<rss version="2.0" xmlns:atom="https://www.w3.org/2005/Atom">
  <channel>
    <title>Research in Progress (RIP)</title>
    <link>https://rip.trb.org/</link>
    <atom:link href="https://rip.trb.org/Record/RSS?s=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" rel="self" type="application/rss+xml" />
    <description></description>
    <language>en-us</language>
    <copyright>Copyright © 2026. National Academy of Sciences. All rights reserved.</copyright>
    <docs>http://blogs.law.harvard.edu/tech/rss</docs>
    <managingEditor>tris-trb@nas.edu (Bill McLeod)</managingEditor>
    <webMaster>tris-trb@nas.edu (Bill McLeod)</webMaster>
    <image>
      <title>Research in Progress (RIP)</title>
      <url>https://rip.trb.org/Images/PageHeader-wTitle-RIP.jpg</url>
      <link>https://rip.trb.org/</link>
    </image>
    <item>
      <title>Impact of Recycling Agent Introduction Method on Plant-Produced Asphalt Mixtures





</title>
      <link>https://rip.trb.org/View/2558397</link>
      <description><![CDATA[BACKGROUND: Reclaimed asphalt pavement (RAP) usage has plateaued because of concerns about premature pavement failures associated with stiff recycled binders. While recycling agents (RAs) can enhance the activation and performance of aged binders, their effectiveness depends on (1) their characteristics, (2) the dosage, and (3) the method of introduction—either pre-blended with virgin binder or directly applied to RAP (i.e., pre-treatment). The method of introduction, in particular, influences the distribution and diffusion of the RA into the RAP binder. While the first two factors can be evaluated in a laboratory, the third is affected by asphalt plant and production practices and cannot be fully evaluated in a laboratory setting.

Research is needed to evaluate how RA introduction methods affect high RAP mixtures under plant production and field conditions while considering variables such as binder diffusion, RAP conditioning time, and plant process parameters.

OBJECTIVE: The objective of this research is to develop guidelines for introducing RAs for high RAP mixtures (over 30% recycled binder ratio) during plant production. The guidelines shall be based on an evaluation of different RA introduction methods, such as pre-blended with virgin binder at the terminal or at the plant, or applied directly to RAP, through testing plant-produced mixtures and field performance monitoring.

Accomplishment of the project objective will require at least the following tasks.

TASKS: PHASE I—Planning - (Task 1) Collect and review literature relevant to RAs, current RA introduction practices during production, key production parameters to track, and field performance evaluation methods. The review shall include published and unpublished documentation and research conducted by the NCHRP; Federal Highway Administration; other national, state, and local agencies; and international organizations.
(Task 2) Survey state departments of transportation to gather information related to different RA types, RA introduction practices, key production parameters to track, field performance evaluation methods, and potential field sites (new or existing) for inclusion in the analysis. (Task 3) Synthesize the results of the literature review and the survey to identify knowledge gaps related to the research objective. These gaps should be addressed in the final product or the recommended future research, as the budget permits. (Task 4) Propose the research plan to be executed in Phase II to achieve the project objective. At a minimum, the research plan shall include the approach for:
(a) incorporating a range of RA types (e.g., petroleum and non-petroleum) and introduction techniques; (b) selecting mix–design protocols (e.g., RA selection criteria, dosage optimization method, laboratory performance testing); (c) analyzing the impact of RA introduction methods on mixture performance (e.g., cracking, rutting, raveling) through an evaluation of plant-produced mixtures; (d) identifying potential field test sites that include control sections, represent various climatic regions, and are constructed as surface courses; (e) monitoring field performance (e.g., constructability, surface distresses, ride quality, structural evaluation) through comparison to control sections; and
(f) developing guidelines for introducing RAs during plant production for high RAP mixtures (over 30% recycled binder ratio). (Task 5) Provide an annotated outline of the proposed guidelines. (Task 6) Prepare Interim Report No. 1, which documents the research performed in Tasks 1 through 5, includes a data archiving and sharing plan (see Special Note A), and provides an updated work plan for the remainder of the research. The updated plan must describe the process and rationale for the work proposed for Phases II and III. Interim Report No. 1 shall be submitted no later than 7 months after the contract is awarded.

Note: Following a 1-month review of Interim Report No. 1 by the NCHRP, the research team will meet with the project panel to discuss the interim report. Work on Phase II of the project will not begin until authorized by the NCHRP.

