Site Logo
Bookmark and Share
Browse Projects > Organization > National Cooperative Highway Research Program
View projects added within:

National Cooperative Highway Research Program
Transportation Research Board
500 Fifth Street, NW
Washington, DC 20001
USA

Number of matches: 1026

Research for the AASHTO Standing Committee on the Environment. Task 64. Feasibility Study of Using Solar or Wind Power for Transportation Infrastructure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2846
Start date: 2010
Status: Proposed
Contract/Grant Number: Project 25-25, Task 64
Total Dollars: 125000
Source Organization: Transportation Research Board
Date Added: 11/03/2009

Research for the AASHTO Standing Committee on the Environment. Task 65. Synthesis of Greenhouse Gas Emission Inventory Methodologies for State Transportation Departments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2848
Start date: 2009/11/3
Status: Proposed
Contract/Grant Number: Project 25-25, Task 65
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/03/2009

Research for the AASHTO Standing Committee on the Environment. Task 66. Best Practices and Lessons Learned on the Preservation and Rehabilitation of Historic Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2849
Start date: 2009/11/3
Status: Proposed
Contract/Grant Number: Project 25-25, Task 66
Total Dollars: 80000
Source Organization: Transportation Research Board
Date Added: 11/03/2009

Research for the AASHTO Standing Committee on the Environment. Task 67. Optimizing Conservation and Improving Mitigation Cost/Benefit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2850
Start date: 2009/11/3
Status: Proposed
Contract/Grant Number: Project 25-25, Task 67
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/03/2009

Research for the AASHTO Standing Committee on the Environment. Task 68. Implementing Measures to Reduce Highway Impacts on Habitat Fragmentation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2851
Start date: 2009/11/3
Status: Proposed
Contract/Grant Number: Project 25-25, Task 68
Total Dollars: 80000
Source Organization: Transportation Research Board
Date Added: 11/03/2009

An Acoustic Emission-Based Test to Determine Asphalt Binder and Mixture Embrittlement Temperature
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2852
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 144
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Shape Memory Alloy Enhanced SMART Bridge Expansion Joints
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2853
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 147
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Use of Energy Absorbing Breakaway Posts for W-Beam Guardrail in Frozen Soil Conditions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2854
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 149
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Extraction of Layer Properties from Intelligent Compaction Data
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2855
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 145
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Advanced Methods for Mobile Retroreflectivity Measurement on Pavement Marking
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2856
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 146
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Cleaning Mechanism to Remove Debris and Chemicals for Crack/Joint Sealing
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2857
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 148
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Automated Laser Spectrographic Pattern Matching for Aggregate Identification
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2858
Start date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-30, IDEA 150
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 10/26/2009

Performance-Related Specifications for Pavement Preservation Treatments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2713
Start date: 2010/4/1
Status: Proposed
Contract/Grant Number: Project 10-82
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 09/30/2009

Measuring Performance Among State DOTs, Sharing Best Practices' Preservation: Comparative Analysis of Bridge Conditions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2752
Start date: 2009/9/3
End date: 2010/6/2
Status: Active
Contract/Grant Number: Project 20-24(37)E
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 09/28/2009

Research for AASHTO Standing Committee on Highways. Task 266. Development of an Alternative Calibration Method for AASHTO T 153
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2479
Start date: 2009/4/13
End date: 2009/12/12
Status: Active
Contract/Grant Number: Project 20-07, Task 266
Total Dollars: 58000
Source Organization: Transportation Research Board
Date Added: 09/25/2009

A Guide to Transportation and Hazards Resources
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=643
Start date: 2007/8/17
End date: 2009/1/31
Status: Completed
Contract/Grant Number: Project 20-59(24)
Total Dollars: 37500
Source Organization: Transportation Research Board
Date Added: 09/18/2009

Methodologies to Estimate the Economic Impacts of Disruptions to the Goods Movement System
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2609
Start date: 2009/9/12
Status: Proposed
Contract/Grant Number: Project 20-59(34)
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 09/11/2009

A Transportation Guide for All-Hazards Emergency Evacuation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2607
Start date: 2009/9/5
Status: Proposed
Contract/Grant Number: Project 20-59(32)
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 09/04/2009

Production of the New AASHTO Practical Guide to Estimating
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2758
Start date: 2009/9/5
Status: Proposed
Contract/Grant Number: Project 20-07, Task 278
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 09/04/2009

AASHTO Materials Specifications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2760
Start date: 2009/9/4
Status: Proposed
Contract/Grant Number: Project 20-07, Task 280
Total Dollars: 90000
Source Organization: Transportation Research Board
Date Added: 09/03/2009

Update the 2003 Report Reducing Greenhouse Gas Emissions from U.S. Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2753
Start date: 2009/9/2
Status: Proposed
Contract/Grant Number: Project 20-24(70)
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 09/01/2009

Expediting NEPA: Practitioner Strategies for Early Identification of and Response to High Risk Issues
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2754
Start date: 2009/9/2
Status: Proposed
Contract/Grant Number: Project 20-24(71)
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 09/01/2009

Maximizing Highway Operational Strategies to Reduce Greenhouse Gas (GHG) Emissions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2755
Start date: 2009/9/2
Status: Proposed
Contract/Grant Number: Project 20-24(72)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 09/01/2009

Research for AASHTO Standing Committee on Highways, Task 276. Development of Guidelines for Rehabilitation of Existing Highway and Rail Transit Tunnels
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2756
Start date: 2009/11/4
End date: 2010/8/3
Status: Active
Contract/Grant Number: Project 20-07, Task 276
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 08/31/2009

Establish Test Methods for 100-Year Service Life for HDPE Thermoplastic Pipe in the AASHTO LRFD Bridge Design Specifications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2764
Start date: 2009/8/26
Status: Proposed
Contract/Grant Number: Project 20-07, Task 284
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 08/25/2009

Evaluation of the Flashing Yellow Arrow (FYA) Permissive Left Turn in Shared Yellow Signal Sections
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2763
Start date: 2009/8/13
Status: Proposed
Contract/Grant Number: Project 20-07, Task 283
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 08/12/2009

Guidance for Design and Selection of Pipes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2477
Start date: 2009/6/22
End date: 2011/1/21
Status: Active
Contract/Grant Number: Project, 20-07, Task 264
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 07/29/2009

Feasibility of Using Incentives to Facilitate Utility Relocations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2597
Start date: 2009/7/30
Status: Proposed
Contract/Grant Number: Project 20-07, Task 269
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 07/29/2009

Rheological Characterization of Flow Table Reference Material
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2600
Start date: 2009/6/18
End date: 2010/6/17
Status: Active
Contract/Grant Number: Project 20-07, Task 272
Total Dollars: 90000
Source Organization: Transportation Research Board
Date Added: 07/29/2009

Sustainability Performance Measures for State Departments of Transportation and Other Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2500
Start date: 2009/7/9
End date: 2011/7/8
Status: Active
Contract/Grant Number: Project 8-74
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 07/09/2009

Pre-Event Planning to Support Transportation Infrastructure Recovery
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2608
Start date: 2009/11/1
Status: Proposed
Contract/Grant Number: Project 20-59(33)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 06/18/2009

Measuring Performance among State DOTs: Sharing Good Practices -- Construction Project Cost and Schedule
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2484
Start date: 2006/9/8
End date: 2007/5/7
Status: Completed
Contract/Grant Number: 20-24(37)A
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 06/11/2009

Measuring Performance Among State DOTs, Sharing Best Practices--Operations Performance Using Incident Response Time
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2751
Start date: 2009/11/19
End date: 2010/5/19
Status: Active
Contract/Grant Number: Project 20-24(37)D
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 06/04/2009

Synthesis of Information Related to Highway Problems. Topic 41-01. Geometric Design Practices for Resurfacing, Restoration, and Rehabilitation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2739
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-01
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Task 41-02. Effective Delivery of Small-Scale Federal Aid Requirements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2740
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-02
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Task 41-03. Engineering Economic Analysis Practices for Highway Investment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2741
Start date: 2009/5/21
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-03
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-04. Sustainable Pavement Maintenance Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2742
Start date: 2009/5/21
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-04
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-05. Design Fires in Road Tunnels
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2743
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-05
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-06. Accelerating Implementation of Transportation Research Results
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2744
Start date: 2009/5/21
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-06
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-07. Operational and Institutional Agreements that Facilitate Regional Traffic Signal Operations Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2745
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-07
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-08. Implementing Race-Neutral Measures in State Disadvantaged Business Enterprise (DBE) Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2746
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-08
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-09. Techniques for Effective Construction of Highway Projects in Congested Urban Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2747
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-09
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-10. Developing Production Pile Driving Criteria from Test Pile Data
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2748
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-10
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-11. Transportation Improvement Program Revision Process
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2749
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-11
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Synthesis of Information Related to Highway Problems. Topic 41-12. Microsurfacing Best Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2750
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 41-12
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 05/20/2009

Incorporating Pavement Preservation into the MEPDG
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2704
Start date: 2010/3/15
Status: Proposed
Contract/Grant Number: Project 1-48
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Guidelines for Conducting Forensic Investigation of Highway Pavements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2705
Start date: 2010/2/28
Status: Proposed
Contract/Grant Number: Project 1-49
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Developing Regional Historic Contexts for Post-World War II Housing: A Model for Identification and Evaluation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2706
Start date: 2009/11/9
Status: Proposed
Contract/Grant Number: Project 8-77
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Estimating Bicycling and Walking for Planning and Project Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2707
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 8-78
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Producing Transportation Data Products from the American Community Survey that Comply with Disclosure Rules
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2708
Start date: 2010/1/1
Status: Proposed
Contract/Grant Number: Project 8-79
Total Dollars: 550000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Performance of WMA Technologies: Stage I--Moisture Susceptibility
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2710
Start date: 2010/5/1
Status: Proposed
Contract/Grant Number: Project 9-49
Total Dollars: 450000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

