Research in Progress
Text Size:

Mark: All | None | Show

Your Search
2010-10-01
PROJECT: Stainless Steel Reinforcement as a Replacement for Epoxy Coated Steel in Bridge Decks

Oklahoma Department of Transportation, $199045.00, 2010, Active

Actions: Preview Abstract

2010-08-01
PROJECT: Investigation and Evaluation of the Iowa Department of Transportation Bridge Deck Epoxy Injection Process

Iowa Department of Transportation, $330000.00, 2010, Active

Actions: Preview Abstract

2010-07-01
PROJECT: Study of the Role of Fatigue in Interstate 81 Bridge Closure Slab Failure

Virginia Department of Transportation, $78698.00, 2010, Active

Actions: Preview Abstract

2009-07-10
PROJECT: Long-Term Performance of Epoxy Adhesive Anchor Systems

National Cooperative Highway Research Program, $500000.00, 2009, Active

Actions: Preview Abstract

2008-08-01
PROJECT: Sealing of Small Movement Bridge Expansion Joints - Phase II: Field Demonstration and Monitoring

New England Transportation Consortium (NETC), $75000.00, 2008, Active

Actions: Preview Abstract

2007-10-01
PROJECT: Stainless Steel Reinforcement for a Concrete Bridge Deck

University of Kentucky, Lexington, $95000.00, 2007, Active

Actions: Preview Abstract

2006-09
PROJECT: Corrosion Protection Performance of Epoxy - Coated Reinforcing Bars

Midwest Regional University Transportation Center, $59288.00, 2006, Active

Actions: Preview Abstract

2005-12-01
PROJECT: Manufacture and Paint I-Beams for Defect Detection Test

University of Kentucky, Lexington, $10060.00, 2005, Active

Actions: Preview Abstract

2003-02-20
PROJECT: Field Evaluation of Concrete Containing Disodium Tetrapropenyl Succinate (DSS)

Connecticut Department of Transportation, $207000.00, 2003, Active

Actions: Preview Abstract

2002-10-01
PROJECT: Evaluation of Metalized Stainless Steel Clad Reinforcement

South Dakota Department of Transportation, $70000.00, 2002, Active

Actions: Preview Abstract

to

Use YYYY or YYYYMM format

Modify | New Search | History