/View/2491026</guid>
    </item>
    <item>
      <title>SPR-4843:  Advancing Accelerated Bridge Construction and Fabrication in Indiana</title>
      <link>https://rip.trb.org/View/2209639</link>
      <description><![CDATA[The proposed research aims to increase the use of accelerated bridge construction (ABC) and accelerated bridge fabrication (ABF) in Indiana as these technologies have the potential to address INDOT needs related to improving construction time (both onsite construction time and total project delivery time), project cost, and work zone safety (for both the traveling public and construction workers). The focus would be on the scoping stage, with the goal of triggering which projects are candidates for ABC or ABF early in the process. Research will culminate in guidelines and recommendations for implementing ABC/ABF in Indiana.]]></description>
      <pubDate>Mon, 10 Jul 2023 09:25:07 GMT</pubDate>
      <guid>https://rip.trb.org/View/2209639</guid>
    </item>
    <item>
      <title>Phased Array Probability of Detection Study - Phase IV (FOR NDE LAB)</title>
      <link>https://rip.trb.org/View/1512647</link>
      <description><![CDATA[Currently relying on radiographic testing (RT) for acceptance/rejection of groove and full penetration welds causing delays during fabrication. Phased Array Ultrasonic Testing (PAUT) should be able to accomplish the same with little delay. There is a need to develop acceptance criteria for PAUT for weld inspection]]></description>
      <pubDate>Tue, 15 May 2018 15:34:43 GMT</pubDate>
      <guid>https://rip.trb.org/View/1512647</guid>
    </item>
    <item>
      <title>Multifunctional Composite Sensors for Sustainable Infrastructure Systems</title>
      <link>https://rip.trb.org/View/1482482</link>
      <description><![CDATA[To enhance longevity and structural performance, next generation infrastructure systems must integrate high performance material and structural systems that are durable and safe, and health monitoring systems that can obtain real-time data on the condition of structures and timely detect anomalies in the structural performance. Multifunctional composites that are intrinsically smart and durable can avoid deployment of two separate systems (high performance structural systems and health monitoring systems) to achieve this goal. This project will explore the design, fabrication, and implementation of multifunctional cementitious and polymer composites. The proposed multifunctional composites will exploit intrinsic smart properties of shape memory alloy (SMA) fibers. SMAs are a class of metallic alloys that have unique properties such as high strength, large deformation capability, good ductility and damping capacity, long fatigue life, large electrical resistivity and excellent re-centering ability. Using a multiscale micromechanics-based design approach that has been successfully employed in development of various high performance fiber reinforced cementitious composites, the development of SMA-based multifunctional cementitious composites will be explored to simultaneously achieve strain hardening, self-centering, crack width control, high energy absorption and self-monitoring abilities in a single cementitious composite material. In addition, the use of SMA fibers in a thermoset epoxy matrix and shape memory polymer matrix will be investigated.]]></description>
      <pubDate>Mon, 11 Sep 2017 16:42:17 GMT</pubDate>
      <guid>https://rip.trb.org/View/1482482</guid>
    </item>
    <item>
      <title>Use of 0.7-in. Diameter Strands in Precast Pretensioned Girders</title>
      <link>https://rip.trb.org/View/1364284</link>
      <description><![CDATA[Long-span bridges are often used in environmentally sensitive terrains, water crossings, and in locations with traffic and geometric restrictions. Bridges with long-span precast pretensioned girders are advantageous due to their ease and speed of construction, lower cost, and long-term durability. The use of 0.7-in. diameter strands would help bridge designers extend the spans of the existing girder shapes. However, the current AASHTO bridge design and construction specifications do not address the use of 0.7-in. diameter strands for precast prestressed girders. Bridge owners, fabricators, and contractors need specifications and guidelines to implement the use of 0.7-in. diameter strands in practice. 