New Specifications for Structural Supports for Highway Signs, Luminaries, and Traffic Signals
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2711
Start date: 2010/1/1
Status: Proposed
Contract/Grant Number: Project 10-80
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Fuel Usage Factors in Highway and Bridge Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2712
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 10-81
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Alternative Quality Management Systems for Highway Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2714
Start date: 2010/5/1
Status: Proposed
Contract/Grant Number: Project 10-83
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Highway Bridge Fire Hazard Assessment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2715
Start date: 2009/5/15
Status: Proposed
Contract/Grant Number: Project 12-85
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Bridge System Safety and Redundancy
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2716
Start date: 2009/5/19
Status: Proposed
Contract/Grant Number: Project 12-86
Total Dollars: 325000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Consequences of Delayed Maintenance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2717
Start date: 2010/4/1
Status: Proposed
Contract/Grant Number: Project 14-20
Total Dollars: 600000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Resource Allocation Framework to Meet Highway Asset Preservation Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2718
Start date: 2010/2/10
Status: Proposed
Contract/Grant Number: Project 14-21
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Effective Removal of Pavement Markings
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2719
Start date: 2010/4/1
Status: Proposed
Contract/Grant Number: Project 14-22
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Superelevation Criteria for Sharp Horizontal Curves on Steep Grades
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2720
Start date: 2010/4/10
Status: Proposed
Contract/Grant Number: Project 15-39
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Design Guidance for High-Speed to Low-Speed Transition Zones for Rural Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2721
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 15-40
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Sag Vertical Curve Design Criteria for Headlight Sight Distance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2722
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 15-41
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Recommended Bicycle Lane Widths for Various Roadway Characteristics
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2723
Start date: 2010/3/10
Status: Proposed
Contract/Grant Number: Project 15-42
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Guidelines for Cost-Effective Safety Treatments of Roadside Ditches
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2724
Start date: 2010/2/1
Status: Proposed
Contract/Grant Number: Project 16-05
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Comprehensive Analysis Framework for Safety Investment Decisions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2725
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 17-46
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Human Factors Guidelines for Road Systems-Phase IV
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2726
Start date: 2009/10/22
End date: 2011/10/21
Status: Active
Contract/Grant Number: Project 17-47
Total Dollars: 499941
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Highway Infrastructure and Operations Safety Research Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2727
Start date: 2010/3/10
Status: Proposed
Contract/Grant Number: Project 17-48
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Effects of Socio-Demographics on Travel Demand
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2728
Start date: 2009/12/16
Status: Proposed
Contract/Grant Number: Project 20-83(06)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Sustainable Transportation Systems and Sustainability as an Organizing Principle for Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2729
Start date: 2010
Status: Proposed
Contract/Grant Number: Project 20-83(07)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Improved Right-of-Way Procedures and Business Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2730
Start date: 2010/4/1
Status: Proposed
Contract/Grant Number: Project 20-84
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Renewable Energy Guide for Highway Maintenance Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2731
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 20-85
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Attracting, Recruiting, and Retaining Skilled Staff for Transportation System Operations and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2732
Start date: 2010/2/1
Status: Proposed
Contract/Grant Number: Project 20-86
Total Dollars: 225000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Design Guidelines for TL-3 through TL-5 Roadside Barrier Systems Placed on Mechanically Stabilized Earth (MSE) Retaining Walls
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2735
Start date: 2010/1/1
Status: Proposed
Contract/Grant Number: Project 22-20(02)
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Risk-Based Approach to Bridge Scour Prediction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2736
Start date: 2010/3/1
Status: Proposed
Contract/Grant Number: Project 24-34
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Measuring and Removing Dissolved Metals from Storm Water in Highly Urbanized Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2737
Start date: 2009/5/19
Status: Proposed
Contract/Grant Number: Project 25-32
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Evaluating Methodologies for Visual Impact Assessments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2738
Start date: 2009/5/19
Status: Proposed
Contract/Grant Number: Project 25-33
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 05/18/2009

Research for the AASHTO Standing Committee on Planning. Task 69. Peer Review Sessions to be Amended into NCHRP 8-36(53)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1283
Start date: 2006/6/21
End date: 2007/2/20
Status: Completed
Contract/Grant Number: Project 8-36, Task 69
Total Dollars: 130000
Source Organization: Transportation Research Board
Date Added: 05/04/2009

Research for the AASHTO Standing Committee on Planning. Task 76. Conference on Best Practices in Meeting SAFETEA-LU Requirements in the Statewide Transportation Planning Process
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2396
Start date: 2009/5/4
End date: 2008/11/21
Status: Completed
Contract/Grant Number: Project 8-36, Task 76
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 05/01/2009

Guidelines for Geofoam Applications in Slope Stability Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2642
Start date: 2006/10/2
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project 24-11(02)
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 04/22/2009

Computer Vision Traffic Sensor for Fixed and Pan-Tilt-Zoom Cameras
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2700
Start date: 2009/4/23
Status: Active
Contract/Grant Number: Project 20-30, IDEA 140
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/22/2009

Reducing Fatigue in Wind-Excited Traffic Signal Support Structures using Smart Damping Techniques
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2701
Start date: 2009/4/23
Status: Active
Contract/Grant Number: Project 20-30, IDEA 141
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/22/2009

A Shape Memory Polymer Based Self-Healing Sealant for Expansion Joint
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2702
Start date: 2009/4/23
Status: Active
Contract/Grant Number: Project 20-30, IDEA 142
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/22/2009

A 3-D Specimen and Multiple Functional Digital Tester for Performance Evaluation of Asphalt Mixes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2080
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 110
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Development of a Simple Test to Determine the Low Temperature Creep Compliance of Asphalt Mixtures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2589
Start date: 2009/4/22
Status: Completed
Contract/Grant Number: Project, 20-30, IDEA 133
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Investigation of a Full-Lane Acoustic Scanning Method for Bridge Deck NDE
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2590
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 134
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Active Confinement of Bridge Piers Using Shape Memory Alloys
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2591
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 135
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Development of a Second Generation Neutron-Based Detector for Chloride in Concrete
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2592
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 136
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Real-Time Remote Evaluation of Post-Event Residual Capacity of Highway Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2593
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 137
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Scanning Capacitive Arrays for Real-Time, In-Situ Imaging of Density and Thickness in HMA Roadways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2594
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 138
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Development of Sensing Methodology for Intelligent and Reliable Work Zone Hazard Awareness
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2595
Start date: 2009/4/22
Status: Active
Contract/Grant Number: Project 20-30, IDEA 139
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/21/2009

Model Curriculum for Highway Safety Core Competencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=465
Start date: 2007/4/4
End date: 2009/12/30
Status: Active
Contract/Grant Number: Project 17-40
Total Dollars: 394995
Source Organization: Transportation Research Board
Date Added: 04/09/2009

Price Indexing in Transportation Construction Contracts
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2602
Start date: 2009/8/31
End date: 2010/11/30
Status: Active
Contract/Grant Number: Project 20-07, Task 274
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 03/13/2009

SCOH Strategic Plan Support
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2603
Start date: 2009/1/16
End date: 2010/1/15
Status: Active
Contract/Grant Number: Project 20-07, Task 275
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 02/27/2009

Research for the AASHTO Standing Committee on Planning. Task 90. Best Practices in the Use of Microsimulation Models
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2637
Start date: 2009/4/3
End date: 2010/4/2
Status: Active
Contract/Grant Number: Project 8-36, Task 90
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 02/27/2009

Research for the AASHTO Standing Committee on Planning. Task 91. Validation and Sensitivity Considerations for Statewide Models
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2638
Start date: 2009/4/7
End date: 2010/4/6
Status: Active
Contract/Grant Number: Project 8-36, Task 91
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 02/27/2009

Research for the AASHTO Standing Committee on Planning. Task 93. Road Pricing Communication Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2640
Start date: 2009/4/7
End date: 2010/4/6
Status: Active
Contract/Grant Number: Project 8-36, Task 93
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 02/27/2009

Measuring Performance Among State DOTs, Sharing Best Practices -- Safety
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2483
Start date: 2008/10/29
End date: 2009/7/28
Status: Completed
Contract/Grant Number: Project 20-24(37)C
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 02/19/2009

Estimating the Costs to State Governments Due to Highway-Related Debilitating Injury and Fatal Crashes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2625
Start date: 2009/4/6
End date: 2010/7/5
Status: Active
Contract/Grant Number: Project 20-24(68)
Total Dollars: 99940
Source Organization: Transportation Research Board
Date Added: 02/19/2009

Long-Range Strategic Issues Affecting Preservation, Maintenance, and Renewal of Highway Infrastructure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2630
Start date: 2009/10/1
Status: Proposed
Contract/Grant Number: Project 20-83(03)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 02/19/2009

Accelerating the Rate of Innovation Among State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2657
Start date: 2009/2/19
Status: Active
Contract/Grant Number: Project 20-68B
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 02/18/2009

Accelerating the Rate of Innovation Among State DOTs--Tracing Domestic Scan Impacts
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2658
Start date: 2009/2/9
End date: 2009/10/27
Status: Active
Contract/Grant Number: Project 20-68B(01)
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 02/18/2009

Potential for Saving Lives with Various Countermeasures to Meet AASHTO's New Safety Goal
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2480
Start date: 2008/10/16
End date: 2009/7/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 267
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 02/10/2009

The Guayule Plant: A Renewable, Domestic Source of Binder Materials for Flexible Pavement Mixtures
http://utc.mst.edu/research/R253.html
Start date: 2009/2/1
End date: 2011/1/31
Status: Active
Contract/Grant Number: DTRT06-G-0014
Total Dollars: 286359
Source Organization: Missouri University of Science and Technology
Date Added: 02/06/2009

Implementable Strategies for Shifting to Direct Usage-Based Charges for Transportation Funding
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2626
Start date: 2009/2/6
End date: 2009/9/6
Status: Completed
Contract/Grant Number: Project 20-24(69)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 02/06/2009

Right of Way Methods and Tools to Control Project Cost Escalation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2656
Start date: 2006/9/30
End date: 2008/6/15
Status: Completed
Contract/Grant Number: Project 8-49(02)
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/29/2009

Research for the AASHTO Standing Committee on the Environment. Task 56. Cost and Benefit of Transportation Specific MS4 and Construction Permitting
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2617
Start date: 2009/5/11
End date: 2010/5/10
Status: Active
Contract/Grant Number: Project 25-25, Task 56
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Research for the AASHTO Standing Committee on the Environment. Task 60. Increased Use of Environmentally Preferable, Non-Toxic Products to Reduce Costs, Liabilities, and Pollution at DOT Offices, Maintenance Facilities and Rest Stops
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2618
Start date: 2009/4/8
End date: 2010/4/7
Status: Active
Contract/Grant Number: Project 25-25, Task 60
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Research for the AASHTO Standing Committee on the Environment. Task 61. Best Practices for Establishing and Maintaining Statewide Cultural Resource Databases at State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2619
Start date: 2009/7/15
End date: 2010/7/14
Status: Active
Contract/Grant Number: Project 25-25, Task 61
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

AASHTO Workshop to Develop Integrated Policy Approaches to Slow VMT Growth and to Increase Transportation System Efficiency
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2620
Start date: 2009/1/27
Status: Proposed
Contract/Grant Number: Project 25-25, Task 57
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Research for the AASHTO Standing Committee on the Environment. Task 58. Methods to Address Greenhouse Gas Emissions from Transportation Construction/Maintenance/Operations Activities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2621
Start date: 2009/6/17
End date: 2010/6/17
Status: Active
Contract/Grant Number: Project 25-25, Task 58
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Research for the AASHTO Standing Committee on the Environment. Task 59. Evaluate the Interactions between Transportation-Related Particulate Matter, Ozone, Air Toxics, Climate Change, and Other Air Pollutant Control Strategies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2623
Start date: 2009/5/28
End date: 2010/5/27
Status: Active
Contract/Grant Number: Project 25-25, Task 59
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Research for the AASHTO Standing Committee on the Environment. Task 63. Transportation Corridor Environmental Management Framework
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2624
Start date: 2009/4/1
End date: 2010/4/1
Status: Active
Contract/Grant Number: Project 25-25, Task 63
Total Dollars: 70000
Source Organization: Transportation Research Board
Date Added: 01/26/2009

