Research in Progress
Text Size:

Mark: All | None | Show

Your Search
2208-11-18
PROJECT: Visual Aircraft Detection and Tracking via Foveal-peripheral Vision

Department of Transportation, $200000.00, 2208, Completed

Actions: Preview Abstract

2017-01-27
PROJECT: Understanding Changes in Demographics, Preferences and Markets for the Transit Industry

Transportation Research Board, $350000.00, 2017, Proposed

Actions: Preview Abstract

2015-09-01
PROJECT: Neural Correlates of Older Driver Performance

Safety Research Using Simulation University Transportation Center, $65000.00, 2015, Active

Actions: Preview Abstract

2015-09-01
PROJECT: Driving Simulator Evaluation of Countermeasures to Improve Pedestrian and Bicycle Safety

Safety Research Using Simulation University Transportation Center, $65000.00, 2015, Active

Actions: Preview Abstract

2015-08-16
PROJECT: Developing a Multi-resolution Traffic Simulation Platform for Integrated Active Traffic Operations Evaluation in Metropolitan Areas

National Transportation Center @ Maryland, Office of the Assistant Secretary for Research and Technology (OST-R), U.S. Department of Transportation (US DOT), $80000.00, 2015, Proposed

Actions: Preview Abstract

2015-08-15
PROJECT: Development and Demonstration of Advanced Methods for Quantifying Freight Truck Activity, Energy Use, and Emissions

National Transportation Center @ Maryland, Office of the Assistant Secretary for Research and Technology (OST-R), U.S. Department of Transportation (US DOT), $111000.00, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Benefits of Lighting Interstates

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Bicycle and Pedestrian Documentation Project

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Best Practices of using Shotcrete for Wall Fascia and Slope Stabilization

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Steep Slopes Infiltration Rates

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Developing Connections for Longitudinal Joints Between Deck Bulb Tees

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Connected Vehicles and Smart Cities

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Pile Driving Noise Attenuation

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Project Inspection using Mobile Technology - Phase II

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Electronic Fare Transaction Data

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Identify Multimodal (non-SOV) Enhancements

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Determining Expected Life and Best Practices for Pavement Maintenance Treatments - Phase 2

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Developing Girder Strands into the Cap Beam for a Positive Moment Connection

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Evaluation of Smart Technology

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Evaluate Risk-Based Asset Management Systems for WSDOT Implementation

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Economic Benefit of Highway and Bridge Preservation Projects

Washington State Department of Transportation, 2015, Proposed

Actions: Preview Abstract

2015-07-01
PROJECT: Using Naturalistic Driving Data to Develop Simulator Scenarios

Safety Research Using Simulation University Transportation Center, $64605.00, 2015, Active

Actions: Preview Abstract

2015-07-01
PROJECT: Transfer from Highly Automated to Manual Control Performance Trust

Safety Research Using Simulation University Transportation Center, $65000.00, 2015, Active

Actions: Preview Abstract

2015-07-01
PROJECT: Using Driver Simulators to Assess Instructional Format Efficacy on Older and Younger Drivers' Understanding of Adaptive Cruise Control

Safety Research Using Simulation University Transportation Center, $77745.00, 2015, Active

Actions: Preview Abstract

to

Use YYYY or YYYYMM format

Modify | New Search | History