  
The objectives of this research were to develop: (1) proposed modifications to the AASHTO LRFD Bridge Design Specifications and the AASHTO LRFD Bridge Construction Specifications to incorporate the use of 0.7-in. diameter strands in precast pretensioned girders for various span lengths; (2) guidelines for precast pretension girder fabrication using 0.7-in. diameter strands; and (3) guidelines for handling, shipping, and erection of long-span girders. ]]></description>
      <pubDate>Thu, 06 Aug 2015 01:00:22 GMT</pubDate>
      <guid>https://rip.trb.org/View/1364284</guid>
    </item>
    <item>
      <title>Instrumentation to Aid in Steel Bridge Fabrication</title>
      <link>https://rip.trb.org/View/1351309</link>
      <description><![CDATA[There are many documented and undocumented cases of steel bridge erection problems.  This is especially true for complex structures, such as curved girders and box structures.  As an example, in 2001 the Virginia Department of Transportation was faced with a problem at the Magruder Boulevard over I-64 Bridge in Hampton, Virginia.  Here an incorrectly fabricated girder was not identified until most of the structure was erected and some components did not fit together.  This single incident resulted in millions of dollars in legal expenses, re-fabrication expenses, and delays in construction of the bridge.  Because of these types of problems, most states require a steel bridge fabricator to shop assemble some or all parts of a steel bridge.  This practice is intended to assure that the structure, primarily the splice plates and cross frames, will fit together at the job site as designed.  This shop assembly procedure is labor and time-in¬tensive and adds significant cost to a steel bridge.  In addition, quality control data is typically taken by hand with string lines and rulers and recorded manually on paper reports.  This process can sometimes contain errors (i.e. wrong number written down or errors in measurements) and does not provide a complete permanent record of a fabricated component. This research will deliver a laser based bridge measurement system that will greatly improve the quality and reduce the cost of complex bridge fabrication.  This system will reduce or eliminate the need for shop fit-up and assembly by providing a virtual assembly capability using specialized solid modeling and analysis software specifically targeted at large-scale complex structures.  This laser system will be specifically designed for steel bridge fabrication and will accurately and precisely measure all aspects of a bridge component, including splice hole locations, camber, sweep, and end-kick in a nearly full-automated manner.   The completed system can be used as a quality control tool to document as-built conditions of girders and as a virtual fit-up tool to eliminate shop assembly.   There is no existing laser-based measurement system that can measure very large and very complex girders with the accuracy, as rapidly, and with as little operator intervention as that being proposed. The use of this laser system on just one complex bridge job could result in benefits that exceed the cost of this entire research project.  The stakeholder group that can potentially benefit the most from the use of the proposed laser system are the State departments of transportation (DOTs), who could save millions of dollars on the cost of steel bridges and receive greater quality assurance on the end product.  Elimination of shop assembly of complex structures could save millions of dollars.  The proposed system can identify fabrication errors at the fabrication shop allowing repairs to be made prior to painting and shipment to a job site.  Documentation from the proposed system is a permanent record that is certifiable and traceable.  This documentation can be used to help reduce construction claims and could serve as evidence in legal disputes in cases where there are problems during bridge erection.  Avoiding the legal expenses from one such dispute of this type could more than pay for the cost of this research.]]></description>
      <pubDate>Wed, 22 Apr 2015 01:03:05 GMT</pubDate>
      <guid>https://rip.trb.org/View/1351309</guid>
    </item>
    <item>
      <title>Implementation and Field Evaluation of Pretensioned Concrete Girder End Crack Control Methods</title>
      <link>https://rip.trb.org/View/1334485</link>
      <description><![CDATA[Wisconsin bulb tee girders and girders in other states experience characteristic cracking at girder ends during de-tensioning and during lifting from the forms. These cracks pose durability concerns as corrosive agents can reach steel reinforcement or strands through these cracks, increasing long term maintenance costs, and potentially compromising structural capacity. This proposal outlines an approach for deploying selected crack control methods into Wisconsin practice. The success of crack control methods will be evaluated by measuring strains and crack sizes in girders built with control methods and by visual observation of girder ends for cracks during fabrication and erection. Phase II work is critical to implement a solution for the end cracking.]]></description>
      <pubDate>Sat, 06 Dec 2014 01:00:30 GMT</pubDate>
      <guid>https://rip.trb.org/View/1334485</guid>
    </item>
    <item>
      <title>Fatigue Resistance of Rib to Deck Welds in Steel Orthotropic Decks</title>
      <link>https://rip.trb.org/View/1230551</link>
      <description><![CDATA[This research project will develop welding procedures for fabrication of steel orthotropic bridge decks.  The project will focus on the quantifying the variables affecting the fatigue resistance of rib-to-deck welds. Originally the project was to evaluate the Hybrid Laser Arc Welding (HLAW) process for re-decking the Walt Whitman Bridge in Philadelphia, but project did not get results quickly enough and the scope was expanded to also include conventionally used steel fabrication welding processes.  The project is now evaluating the fatigue resistance of rib-to-deck welds made using HLAW, SAW, and GMAW welding processes at various weld penetrations of fillet, 20%, 40%, 60%, 80% and 100% weld penetration.]]></description>
      <pubDate>Thu, 03 Jan 2013 14:02:02 GMT</pubDate>
      <guid>https://rip.trb.org/View/1230551</guid>
    </item>
  </channel>
</rss>