Assessment of State-of-the-Practice for Identifying Earth Retaining Structure (ERS)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2472
Start date: 2008/10/20
End date: 2009/11/25
Status: Completed
Contract/Grant Number: Project 20-07, Task 259
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/23/2009

Properties and Performance of Warm Mix Asphalt Technologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2627
Start date: 2009/7/13
End date: 2013/1/12
Status: Active
Contract/Grant Number: Project 9-47A
Total Dollars: 850000
Source Organization: Transportation Research Board
Date Added: 01/21/2009

Economic Changes Driving Future Freight Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2629
Start date: 2009/10/21
End date: 2011/7/21
Status: Active
Contract/Grant Number: Project 20-83(01)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 01/07/2009

Climate Change and the Highway System: Impacts and Adaptation Approaches
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2631
Start date: 2009/10/1
Status: Proposed
Contract/Grant Number: Project 20-83(05)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 01/06/2009

Effects of Changing Transportation Energy Supplies and Alternative Fuel Sources on Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2632
Start date: 2009/1/7
Status: Proposed
Contract/Grant Number: Project 20-83(04)
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 01/06/2009

Application of AASHTO LRFD Specifications to Design of Sound Barriers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2598
Start date: 2009/4/1
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 20-07, Task 270
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/31/2008

Evaluation of Bridge-Scour Research: Geomorphic Processes and Predictions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1599
Start date: 2009/6/18
End date: 2010/12/17
Status: Active
Contract/Grant Number: Project 24-27(03)
Total Dollars: 130000
Source Organization: Transportation Research Board
Date Added: 12/29/2008

Design Guidance for Freeway Mainline Ramp Terminals
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2568
Start date: 2008/11/11
End date: 2010/11/10
Status: Active
Contract/Grant Number: Project 15-31A
Total Dollars: 380000
Source Organization: Transportation Research Board
Date Added: 12/17/2008

Expediting Future Technologies for Enhancing Transportation System Performance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2633
Start date: 2009/10/22
End date: 2011/10/21
Status: Active
Contract/Grant Number: Project 20-83(02)
Total Dollars: 999780
Source Organization: Transportation Research Board
Date Added: 12/12/2008

Long-Range Strategic Issues Facing the Transportation Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2628
Start date: 2008/12/12
Status: Proposed
Contract/Grant Number: Project 20-83
Total Dollars: 5000000
Source Organization: Transportation Research Board
Date Added: 12/11/2008

Review and Update of the AASHTO Guide Specifications for Seismic Isolation Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2475
Start date: 2008/9/23
End date: 2009/9/22
Status: Active
Contract/Grant Number: Task 20-07, Task 262
Total Dollars: 84916
Source Organization: Transportation Research Board
Date Added: 11/11/2008

Developing an Asset-Management Framework for the Interstate Highway System
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=660
Start date: 2007/4/2
End date: 2009/1/1
Status: Completed
Contract/Grant Number: Project 20-74
Total Dollars: 499922
Source Organization: Transportation Research Board
Date Added: 11/06/2008

Research for AASHTO Standing Committee on Highways . Task 271. Graphical Traffic Signal Design Aid based on the MUTCD
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2599
Start date: 2009/5/19
End date: 2010/5/19
Status: Active
Contract/Grant Number: Project 20-07, Task 271
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/03/2008

Implications of Performance Standards, Conformity-Style Approaches, and Other Mechanisms for Assessing Greenhouse Gas (GHG) Reduction Strategies and Integrating GHG Objectives into Transportation Decision Making
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2481
Start date: 2009/1/5
End date: 2010/1/4
Status: Active
Contract/Grant Number: Project 20-24(64)
Total Dollars: 367000
Source Organization: Transportation Research Board
Date Added: 10/29/2008

Strengthened Economic Basis for Systematic Selection of Highway and Transit Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2482
Start date: 2008/10/30
Status: Terminated
Contract/Grant Number: Project 20-24(65)
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 10/29/2008

Update of Technology and Alternative Fuels Assessment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2485
Start date: 2008/10/30
Status: Terminated
Contract/Grant Number: Project 20-24(66)
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 10/29/2008

State DOT CEO Leadership Forum- Spring/Summer 2009; Pilot Study of State Driven Performance Based Management Reporting
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2486
Start date: 2008/10/7
End date: 2010/5/25
Status: Active
Contract/Grant Number: Project 20-24(67)
Total Dollars: 148555
Source Organization: Transportation Research Board
Date Added: 10/29/2008

Research for the AASHTO Standing Committee on Public Transportation. Task 17. Compliance Monitoring Tools
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2455
Start date: 2008/4/2
End date: 2009/4/1
Status: Completed
Contract/Grant Number: Project 20-65, Task 17
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 10/27/2008

State DOT Best Practices for Developing a Title VI Civil Rights Program Document
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2467
Start date: 2008/4/2
End date: 2009/5/1
Status: Completed
Contract/Grant Number: Project 20-65, Task 18
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 10/27/2008

Research for the AASHTO Standing Committee on Public Transportation. Task 19. Utilization by States of the Flexibility to Transfer Federal Funds Among Eligible Federal Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2468
Start date: 2008/3/21
End date: 2009/3/15
Status: Completed
Contract/Grant Number: Project 20-65, Task 19
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 10/27/2008

Research for the AASHTO Standing Committee on Public Transportation. Task 20. Analysis of Rural Intercity Bus Strategy
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2469
Start date: 2008/4/2
End date: 2009/3/1
Status: Active
Contract/Grant Number: Project 20-65, Task 20
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 10/27/2008

Sensitivity Evaluation of MEPDG Performance Prediction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2487
Start date: 2008/10/3
Status: Active
Contract/Grant Number: Project 1-47
Total Dollars: 249952
Source Organization: Transportation Research Board
Date Added: 10/01/2008

Sustainablility Performance Measures for State Departments of Transportation and Other Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2500
Start date: 2009/3/1
Status: Proposed
Contract/Grant Number: Project 8-74
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 09/23/2008

Accelerating Opportunities for Innovation in the Highway Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=611
Start date: 2000/4/3
End date: 2009/6/1
Status: Completed
Contract/Grant Number: Project 20-54
Total Dollars: 170000
Source Organization: Transportation Research Board
Date Added: 09/18/2008

Update of the AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2476
Start date: 2009/2/25
End date: 2009/10/25
Status: Active
Contract/Grant Number: Project 20-07, Task 263
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 09/17/2008

Transportation Systems Operations and Management Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2488
Start date: 2009/2/20
End date: 2010/12/19
Status: Active
Contract/Grant Number: Project 3-94
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 09/15/2008

Structural Design Requirements for Culvert Joints
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2510
Start date: 2009/5/29
End date: 2011/11/28
Status: Active
Contract/Grant Number: Project 15-38
Total Dollars: 370000
Source Organization: Transportation Research Board
Date Added: 09/12/2008

Novel Fiber Optic Sensors for Monitoring Bridge Structural Integrity
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2094
Start date: 2008/9/2
Status: Completed
Contract/Grant Number: Project 20-30, IDEA 124
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

An Autonomous and Self-Sustained Sensing System to Monitor Water Quality Near Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2095
Start date: 2008/9/2
Status: Active
Contract/Grant Number: Project 20-30, IDEA 125
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Developing Time Domain Reflectometry (TDR) Instrument for Fresh Concrete and Early Stage Concrete
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2096
Start date: 2008/9/2
Status: Active
Contract/Grant Number: Project 20-30, IDEA 126
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Instrumentation to Aid in Steel Bridge Fabrication
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2097
Start date: 2008/9/2
Status: Active
Contract/Grant Number: Project 20-30, IDEA 127
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Underwater Fiber-Reinforced Polymer Repair of Corroding Piles Incorporating Cathodic Protection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2435
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project 20-30, IDEA 128
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Developing Embedded Wireless Strain/Stress/Temperature Sensors Platform for Highway Applications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2436
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project 20-30, IDEA 129
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Rapid, Self-Contained in Situ Permeameter for Field QC/QA of Pavement Base/Subbase Materials
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2437
Start date: 2008/9/2
Status: Active
Contract/Grant Number: Project 20-30, IDEA 130
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Smart Sensor for Autonomous Noise Monitoring
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2438
Start date: 2008/9/2
Status: Completed
Contract/Grant Number: Project 20-30, IDEA 131
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Vehicle-Mounted Bridge Deck Scanner
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2439
Start date: 2008/9/2
Status: Active
Contract/Grant Number: Project 20-30, IDEA 132
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Developing Reliability-Based Bridge Inspection Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2507
Start date: 2009/4/20
End date: 2010/12/19
Status: Active
Contract/Grant Number: Project 12-82
Total Dollars: 399930
Source Organization: Transportation Research Board
Date Added: 08/27/2008

Research for the AASHTO Standing Committee on Public Transportation. Task 21. Cost/Benefit Analysis of Converting a Lane for Bus Rapid Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2470
Start date: 2008/4/8
End date: 2009/4/1
Status: Completed
Contract/Grant Number: Project 20-65, Task 21
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 08/12/2008

Security Research Plan
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2327
Start date: 2007/1/25
End date: 2007/10/24
Status: Completed
Contract/Grant Number: Project 20-59(25)
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 08/08/2008

National Needs Assessment for Ensuring Transportation Infrastructure Security (2009-2015)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2328
Start date: 2007/3/1
End date: 2008/9/30
Status: Completed
Contract/Grant Number: Project 20-59(26)
Total Dollars: 97661
Source Organization: Transportation Research Board
Date Added: 08/08/2008

Costs of Alternative Revenue-Generation Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2513
Start date: 2009/3/4
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project 19-08
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 08/07/2008

Operation of Traffic Systems in Oversaturated Conditions
http://www.cts.umn.edu/Research/ProjectDetail.html?id=2008053
Start date: 2008/1/1
End date: 2010/3/31
Status: Active
Total Dollars: 111000
Source Organization: University of Minnesota, Minneapolis
Date Added: 08/01/2008

Development of Design Methods for In-Stream Flow Control Structures
http://www.cts.umn.edu/Research/ProjectDetail.html?id=2008070
Start date: 2008/4/1
End date: 2011/3/21
Status: Active
Total Dollars: 600000
Source Organization: University of Minnesota, Minneapolis
Date Added: 08/01/2008

Arterial Performance Measures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2567
Start date: 2008/9/10
End date: 2010/3/10
Status: Active
Contract/Grant Number: Project 3-79A
Total Dollars: 225000
Source Organization: Transportation Research Board
Date Added: 07/25/2008

