Research in Progress
Text Size:

Mark: All | None | Show

Your Search
2013-05-20
PROJECT: Evaluation of Static Resistance of Deep Foundation

Florida Department of Transportation, $299526.00, 2013, Active

Actions: Preview Abstract

2013-04-01
PROJECT: Iowa ABC Connections

Iowa Department of Transportation, $99897.00, 2013, Active

Actions: Preview Abstract

2013-04-01
2013-03-07
PROJECT: Development of Improved Connection Details for Adjacent Prestressed Member Bridges

Virginia Department of Transportation, $144000.00, 2013, Active

Actions: Preview Abstract

2013-03-01
PROJECT: 3D Laser Scanning for Quality Control and Assurance in Bridge Deck Construction

Center for Advanced Infrastructure & Transportation, $40000.00, 2013, Active

Actions: Preview Abstract

2013-02-01
PROJECT: Durability Assessment of Prefabricated Bridge Elements and Systems

Maryland Department of Transportation, $120641.00, 2013, Active

Actions: Preview Abstract

2013-01-02
2012-12-15
PROJECT: In-Service Performance Evaluation and Monitoring of the Hybrid Composite Beam Bridge System

Virginia Department of Transportation, $102246.00, 2012, Active

Actions: Preview Abstract

2012-12-01
PROJECT: NCHRP 24-38 Payload Project - Development of Bridge Girder Movement Criteria for Accelerated Bridge Construction

Center for Infrastructure Engineering Studies, $229887.00, 2012, Active

Actions: Preview Abstract

2012-11-01
PROJECT: Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects

Iowa State University, Ames, $49986.00, 2012, Active

Actions: Preview Abstract

2012-10-01
PROJECT: Design and Construction Guidelines for Strengthening Bridges using FRP

Michigan Department of Transportation, $164523.00, 2012, Active

Actions: Preview Abstract

2012-07-16
PROJECT: Reorganization of Section 5, Concrete Structures, of the AASHTO LRFD Bridge Design Specifications

Federal Highway Administration, $430000.00, 2012, Proposed

Actions: Preview Abstract

2012-07-01
PROJECT: Optimizing Concrete Deck Removal in Concrete I-Girder Bridges

Mid-America Transportation Center, $56867.00, 2012, Active

Actions: Preview Abstract

2012-07-01
PROJECT: Developing Short-Span Alternatives to Reinforced Concrete Box Culvert Structures in Kansas (Phase 2)

Kansas Department of Transportation, $58000.00, 2012, Proposed

Actions: Preview Abstract

2012-07-01
PROJECT: Investigation of Closure Pour Elimination for Phased Construction of Steel Girder Bridges

Nebraska Department of Roads, $75264.00, 2012, Active

Actions: Preview Abstract

2012-06-01
PROJECT: Repair of Floorbeam-to-Stringer Connections Affected by Distortion-Induced Fatigue

Mid-America Transportation Center, $72884.00, 2012, Active

Actions: Preview Abstract

2012-06-01
PROJECT: Evaluation of Pile Load Tests for Use in Missouri LRFD Guidelines

Mid-America Transportation Center, $51821.00, 2012, Active

Actions: Preview Abstract

2012-06-01
PROJECT: Accelerated Bridge Construction Deck Panel Testing

Center for Advanced Infrastructure & Transportation, $38723.00, 2012, Active

Actions: Preview Abstract

2012-05-29
PROJECT: Determination of Brace Forces Caused by Construction Loads and Wind Loads During Bridge Construction

Florida Department of Transportation, $104813.00, 2012, Active

Actions: Preview Abstract

2012-01-15
PROJECT: Buchanan County IBRD Bridge Project: Evaluation of the Bridge on Victor Avenue over Prairie Creek

Iowa Department of Transportation, $99999.00, 2012, Active

Actions: Preview Abstract

2012-01-01
2012-01-01
PROJECT: Seismic Retrofit of Spliced Sleeve Connections for Precast Bridge Piers

Mountain-Plains Consortium, $44138.00, 2012, Active

Actions: Preview Abstract

2012-01-01
PROJECT: Evaluation of Spliced Sleeve Connections for Precast Reinforced Concrete Bridge Piers

Mountain-Plains Consortium, $179148.00, 2012, Active

Actions: Preview Abstract

to

Use YYYY or YYYYMM format

Modify | New Search | History