TASKS: PHASE II—Execution - (Task 7) Execute the research plan according to the approved Interim Report No. 1 and update the annotated outline of the guidelines after consideration of the panel’s review comments. (Task 8) Prepare a draft of the guidelines based on the results of this work. (Task 9) Prepare Interim Report No. 2, which documents Tasks 7 and 8 and provides an updated work plan for Phase III. Interim Report No. 2 shall be submitted no later than 36 months after the contract is awarded.

Note: Following a 1-month review of Interim Report No. 2 by the NCHRP, the research team will meet with the project panel to discuss the interim report. Work on Phase III of the project will not begin until authorized by the NCHRP.

TASKS: PHASE III—Final Products - (Task 10) Revise the draft guidelines after consideration of the panel’s review comments. (Task 11) Prepare a stand-alone technical memorandum titled “Implementation of Research Findings and Products” (see Special Notes D). (Task 12) Prepare presentation materials, in PowerPoint or another format, with speaker notes for use in webinars to facilitate the use and adoption of deliverables. (Task 13) Submit the final deliverables, including a conduct of research report documenting the entire research effort and findings, the guidelines, the Implementation of Research Findings and Products, and the presentation materials.

Note: Following receipt of the draft final deliverables, the remaining 3 months shall be for NCHRP review and comment and for research agency preparation of the final deliverables.

SPECIAL NOTES: (A) To ensure that the data produced under this project are accessible, the agency performing the research shall prepare a data archiving and sharing plan to be submitted with Task 6 and submit all data by the end of the project. The plan shall outline how the data will be produced, documented, archived in the NCHRP permanent repository, and made publicly available following CRP review and approval. The plan must address the following elements: (1) Data production and format: Expected data types, structure, and final formats. (2) Documentation and tools: Supporting materials and any analytic tools or results to be provided. (3) Archiving and quality assurance: Procedures for data archiving, validation, and quality control. (B) One of the interim meetings will take place in Washington, DC. (C) Presentation materials with speaker notes shall be prepared in PowerPoint or another format, for use in webinars to facilitate the use and adoption of research findings and products. (D) The required technical memorandum (no more than 10 pages) titled “Implementation of Research Findings and Products” should address the following implementation frameworks: effective products; implementation stages; implementation drivers; implementation teams; and product feedback. For more information on the frameworks, read the TR News article “Active Implementation at the National Cooperative Highway Research Program: Frameworks for Moving Research into Practice,” available at https://www.nationalacademies.org/osdocs/NCHRP20-44_ActiveImplementation-TRNews.pdf.]]></description>
      <pubDate>Wed, 28 May 2025 10:09:46 GMT</pubDate>
      <guid>https://rip.trb.org/View/2558397</guid>
    </item>
    <item>
      <title>Impact of Polymer Modification on Mechanical and Viscoelastic Properties</title>
      <link>https://rip.trb.org/View/1357220</link>
      <description><![CDATA[Polymer modified binders are now extensively used in the asphalt industry. However, it is still not well understood how the polymers and the base binders interlock and whether the degree of interlocking impacts performance of polymer modified binders. The research has shown that low non-recoverable compliance values in the Multiple Stress Creep and Recovery test at 64 C appear to show significantly low rutting performance in the laboratory based on the flow time test. However, most of these tests were done on modified binders that were provided by the refinery whose precise formulations are unknown. There is a need to measure the properties of binders with known modification to determine the influence of polymers on the mechanical properties of the binders. Investigation of the morphology is necessary because the properties change when polymer networks are formed. When a sufficient amount of polymer networks have been formed the polymers are considered to be full interlocking with the binder. Because the dispersion of polymer in an asphalt binder depends on factors such as blending time, temperature, and base compatibility, fluorescence microscopy can be used to monitor the dispersion to ensure that polymer networking is occurring. With the recent acquiring of the fluorescent microscope at Rowan University, it has provided the project with the capability to directly determine if there has been adequate interlocking between the base binder and the polymer and subsequently determine how a given polymer or combination of polymers impact binder and mix performance.]]></description>
      <pubDate>Thu, 11 Jun 2015 01:01:22 GMT</pubDate>
      <guid>https://rip.trb.org/View/1357220</guid>
    </item>
  </channel>
</rss>