Research for AASHTO Standing Committee on Highways. Task 260. Development of Guidelines for Conducting Effective Customer Surveys Related to Highway Maintenance Operations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2473
Start date: 2008/8/15
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 20-07, Task 260
Total Dollars: 74859
Source Organization: Transportation Research Board
Date Added: 07/11/2008

Research for AASHTO Standing Committee on Highways. Task 265. Electronic Publications Delivery System: AASHTO's Next Step
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2478
Start date: 2008/9/9
End date: 2009/11/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 265
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 07/11/2008

Measuring Performance Among State DOTs: Sharing Good Practices Based on the International Roughness Index
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1972
Start date: 2007/9/19
End date: 2008/5/18
Status: Completed
Contract/Grant Number: Project 20-24(37)B
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 06/30/2008

Research for AASHTO Standing Committee on Highways. Task 261. Best Practices for Implementing Quality Control and Quality Assurance for Tunnel Inspection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2474
Start date: 2008/10/7
End date: 2009/10/6
Status: Completed
Contract/Grant Number: Project 20-07, Task 261
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 06/27/2008

Calibration of LRFD Concrete Bridge Design Specifications for Serviceability
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2508
Start date: 2009/4/20
End date: 2011/10/19
Status: Active
Contract/Grant Number: Project 12-83
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Guidelines for the Load and Resistance Factor Design and Rating of Riveted, Bolted, and Welded Gusset-Plate Connections for Steel Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2509
Start date: 2008/10/1
Status: Active
Contract/Grant Number: Project 12-84
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Design Requirements for Culvert Joints
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2510
Start date: 2009/3/1
Status: Proposed
Contract/Grant Number: Project 15-38
Total Dollars: 370000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Factors Contributing to Median Encroachments and Cross-Median Crashes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2511
Start date: 2009/3/6
End date: 2011/5/6
Status: Active
Contract/Grant Number: Project 17-44
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Enhanced Safety Prediction Methodology and Analysis Tool for Freeways and Interchanges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2512
Start date: 2009/5/11
End date: 2011/11/10
Status: Active
Contract/Grant Number: Project 17-45
Total Dollars: 700000
Source Organization: National Cooperative Highway Research Program
Date Added: 06/19/2008

Guide to Implementing Strategies to Attract and Retain a Capable Transportation Workforce
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2514
Start date: 2009/3/4
End date: 2010/9/4
Status: Active
Contract/Grant Number: Project 20-81
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Next Generation Transportation Pooled Fund (TPF) Website
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2515
Start date: 2009/2/3
End date: 2012/2/2
Status: Active
Contract/Grant Number: Project 20-82
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Factors Related to Serious Injury and Fatal Motorcycle Crashes with Traffic Barriers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2516
Start date: 2009/4/21
End date: 2011/11/30
Status: Active
Contract/Grant Number: Project 22-26
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Roadside Safety Analysis Program (RSAP) Update
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2517
Start date: 2009/1/28
End date: 2010/7/27
Status: Active
Contract/Grant Number: Project 22-27
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Synthesis of Information Related to Highway Problems. Topic 40-10. Traffic Signal Retiming Practices in the U.S.
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2528
Start date: 2008/11/1
End date: 2010/7/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 40-10
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 06/19/2008

Sustainable Transportation Performance Measures for State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2500
Start date: 2008/6/18
Status: Proposed
Contract/Grant Number: Project 8-74
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Guidelines for Evaluation and Performance Measurement of Congestion Pricing Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2501
Start date: 2009/5/1
End date: 2010/11/1
Status: Active
Contract/Grant Number: Project 8-75
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Institutionalizing Safety in Transportation Planning Processes: Techniques, Tactics and Strategies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2502
Start date: 2009/5/11
End date: 2010/9/10
Status: Proposed
Contract/Grant Number: Project 8-76
Total Dollars: 399963
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Field Versus Laboratory Volumetrics and Mechanical Properties
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2503
Start date: 2009/8/1
End date: 2012/2/29
Status: Active
Contract/Grant Number: Project 9-48
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Use of Automated Machine Guidance (AMG) within the Transportation Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2504
Start date: 2009/7/24
End date: 2011/1/23
Status: Active
Contract/Grant Number: Project 10-77
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Nighttime Construction Impacts on Safety, Quality, and Productivity
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2505
Start date: 2009/5/7
End date: 2011/5/6
Status: Active
Contract/Grant Number: Project 10-78
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Guidelines for Quality-Related Pay Adjustment Factors for Pavements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2506
Start date: 2009/5/8
End date: 2011/5/7
Status: Active
Contract/Grant Number: Project 10-79
Total Dollars: 249793
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Validating an Endurance Limit for HMA Pavements: Laboratory Experiment and Algorithm Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2518
Start date: 2009/9/1
End date: 2012/2/29
Status: Active
Contract/Grant Number: Project 9-44A
Total Dollars: 750000
Source Organization: Transportation Research Board
Date Added: 06/17/2008

Guidelines on the Use of Auxiliary Through Lanes at Signalized Intersections
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2492
Start date: 2009/2/27
End date: 2011/2/26
Status: Active
Contract/Grant Number: Project 3-98
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Development and Application of Access Management Guidelines
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2493
Start date: 2009/5/6
End date: 2011/5/25
Status: Active
Contract/Grant Number: Project 3-99
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Characterization of Cementitiously Stabilized Layers for Use in Pavement Design and Analysis
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2494
Start date: 2009/6/17
End date: 2012/6/16
Status: Active
Contract/Grant Number: Project 4-36
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Long-Term Performance of Epoxy Adhesive Anchor Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2495
Start date: 2009/7/10
End date: 2012/7/9
Status: Active
Contract/Grant Number: Project 4-37
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Recommended Laboratory Test for Predicting the Initial Retroreflectivity of Pavement Markings from Glass Bead Quality
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2496
Start date: 2009/6/25
End date: 2012/6/30
Status: Active
Contract/Grant Number: Project 4-38
Total Dollars: 349990
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Methodology for Estimating Life Expectancies of Highway Assets
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2497
Start date: 2009/6/16
End date: 2011/3/16
Status: Active
Contract/Grant Number: Project 8-71
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Practical Approaches for Involving Traditionally Underserved Populations in Transportation Decisionmaking
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2498
Start date: 2009/5/2
End date: 2011/5/20
Status: Active
Contract/Grant Number: Project 8-72
Total Dollars: 396205
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Road Pricing, Public Perceptions and Program Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2499
Start date: 2009/2/2
End date: 2010/5/1
Status: Active
Contract/Grant Number: Project 8-73
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 06/13/2008

Development of an AASHTO Guide for Systems Operations and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2488
Start date: 2008/3/16
Status: Proposed
Contract/Grant Number: Project 3-94
Total Dollars: 450000
Source Organization: Transportation Research Board
Date Added: 06/12/2008

Guidelines for Timing Yellow and All-Red Intervals at Signalized Intersections
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2489
Start date: 2009/3/18
End date: 2011/6/17
Status: Active
Contract/Grant Number: Project 3-95
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 06/12/2008

Analysis of Managed Lanes on Freeway Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2490
Start date: 2009/4/3
End date: 2011/4/2
Status: Active
Contract/Grant Number: Project 3-96
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 06/12/2008

Traffic Signal Analysis with Varying Demands and Capacities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2491
Start date: 2009/3/27
End date: 2011/9/26
Status: Active
Contract/Grant Number: Project 3-97
Total Dollars: 850000
Source Organization: Transportation Research Board
Date Added: 06/12/2008

Task Order Research for the AASHTO Standing Committee on Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2471
Start date: 2008/5/29
Status: Proposed
Contract/Grant Number: Project 20-65A
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 05/29/2008

Research for the AASHTO Standing Committee on the Environment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2429
Start date: 2008/5/12
Status: Proposed
Contract/Grant Number: Project 25-25A
Total Dollars: 600000
Source Organization: Transportation Research Board
Date Added: 04/18/2008

Development of Service Levels for the Interstate Highway System
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1638
Start date: 2008/3/31
End date: 2010/9/30
Status: Active
Contract/Grant Number: Project 20-74A
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 04/17/2008

Research for AASHTO Standing Committee on Highways. Task 429. Asset Management Approaches to ADA Compliance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2330
Start date: 2008/4/2
End date: 2008/10/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 249
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 04/17/2008

Long-Term Remote Sensing System for Bridge Piers
http://utc.mst.edu/research/R195.html
Start date: 2006/10/18
End date: 2009/10/17
Status: Active
Contract/Grant Number: Project 20-30, IDEA 123
Total Dollars: 78936
Source Organization: Missouri University of Science and Technology
Date Added: 04/04/2008

Twenty-First Century Leadership and Management Techniques for State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2428
Start date: 2007/3/21
End date: 2008/9/20
Status: Completed
Contract/Grant Number: Project 20-24(53)
Total Dollars: 136000
Source Organization: Transportation Research Board
Date Added: 04/02/2008

Issues and Practices in Performance-Based Maintenance and Operations Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2115
Start date: 2008/6/8
End date: 2009/6/7
Status: Active
Contract/Grant Number: Project 20-24(61)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 04/01/2008

Identification of Marketing Tools that Resonate with Lawmakers and Key Stakeholders to Support and Increase Funding and Revenue for the Nation's Transportation System
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2368
Start date: 2008/10/8
End date: 2009/11/18
Status: Completed
Contract/Grant Number: Project 20-24(62)
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 04/01/2008

Engineering Properties, Emissions, and Field Performance of Warm Mix Asphalt Technologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1625
Start date: 2008/3/31
End date: 2009/1/8
Status: Completed
Contract/Grant Number: Project 9-47
Total Dollars: 79000
Source Organization: Transportation Research Board
Date Added: 03/31/2008

Research for AASHTO Standing Committee on Highways. Task 255. Development of a Test Method To Determine the Ability of Adhesive Anchors To Resist Sustained Tensile Load
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2333
Start date: 2008/3/13
End date: 2009/5/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 255
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 03/28/2008

Partnership Approaches to Identify, Promote, and Implement Congestion Management Strategies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2369
Start date: 2008/3/3
End date: 2009/3/2
Status: Completed
Contract/Grant Number: Project 20-24(63)
Total Dollars: 125000
Source Organization: Transportation Research Board
Date Added: 03/20/2008

Toward Developing Performance Based Federal-Aid Highway Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2112
Start date: 2008/3/4
End date: 2009/7/3
Status: Active
Contract/Grant Number: Project 20-24(58)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 03/20/2008

Updating AASHTO's Strategic Plan in CY 2008
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2114
Start date: 2007/3/11
End date: 2009/9/10
Status: Active
Contract/Grant Number: Project 20-24(60)
Total Dollars: 175000
Source Organization: Transportation Research Board
Date Added: 03/20/2008

Research for the AASHTO Standing Committee on the Environment. Task 45. Transportation Program Responses to Greenhouse Gas (GHG) Reduction Initiatives and Energy Reduction Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1663
Start date: 2008/5/5
End date: 2009/10/31
Status: Completed
Contract/Grant Number: Project 25-25, Task 45
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 03/14/2008

Research for the AASHTO Standing Committee on the Environment. Task 47. Compendium of Best Practices for Incorporating Environmental Commitments into Transportation Project Construction Contract Documents
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2380
Start date: 2008/6/3
End date: 2009/6/2
Status: Completed
Contract/Grant Number: Project 25-25, Task 47
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 03/14/2008

Research for AASHTO Standing Committee on Highways. Task 236. Modification and Stabilization of Soils and Base for Use in Pavement Structures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1561
Start date: 2007/4/16
End date: 2009/7/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 236
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 03/11/2008

Human Factors Guidelines for Road Systems - Phase III
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1635
Start date: 2008/3/5
End date: 2010/3/4
Status: Active
Contract/Grant Number: Project 17-41
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 03/05/2008

Research Program Design---Administration of Highway and Transportation Agencies. 2006 AASHTO Bottom Line Scoping
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1568
Start date: 2007/11/7
End date: 2009/5/6
Status: Completed
Contract/Grant Number: Project 20-24(54)G
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 02/29/2008

Research for AASHTO Standing Committee on Highways. Task 235. Development of Testing Protocols for Surface Applied Concrete Sealers Treatments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1560
Start date: 2007/10/10
End date: 2009/2/28
Status: Completed
Contract/Grant Number: Project 20-07, Task 235
Total Dollars: 74958
Source Organization: Transportation Research Board
Date Added: 02/21/2008

Research for AASHTO Standing Committee on Highways. Task 250. Update AASHTO "Guide for Snow and Ice Control"
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2331
Start date: 2008/3/31
End date: 2008/12/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 250
Total Dollars: 49800
Source Organization: Transportation Research Board
Date Added: 02/21/2008

Research for AASHTO Standing Committee on Highways. Task 251. Consideration of Pavement Preservation in the AASHTO Mechanistic-Empirical Pavement Design Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2332
Start date: 2008/1/31
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 251
Total Dollars: 70000
Source Organization: Transportation Research Board
Date Added: 02/21/2008

Research for AASHTO Standing Committee on Highways. Task 234. Guidelines for Selection of Bridge Deck Overlays, Sealers, and Treatments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1559
Start date: 2007/8/1
End date: 2008/12/10
Status: Completed
Contract/Grant Number: Project 20-07, Task 234
Total Dollars: 99986
Source Organization: Transportation Research Board
Date Added: 02/21/2008

Validation and Enhancement of the Highway Capacity Manual’s Interchange Ramp Terminal Methodology
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1970
Start date: 2008/2/15
End date: 2009/12/14
Status: Active
Contract/Grant Number: Project 03-60A
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 02/15/2008

Evaluation of Bridge Scour Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1599
Start date: 2008/3/2
Status: Proposed
Contract/Grant Number: Project 24-27(03)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 02/15/2008

US Domestic Scan Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1570
Start date: 2007/12/27
End date: 2010/12/26
Status: Active
Contract/Grant Number: Project 20-68A
Total Dollars: 1500000
Source Organization: Transportation Research Board
Date Added: 02/08/2008

Research for the AASHTO Standing Committee on the Environment. Task 55. Design, Organize and Implement a Training Program for Mainstreaming Environmental Stewardship and Enhancement Activities into Planning and Project Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2381
Start date: 2008/11/3
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 25-25, Task 55
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 54. Evaluate Colorado's Area-wide Cumulative Effects Assessment (ACEA) Methodology as a Mechanism for Cumulative Impacts Analysis of Regional Transportation Plans
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2379
Start date: 2008/7/7
End date: 2009/9/30
Status: Active
Contract/Grant Number: Project 25-25, Task 54
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 53. Stormwater Treatment with Vegetated Buffer
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2378
Start date: 2008/6/20
End date: 2009/10/6
Status: Completed
Contract/Grant Number: Project 25-25, Task 53
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 52. Informational Requirements for Jurisdictional Determinations to be Issued by the Army Corps of Engineers (Corps) Under the Clean Water Act (CWA)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2377
Start date: 2008/11/3
End date: 2009/11/2
Status: Completed
Contract/Grant Number: Project 25-25, Task 52
Total Dollars: 65000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 51. Asset Management of Environmental Mitigation Features
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2376
Start date: 2008/5/29
End date: 2009/5/28
Status: Completed
Contract/Grant Number: Project 25-25, Task 51
Total Dollars: 80000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 50. Finding the Carrot Instead of the Stick - Incentive-Based Approaches for Environmental Compliance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2375
Start date: 2008/6/6
End date: 2009/6/6
Status: Completed
Contract/Grant Number: Project 25-25, Task 50
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 49. Effective Practices for Considering Historic Preservation in Transportation Planning and Early Project Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2374
Start date: 2008/6/20
End date: 2009/7/19
Status: Completed
Contract/Grant Number: Project 25-25, Task 49
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 46. Compendium of Best Practices for Environmental Compliance and Stewardship at Transportation Maintenance Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2373
Start date: 2008/5/23
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 25-25, Task 46
Total Dollars: 74976
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Research for the AASHTO Standing Committee on the Environment. Task 48. Compendium of Environmental Fieldwork Technologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2382
Start date: 2008/9/2
End date: 2009/10/15
Status: Completed
Contract/Grant Number: Project 25-25, Task 48
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 02/07/2008

Left-Turn Accommodations at Unsignalized Intersections
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1611
Start date: 2008/4/24
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project 3-91
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 02/05/2008

Research Program Design---Administration of Highway and Transportation Agencies. Strategies for Reducing the Impacts of Surface Transportation on Global Climate Change
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2113
Start date: 2008/3/18
End date: 2009/3/17
Status: Completed
Contract/Grant Number: Project 20-24(59)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 02/01/2008

Target-Setting Methods and Data Management To Support Performance-Based Resource Allocation by Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2147
Start date: 2008/1/24
End date: 2010/1/23
Status: Active
Contract/Grant Number: Project 08-70
Total Dollars: 700000
Source Organization: Transportation Research Board
Date Added: 01/28/2008

Guidelines for Evaluating and Selecting Modifications to Existing Roadway Drainage Infrastructure to Improve Water Quality in Ultra-Urban Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1642
Start date: 2008/8/8
End date: 2010/8/7
Status: Active
Contract/Grant Number: Project 25-31
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 01/24/2008

Guidelines for Design and Management of Historic Road Corridors
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2341
Start date: 2008/3/27
End date: 2010/1/27
Status: Active
Contract/Grant Number: Project 25-29A
Total Dollars: 215655
Source Organization: National Cooperative Highway Research Program
Date Added: 01/16/2008

The St. Lawrence Seaway: Options to Eliminate Introduction of Nonindigenous Species into the Great Lakes, Phase II
Start date: 2006/3/10
End date: 2007/12/10
Status: Active
Contract/Grant Number: SAIS-P-04-05-A
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 01/11/2008

Transit Research and Development: Federal Role in the National Program
Start date: 2003/10
End date: 2009/11
Status: Active
Contract/Grant Number: SAIS-P-03-05-A
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 01/11/2008

Funding Options for Freight Transportation Projects of National Significance
http://www8.nationalacademies.org/cp/projectview.aspx?key=48748
Start date: 2007/1/5
End date: 2009/3
Status: Active
Contract/Grant Number: SAIS-O-06-04-A
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 01/11/2008

Research for the AASHTO Standing Committee on Planning. Task 66. Improved Methods for Assessing Social, Cultural, and Economic Effects of Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1280
Start date: 2006/8/3
End date: 2008/2/1
Status: Active
Contract/Grant Number: Project 8-36, Task 66
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 75. Research Finders
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2395
Start date: 2007/7/16
End date: 2008/5/15
Status: Active
Contract/Grant Number: Project 8-36, Task 75
Total Dollars: 40000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 74. Customer Research Practices and Applications in Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2393
Start date: 2007/7/17
End date: 2008/7/16
Status: Active
Contract/Grant Number: Project 8-36, Task 74
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 73. Adding Resilience to the Freight System in Statewide and Metropolitan Transportation Plans: Developing a Conceptual Approach
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2394
Start date: 2008/3/12
Status: Proposed
Contract/Grant Number: Project 8-36, Task 73
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 72. Implementing Project Cost Estimation and Management Process Improvements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2392
Start date: 2007/7/18
End date: 2008/7/17
Status: Active
Contract/Grant Number: Project 8-36, Task 72
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 71. Disclosure Avoidance Techniques to Improve ACS Data Availability
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2391
Start date: 2007/9/1
End date: 2009/6/8
Status: Completed
Contract/Grant Number: Project 8-36, Task 71
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 70. Scoping Study for Statewide Travel Forecasting National Model
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2390
Start date: 2007/9/12
End date: 2008/9/12
Status: Completed
Contract/Grant Number: Project 8-36, Task 70
Total Dollars: 70000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 86. Corridor Approaches to Integrating Land Transportation and Land Use
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2405
Start date: 2008/4/25
End date: 2009/6/30
Status: Completed
Contract/Grant Number: Project 8-36, Task 86
Total Dollars: 99942
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 85. Congestion Pricing and Investment Requirements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2404
Start date: 2008/4/2
End date: 2009/6/26
Status: Completed
Contract/Grant Number: Project 8-36, Task 85
Total Dollars: 65000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 83. Transportation Planning Partnerships to Enhance National Parks and Gateway Communities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2401
Start date: 2008/4/2
End date: 2009/10/29
Status: Completed
Contract/Grant Number: Project 8-36, Task 83
Total Dollars: 80000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 81. Enhancing the American Community Survey Data as a Source for Home-to-Work Flows
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2403
Start date: 2008/5/1
End date: 2009/10/1
Status: Completed
Contract/Grant Number: Project 8-36, Task 81
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 80. Synthesis of State Practices in Developing Linear Referencing Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2400
Start date: 2008/4/18
End date: 2009/4/17
Status: Completed
Contract/Grant Number: Project 8-36, Task 80
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 78. Small Community Research and Peer Exchange
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2398
Start date: 2008/3/31
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 78
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 79. Scoping Study for a Freight Data Exchange Network
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2399
Start date: 2008/3/27
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 79
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for AASHTO Standing Committee on Highways. Task 216. Application of LRFD Bridge Design Specifications to High-Strength Structural Concrete: Final Project – Phase I
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1231
Start date: 2006/2/24
End date: 2007/8/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 216
Total Dollars: 33560
Source Organization: Transportation Research Board
Date Added: 01/08/2008

Research for the AASHTO Standing Committee on Planning. Task 47. Effective Organization of Performance Measurement
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1261
Start date: 2004/10/15
End date: 2006/3/15
Status: Completed
Contract/Grant Number: Project 8-36, Task 47
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 01/04/2008

Research for AASHTO Standing Committee on Highways. Task 227. Technology Transfer Guidebooks for Implementation of Innovative Technologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1242
Start date: 2006/11/1
End date: 2007/10/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 227
Total Dollars: 45000
Source Organization: Transportation Research Board
Date Added: 01/04/2008

Research for AASHTO Standing Committee on Highways. Task 238. Conceptual Development of an AASHTO Guide to Systems Operations and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1563
Start date: 2007/9/25
End date: 2007/12/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 238
Total Dollars: 40000
Source Organization: Transportation Research Board
Date Added: 01/02/2008

Research for the AASHTO Standing Committee on Planning. Task 68. Implications of New 8-Hour Control Strategy Development on Transportation Programs, Policies, and Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1282
Start date: 2006/8/11
End date: 2007/8/10
Status: Completed
Contract/Grant Number: Project 8-36, Task 68
Total Dollars: 749999
Source Organization: Transportation Research Board
Date Added: 12/31/2007

Research for the AASHTO Standing Committee on Planning. Task 67. Best Practices in Using Programmatic Investment Strategies in Statewide Transportation Plans
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1281
Start date: 2006/8/11
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project 8-36, Task 67
Total Dollars: 74998
Source Organization: Transportation Research Board
Date Added: 12/31/2007

Research for the AASHTO Standing Committee on Planning. Task 65. Best Practices for Incorporating Commodity Flow Survey and Related Data into the MPO and Statewide Planning Processes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1279
Start date: 2006/7/14
End date: 2008/6/1
Status: Active
Contract/Grant Number: Project 8-36, Task 65
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 12/31/2007

Guide Specification for the Design of Externally Bonded FRP Systems for Repair and Strengthening of Concrete Bridge Elements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=293
Start date: 2007/8/13
End date: 2009/11/12
Status: Active
Contract/Grant Number: Project 10-73
Total Dollars: 449926
Source Organization: Transportation Research Board
Date Added: 12/27/2007

Highway Research and Technology -- International Information Sharing
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=579
Start date: 1993/1/26
End date: 2006/12/31
Status: Active
Contract/Grant Number: Project 20-36
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 12/27/2007

Determining Highway Maintenance Costs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1633
Start date: 2008/4/21
End date: 2010/7/20
Status: Active
Contract/Grant Number: Project 14-18
Total Dollars: 299977
Source Organization: Transportation Research Board
Date Added: 12/27/2007

Identification of Vehicular Impact Conditions Associated with Serious Ran-Off-Road Crashes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=448
Start date: 2001/8/15
End date: 2009/8/31
Status: Active
Contract/Grant Number: Project 17-22
Total Dollars: 634521
Source Organization: Transportation Research Board
Date Added: 12/26/2007

Development of Information and Data to Support Improved Safety Management and Communication of Safety Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1636
Start date: 2008/3/16
Status: Active
Contract/Grant Number: Project 17-42
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 12/26/2007

Security 101: Physical Security Standards for Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2329
Start date: 2006/11/6
End date: 2008/8/31
Status: Completed
Contract/Grant Number: Project 20-59(28)
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/21/2007

Highway Safety Manual Implementation and Training Materials
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=464
Start date: 2008/6/25
End date: 2010/5/31
Status: Active
Contract/Grant Number: Project 17-38
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 12/21/2007

Research for the AASHTO Standing Committee on the Environment. Task 33. National Register of Historic Places Eligibility
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1305
Start date: 2006/12/11
End date: 2007/8/10
Status: Completed
Contract/Grant Number: Project 25-25, Task 33
Total Dollars: 39989
Source Organization: Transportation Research Board
Date Added: 12/21/2007

Research for the AASHTO Standing Committee on the Environment. Task 29. Best Practices Library from the Environmental Stewardship Practices in Construction and Maintenance Compendium
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1301
Start date: 2006/7/11
End date: 2007/7/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 29
Total Dollars: 74933
Source Organization: Transportation Research Board
Date Added: 12/21/2007

Research Program Design---Administration of Highway and Transportation Agencies. Task-Order Support for Research on the Administration of Highway and Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2340
Start date: 2008/2/1
End date: 2009/10/31
Status: Active
Contract/Grant Number: Project 20-24A
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 12/19/2007

Research for the AASHTO Standing Committee on Planning. Task 63. Making North American Industrial Classification System (NAICS) Work for Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1277
Start date: 2006/8/3
End date: 2007/3/2
Status: Completed
Contract/Grant Number: Project 8-36, Task 63
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 12/17/2007

Improved Mix Design, Evaluation, and Materials Management Practices for Hot Mix Asphalt with High Reclaimed Asphalt Pavement Content
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1624
Start date: 2008/4/16
End date: 2010/4/14
Status: Active
Contract/Grant Number: Project 9-46
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 12/17/2007

Sensor Integration for Low-Cost Crash Avoidance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2372
Start date: 2008/3/18
Status: Active
Contract/Grant Number: Safety IDEA Project 13
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 12/12/2007

Research for the AASHTO Standing Committee on the Environment. Task 37. Effective Organizational Structures and Management Practices for Achieving Environmental Stewardship in Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1655
Start date: 2007/11/7
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 25-25, Task 37
Total Dollars: 74998
Source Organization: Transportation Research Board
Date Added: 12/11/2007

Use of Image Pattern Recognition Algorithms for Processing Video Log to Enhance Roadway Infrastructure Data Collection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2091
Start date: 2007/1/1
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project 20-30, IDEA 121
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 12/11/2007

The BCD: A New Instrument for Compaction Control
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2088
Start date: 2007/1/1
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project 20-30, IDEA 118
Total Dollars: 95000
Source Organization: Transportation Research Board
Date Added: 12/11/2007

Device to Precisely Measure Water-Cement Ratio of Fresh Concrete
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2075
Start date: 2007/1/1
Status: Active
Contract/Grant Number: Project 20-30, IDEA 105
Total Dollars: 85000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Evaluation of Al-Zn-In Alloy for Galvanic Cathodic Protection of Bridge Decks
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2070
Start date: 2007/1/1
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project 20-30, IDEA 100
Total Dollars: 76477
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 258. Identification of Cross-Cutting Issues Related to the Development, Management, and Delivery of Transportation Projects and Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2337
Start date: 2008/3/31
End date: 2008/9/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 258
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 257. Crash Tested Precast Concrete Barrier Designs and Anchoring Methods
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2339
Start date: 2008/4/1
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 20-07, Task 257
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 256. Safety Impacts of the Emerging Digital Display Technology for Outdoor Advertising Signs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2334
Start date: 2008/1/21
End date: 2009/4/22
Status: Completed
Contract/Grant Number: Project 20-07, Task 256
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 254. Vehicle Size and Weight Management (VSW) Technology Transfer/Best Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2335
Start date: 2008/4/24
End date: 2010/2/28
Status: Active
Contract/Grant Number: Project 20-07, Task 254
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 253. Subcommittee on Systems Operations and Management Strategic Plan Update
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2336
Start date: 2008/4/2
End date: 2009/1/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 253
Total Dollars: 40000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 252. Guidelines for Implementing Quality Control and Quality Assurance for Bridge Inspection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2338
Start date: 2008/4/7
End date: 2009/7/10
Status: Completed
Contract/Grant Number: Project 20-07, Task 252
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 248. Guidelines for Utility Encasement Policy for Highway Crossings
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2203
Start date: 2009/3/9
End date: 2009/12/8
Status: Active
Contract/Grant Number: Project 20-07, Task 248
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 247. Outdoor Advertising Sign Regulation Study
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2202
Start date: 2008/5/29
End date: 2009/6/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 247
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 246. Replacement Process for LED (Light Emitting Diode) Traffic Signals
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2199
Start date: 2008/6/16
End date: 2009/8/15
Status: Completed
Contract/Grant Number: Project 20-07, Task 246
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 245. Updating AASHTO Design and Construction Specifications for Temporary Works used in Bridge Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2201
Start date: 2008/4/14
End date: 2009/7/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 245
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 244. Modifications for AASHTO LRFD Bridge Design Specifications to Incorporate or Update the Guide Specifications for Design of Pedestrian Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2200
Start date: 2007/12/12
End date: 2009/1/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 244
Total Dollars: 70000
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Research for AASHTO Standing Committee on Highways. Task 243. Development of a Test Method for Optical Sizing and Roundness Determination of Glass Beads Utilized in Traffic Markings
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2198
Start date: 2007/10/15
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 20-07, Task 243
Total Dollars: 99962
Source Organization: Transportation Research Board
Date Added: 12/10/2007

Methodologies for Evaluating Pavement Strategies and Barriers for Noise Mitigation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1628
Start date: 2008/6/13
End date: 2010/6/14
Status: Active
Contract/Grant Number: Project 10-76
Total Dollars: 299665
Source Organization: Transportation Research Board
Date Added: 12/05/2007

Expansion of the Transportation Research Thesaurus
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1639
Start date: 2008/7/3
End date: 2009/7/3
Status: Active
Contract/Grant Number: Project 20-79
Total Dollars: 80000
Source Organization: Transportation Research Board
Date Added: 12/05/2007

Synthesis of Information Related to Highway Problems. Topic 33-04. Integrated Roadside Vegetation Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=48
Start date: 2002/1/2
End date: 2005/4/4
Status: Completed
Contract/Grant Number: Project 20-05, Topic 33-04
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 34-01. Centerline Rumble Strips
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=57
Start date: 2002/12/31
End date: 2005/3/17
Status: Completed
Contract/Grant Number: Project 20-05, Topic 34-01
Total Dollars: 12000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 34-05. Effective Construction Management of Disadvantaged Business Enterprise Issues
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=61
Start date: 2002/11/15
End date: 2005/4/21
Status: Completed
Contract/Grant Number: Project 20-05, Topic 34-05
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-01. State Quality Assurance Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=69
Start date: 2003/9/1
End date: 2005/6/6
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-01
Total Dollars: 12000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-03. Crash Records Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=71
Start date: 2003/12/1
End date: 2006/1/20
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-03
Total Dollars: 29000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-04. Value Engineering Practices in Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=72
Start date: 2003/10/1
End date: 2005/12/5
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-04
Total Dollars: 29000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-05. Developing Transportation Agency Leaders
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=73
Start date: 2003/12/1
End date: 2005/9/9
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-05
Total Dollars: 2900
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-06. Access Rights
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=74
Start date: 2003/11/19
End date: 2005/11/14
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-06
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-09. Compliance with National Historic Preservation Act Requirements for Archeological Investigation and Mitigation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=77
Start date: 2003/10/24
End date: 2005/7/26
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-09
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 35-10. Improving the Safety of Older Road Users
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=78
Start date: 2003/12/1
End date: 2005/9/6
Status: Completed
Contract/Grant Number: Project 20-05, Topic 35-10
Total Dollars: 29000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-01. Quality Assurance in Design-Build Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=106
Start date: 2006/9/15
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-01
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-02. Information Technology for Efficient Project Delivery
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=107
Start date: 2006/11/1
End date: 2008/3/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-02
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-04. State Highway Cost Allocation Studies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=109
Start date: 2006/11/15
End date: 2008/3/15
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-04
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-06. Pre-Overlay Treatment of Existing Pavements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=111
Start date: 2006/10/1
End date: 2007/1/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-06
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-07. Forecasting Metropolitan Commercial and Freight Travel
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=112
Start date: 2006/11/1
End date: 2007/2/7
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-07
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-10. High Speed Weigh-in-Motion System Calibration Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=114
Start date: 2006/11/1
End date: 2007/3/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 38-10
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-12. Alternative Contracting Methods to Facilitate Faster Construction and Reconstruction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=116
Start date: 2006/11/15
End date: 2008/3/15
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-12
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems. Topic 38-13. Illuminated, Active, In-Pavement Marker Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=117
Start date: 2006/10/2
End date: 2008/5/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-13
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Distribution Plan for the Recommended Mechanistic-Empirical Pavement Guide and Software
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=217
Start date: 2004/5/14
End date: 2006/5/13
Status: Completed
Contract/Grant Number: Project 01-37A(01)
Total Dollars: 118784
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Evaluation of CIP Reinforced Joints for Full-Depth Precast Concrete Bridge Decks
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=291
Start date: 2006/7/5
End date: 2009/11/4
Status: Active
Contract/Grant Number: Project 10-71
Total Dollars: 650000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Implementation Plan and Products
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=443
Start date: 2003/4/15
End date: 2005/6/30
Status: Completed
Contract/Grant Number: Project 17-18(11)
Total Dollars: 265365
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Lane Departure Video
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=444
Start date: 2005/5/6
End date: 2005/9/5
Status: Completed
Contract/Grant Number: Project 17-18(14)
Total Dollars: 31000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Technical Support for the AASHTO Task Force on Roadside Safety (TFRS)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=446
Start date: 2000/11/15
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 17-20
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Highway Problems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=507
Start date: 1967/12/15
Status: Active
Contract/Grant Number: Project 20-05
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=509
Start date: 1968/12/2
Status: Active
Contract/Grant Number: Project 20-07
Total Dollars: 1200000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Detailed Planning for Research on Accelerating the Renewal of America's Highways ("Renewal")
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=615
Start date: 2005/12/28
End date: 2006/4/15
Status: Completed
Contract/Grant Number: Project 20-58(1)
Total Dollars: 390000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Detailed Planning for Research on Making a Significant Improvement in Highway Safety ("Safety")
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=616
Start date: 2002/2/25
End date: 2005/9/30
Status: Completed
Contract/Grant Number: Project 20-58(2)
Total Dollars: 289932
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Detailed Planning for Research on Providing a Highway System with Reliable Travel Times ("Reliability")
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=617
Start date: 2005/12/14
End date: 2006/4/15
Status: Completed
Contract/Grant Number: Project 20-58(3)
Total Dollars: 288652
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Detailed Planning for Research on Providing Highway Capacity in Support of the Nation's Economic, Environmental, and Social Goals ("Capacity")
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=618
Start date: 2005/12/8
End date: 2006/4/15
Status: Completed
Contract/Grant Number: 20-58(4)
Total Dollars: 290000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Guidelines for Transportation Emergency Training Drills and Exercises
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=638
Start date: 2004/7/21
End date: 2005/10/15
Status: Completed
Contract/Grant Number: 20-59(18)
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Transportation Response Options: Scenarios of Infectious Disease, Biological Agents, Chemical, Biological, Radiological, or Nuclear Exposure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=639
Start date: 2003/10/23
End date: 2005/12/31
Status: Completed
Contract/Grant Number: Project 20-59(19)
Total Dollars: 251000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Accelerating Transportation Program and Project Delivery: Conception to Completion
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=659
Start date: 2007/4/2
End date: 2010/2/12
Status: Active
Contract/Grant Number: Project 20-73
Total Dollars: 299960
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Evaluation of Bridge-Scour Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=726
Start date: 2008/3/27
Status: Proposed
Contract/Grant Number: Project 24-27
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Update of Roundabouts: An Informational Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=819
Start date: 2007/2/13
End date: 2009/8/12
Status: Active
Contract/Grant Number: Project 03-65A
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Crossing Solutions at Roundabouts and Channelized Turn Lanes for Pedestrians with Vision Disabilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=833
Start date: 2005/2/1
End date: 2005/6/30
Status: Completed
Contract/Grant Number: Project 3-78
Total Dollars: 30328
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Validation of Performance-Related Tests of Aggregates for Use in Hot-Mix Asphalt Pavements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=847
Start date: 2000/3/16
End date: 2005/1/31
Status: Completed
Contract/Grant Number: Project 04-19(2)
Total Dollars: 399975
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Incorporating Safety into Long-Range Transportation Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=920
Start date: 2002/8/8
End date: 2005/1/8
Status: Completed
Contract/Grant Number: Project 08-44
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Review of Canadian Experience with Large Commercial Motor Vehicles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=939
Start date: 2007/3/28
End date: 2008/9/30
Status: Active
Contract/Grant Number: Project 8-63
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 141. Conformity Problems Caused by the Mismatch in SIP/Transportation Plan Timeframe
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1206
Start date: 2001/5/9
End date: 2002/5/8
Status: Active
Contract/Grant Number: Project 20-07, Task 141
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on Planning. Task 62. Best Practice Methodology for Calculating Return on Investment (ROI) for Transportation Programs and Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1276
Start date: 2006/8/3
End date: 2007/6/2
Status: Completed
Contract/Grant Number: Project 8-36, Task 62
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on Planning. Task 64. Right of Way Methods and Tools to Control Project Cost Escalation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1278
Start date: 2008/3/31
Status: Terminated
Contract/Grant Number: Project 8-36, Task 64
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 26. Integration of Charrette Processes into Project Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1298
Start date: 2008/3/31
Status: Terminated
Contract/Grant Number: Project 25-25, Task 26
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 27. Project Management and NEPA
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1299
Start date: 2007/7/16
End date: 2008/8/15
Status: Completed
Contract/Grant Number: Project 25-25, Task 27
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 28. Reevaluations of NEPA Documents
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1300
Start date: 2007/2/22
End date: 2008/4/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 28
Total Dollars: 55000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 30. Section 404 Permitting and Roadside Ditches as Jurisdictional Waters
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1302
Start date: 2008/3/31
Status: Terminated
Contract/Grant Number: Project 25-25, Task 30
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 32. Linking Environmental Resource and Transportation Planning--The Current State of Practice
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1304
Start date: 2006/12/4
End date: 2009/1/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 32
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 35. Water Quality Analyses for NEPA Documents: Selecting Appropriate Methodologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1307
Start date: 2006/11/9
End date: 2008/6/30
Status: Completed
Contract/Grant Number: Project 25-25, Task 35
Total Dollars: 79972
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 145. Update of the AASHTO Guide for Transportation Landscape and Environmental Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1487
Start date: 2001/11/2
End date: 2005/1/31
Status: Terminated
Contract/Grant Number: Project 20-07, Task 145
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 172. Recommended AASHTO Design-Build Procurement Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1518
Start date: 2004/8/20
End date: 2005/8/19
Status: Completed
Contract/Grant Number: Project 20-07, Task 172
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 184. Development of a Pavement Preservation Synthesis, Research Plans, and Initiatives
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1527
Start date: 2004/3/10
End date: 2005/3/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 184
Total Dollars: 47086
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 187. Updating the AASHTO Guide for the Development of Bicycle Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1529
Start date: 2004/7/26
End date: 2005/4/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 187
Total Dollars: 43383
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 240. Update of AASHTO Roadside Design Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1564
Start date: 2007/11/26
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 20-07, Task 240
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 241. Capacity Creation Through Innovative Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1565
Start date: 2008/9/19
Status: Terminated
Contract/Grant Number: Project 20-07, Task 241
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 239. Identification and Delineation of Incident Management and Multi-Agency Emergency Response Functions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1566
Start date: 2008/4/1
Status: Proposed
Contract/Grant Number: Project 20-07, Task 239
Total Dollars: 25000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for AASHTO Standing Committee on Highways. Task 242. Cost Analysis of Rehabilitation/Reconstruction of the Nation's Highway Infrastructure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1567
Start date: 2008/4/1
Status: Proposed
Contract/Grant Number: Project 20-07, Task 242
Total Dollars: 65000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 36. Recurring Community Impacts
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1654
Start date: 2007/6/13
End date: 2008/10/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 36
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 38. Guide to Use of Tier I Environmental Impact Statements for Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1656
Start date: 2007/10/5
End date: 2009/6/1
Status: Active
Contract/Grant Number: Project 25-25, Task 38
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 39. Improving Project Environmental Cost Estimates
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1657
Start date: 2007/9/25
End date: 2008/11/24
Status: Completed
Contract/Grant Number: Project 25-25, Task 39
Total Dollars: 85000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 40. New Noise Barrier Products & Noise Barrier Approval Research & Guidelines
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1658
Start date: 2007/5/10
End date: 2008/1/9
Status: Completed
Contract/Grant Number: Project 25-25, Task 40
Total Dollars: 74995
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 41. Implementation of Community & Cultural Resource Commitments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1659
Start date: 2007/10/25
End date: 2008/11/14
Status: Completed
Contract/Grant Number: Project 25-25, Task 41
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 42. Determine Alternative Calculations for Fine Particulate Emission Factors other than AP-42 Applicable to Calculate Re-Entrained Dust on Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1660
Start date: 2007/9/18
End date: 2008/11/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 42
Total Dollars: 75000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 43. Guidance on Legal Sufficiency Criteria for Adequate Cumulative and Secondary Impacts Analysis in EIS Documents
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1661
Start date: 2008/1/28
End date: 2008/8/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 43
Total Dollars: 40000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Research for the AASHTO Standing Committee on the Environment. Task 44. Development and Implementation of a Transportation and Climate Change Clearinghouse
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1662
Start date: 2007/9/25
End date: 2009/3/24
Status: Completed
Contract/Grant Number: Project 25-25, Task 44
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Guide for Pavement-Type Selection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1627
Start date: 2008/5/1
End date: 2010/4/30
Status: Active
Contract/Grant Number: Project 10-75
Total Dollars: 299991
Source Organization: Transportation Research Board
Date Added: 11/27/2007

Research Program Design---Administration of Highway and Transportation Agencies. Highway Safety Leadership Organizational Issues; A Survey of States and Recommendations for Sustaining Progress
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=550
Start date: 2005/10/25
End date: 2007/8/31
Status: Completed
Contract/Grant Number: Project 20-24(44)
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/21/2007

Data Mining and Interlaboratory Studies to Prepare Precision Statements for AASHTO Standard Test Methods
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1558
Start date: 2007/1/1
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 9-26A
Total Dollars: 1260301
Source Organization: Transportation Research Board
Date Added: 11/13/2007

Evaluation of Fatigue on the Serviceability of Highway Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1632
Start date: 2008/4/23
End date: 2011/4/22
Status: Active
Contract/Grant Number: Project 12-81
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 11/12/2007

Guidelines for Analytical Methods and Erection Engineering of Curved and Skewed Steel Deck-Girder Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1630
Start date: 2008/4/2
End date: 2010/10/1
Status: Active
Contract/Grant Number: Project 12-79
Total Dollars: 450000
Source Organization: Transportation Research Board
Date Added: 11/12/2007

Developing a Logical Model for a Geo-Spatial Right-of-Way Land Management System
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2326
Start date: 2007/10/3
End date: 2010/4/2
Status: Active
Contract/Grant Number: Project 8-55A
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/12/2007

Automated Enforcement for Speeding and Red Light Running
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1613
Start date: 2008/8/1
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 3-93
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 11/08/2007

Design Guidance for Channelized Right-Turn Lanes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1609
Start date: 2008/4/23
End date: 2010/7/30
Status: Active
Contract/Grant Number: Project 3-89
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 11/08/2007

Citizen's Guide and Discipline-Specific Professionals' Guide for Context-Sensitive Solutions in Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1618
Start date: 2008/4/21
End date: 2010/4/21
Status: Active
Contract/Grant Number: Project 8-68
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 11/06/2007

Guidelines for Ramp and Interchange Spacing
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1608
Start date: 2008/6/23
End date: 2010/12/22
Status: Active
Contract/Grant Number: Project 3-88
Total Dollars: 500000
Source Organization: Transportation Research Board
Date Added: 11/05/2007

Development of Design Methods for In-Stream Flow Control Structures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1641
Start date: 2008/9/2
End date: 2011/9/1
Status: Active
Contract/Grant Number: Project 24-33
Total Dollars: 600000
Source Organization: Transportation Research Board
Date Added: 10/31/2007

Culvert Rehabilitation to Maximize Service Life While Minimizing Direct Costs and Traffic Disruption
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1634
Start date: 2008/6/9
End date: 2010/6/8
Status: Active
Contract/Grant Number: 14-19
Total Dollars: 750000
Source Organization: Transportation Research Board
Date Added: 10/31/2007

Improved Test Methods for Specific Gravity and Absorption of Coarse and Fine Aggregate
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1614
Start date: 2008/4/3
End date: 2010/4/2
Status: Active
Contract/Grant Number: Project 4-35
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 10/31/2007

Synthesis of Information Related to Highway Problems. Topic 39-12. Identify Promising Technologies for Biological Surveys
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1675
Start date: 2007/11/1
End date: 2009/6/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 39-12
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/29/2007

Synthesis of Information Related to Highway Problems. Topic 39-02. Improving the Safety of Mobile Lane Closures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1665
Start date: 2007/11/1
End date: 2009/6/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 39-02
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/29/2007

Synthesis of Information Related to Highway Problems. Topic 39-13. Pavement Marking Warranty Specifications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1676
Start date: 2007/11/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 39-13
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/24/2007

Trip-Generation Rates for Transportation Impact Analyses of Infill Developments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1616
Start date: 2008/4/4
Status: Active
Contract/Grant Number: Project 8-66
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 10/24/2007

Integrating Individual Transportation System-Level Performance Programs to Determine Network Performance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1617
Start date: 2008/4/8
End date: 2009/10/8
Status: Active
Contract/Grant Number: Project 8-67
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 10/24/2007

Handbook for Pavement Design, Construction, and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1607
Start date: 2009/6/1
Status: Active
Contract/Grant Number: Project 1-46
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 10/19/2007

Evaluation of Bridge Scour Research: Pier Scour Processes and Predictions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1597
Start date: 2007/10/17
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 24-27(01)
Total Dollars: 175000
Source Organization: Transportation Research Board
Date Added: 10/18/2007

Operation of Traffic Signal Systems in Oversaturated Conditions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1610
Start date: 2008/3/14
End date: 2010/6/14
Status: Active
Contract/Grant Number: Project 3-90
Total Dollars: 600000
Source Organization: Transportation Research Board
Date Added: 10/18/2007

LRFD Minimum Flexural Reinforcement Requirements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1631
Start date: 2008/2/14
End date: 2009/8/13
Status: Active
Contract/Grant Number: Project 12-80
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. National Leadership Retreat for State and Local Officials to Advance a Vision of the Transportation System Required to Meet Future Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1572
Start date: 2007/3/5
End date: 2008/3/6
Status: Completed
Contract/Grant Number: Project 20-24(56)
Total Dollars: 150000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. National Summit on Future Transportation Funding and Finance Strategies: States and Metropolitan Regions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1569
Start date: 2007/1/26
End date: 2008/1/25
Status: Completed
Contract/Grant Number: Project 20-24(55)
Total Dollars: 185000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. Project Summaries for State DOT CEOs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=547
Start date: 2006/10/13
End date: 2007/3/31
Status: Active
Contract/Grant Number: Project 20-24(41)
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. CEO Engagement Options
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=544
Start date: 2004/4/16
End date: 2005/1/31
Status: Completed
Contract/Grant Number: Project 20-24(38)
Total Dollars: 50000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. Measuring Performance Among State DOTs Sharing Good Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=543
Start date: 2004/3/19
End date: 2006/1/31
Status: Completed
Contract/Grant Number: Project 20-24(37)
Total Dollars: 115000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Research Program Design---Administration of Highway and Transportation Agencies. Transportation Mobility, Access and Safety for an Aging Population
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=535
Start date: 2003/5/20
End date: 2005/9/30
Status: Completed
Contract/Grant Number: Project 20-24(24)
Total Dollars: 114274
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Guidebook for Successful Communication, Cooperation, and Coordination Strategies Between Transportation Agencies and Tribal Communities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1615
Start date: 2008/4/17
End date: 2009/10/16
Status: Active
Contract/Grant Number: Project 8-65
Total Dollars: 200000
Source Organization: Transportation Research Board
Date Added: 10/17/2007

Synthesis of Information Related to Highway Problems. Topic 39-05. Emergency Evacuation and Reentry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1668
Start date: 2007/11/1
End date: 2009/6/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 39-05
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/16/2007

Evaluation of Load Rating by Load and Resistance Factor Rating
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1629
Start date: 2008/3/3
End date: 2010/3/2
Status: Active
Contract/Grant Number: Project 12-78
Total Dollars: 450000
Source Organization: Transportation Research Board
Date Added: 10/12/2007

Development of Fatigue Loading and Design Methodology for High-Mast Lighting Poles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1626
Start date: 2008/5/2
End date: 2011/5/1
Status: Active
Contract/Grant Number: Project 10-74
Total Dollars: 674957
Source Organization: Transportation Research Board
Date Added: 10/12/2007

Development of Guidance for the Selection, Use, and Maintenance of Cable Barrier Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1640
Start date: 2008/4/28
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 22-25
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 10/09/2007

Supplement to the AASHTO Transportation Asset Management Guide: Volume 2 - A Focus on Implementation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2190
Start date: 2008/3/13
End date: 2010/5/12
Status: Active
Contract/Grant Number: Project 8-69
Total Dollars: 750000
Source Organization: Transportation Research Board
Date Added: 10/09/2007

Synthesis of Information Related to Highway Problems. Topic 39-04. Performance Based Construction Contractor Pre-qualification
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1667
Start date: 2007/10/15
Status: Active
Contract/Grant Number: Project 20-05, Topic 39-04
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/08/2007

Synthesis of Information Related to Highway Problems. Topic 39-01. Quality Management of Pavement Distress Data Collection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1664
Start date: 2008/10/1
Status: Active
Contract/Grant Number: Project 20-05, Topic 39-01
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/08/2007

Synthesis of Information Related to Highway Problems. Topic 38-09. Estimating Stiffness of Subgrades and Unbound Materials for Pavement Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=113
Start date: 2006/11/1
End date: 2006/2/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 38-09
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/05/2007

Synthesis of Information Related to Highway Problems. Topic 39-06. Public Sector Decision-Making in Public Private Partnerships
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1669
Start date: 2007/10/15
End date: 2009/3/2
Status: Completed
Contract/Grant Number: Project 20-05, Topic 39-06
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/04/2007

Synthesis of Information Related to Highway Problems. Topic 39-03. Cathodic Protection for Life Extension of Existing Reinforced Concrete Bridge Elements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1666
Start date: 2007/10/15
Status: Completed
Contract/Grant Number: Project 20-05, Topic 39-03
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 10/04/2007

Production of the Year 2010 Highway Capacity Manual
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1612
Start date: 2007/9/24
End date: 2011/9/23
Status: Active
Contract/Grant Number: Project 3-92
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 10/03/2007

Research for AASHTO Standing Committee on Highways. Task 237. Incorporation of Lane Management and Toll Plaza Design Issues in the AASHTO Green Book
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1562
Start date: 2008/4/21
Status: Active
Contract/Grant Number: Project 20-07, Task 237
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 09/13/2007

Research for AASHTO Standing Committee on Highways. Task 231. Laboratory Testing of Proposed Roundabout Traffic Control Options
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1246
Start date: 2007/2/27
End date: 2008/2/28
Status: Completed
Contract/Grant Number: Project 20-07, Task 231
Total Dollars: 90000
Source Organization: Transportation Research Board
Date Added: 09/13/2007

Research for the AASHTO Standing Committee on the Environment. Task 25. Modification and Amendment of Environmental Permits on Design-Build Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1297
Start date: 2006/8/3
End date: 2007/7/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 25
Total Dollars: 60000
Source Organization: Transportation Research Board
Date Added: 09/07/2007

Long-Term Roadside Crash Data Collection Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1637
Start date: 2009/11/1
Status: Proposed
Contract/Grant Number: Project 17-43
Total Dollars: 1000000
Source Organization: Transportation Research Board
Date Added: 08/29/2007

Coordination of Safety Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=441
Start date: 2003/4/1
End date: 2008/6/30
Status: Completed
Contract/Grant Number: Project 17-18(09)A
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 11/03/2006

Transportation Operations Training Framework
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=663
Start date: 2007/7/11
End date: 2009/9/10
Status: Active
Contract/Grant Number: Project 20-77
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/31/2006

Research Program Design---Administration of Highway and Transportation Agencies. Commuting in America
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=540
Start date: 2003/11/17
End date: 2005/9/30
Status: Active
Contract/Grant Number: Project 20-24(34)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/24/2006

Simplified Live Load Distribution-Factor Equations-Phase II
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=351
Start date: 2005/6/17
End date: 2007/1/31
Status: Completed
Contract/Grant Number: Project 12-62A
Total Dollars: 50817
Source Organization: National Cooperative Highway Research Program
Date Added: 10/24/2006

Load and Resistance Factors for Earth Pressures on Bridge Substructures and Retaining Walls
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=342
Start date: 2006/7/10
End date: 2007/7/9
Status: Completed
Contract/Grant Number: Project 12-55A
Total Dollars: 97700
Source Organization: National Cooperative Highway Research Program
Date Added: 10/24/2006

Security Framework: Fundamentals of Transportation Security for DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=636
Start date: 2007/4/4
End date: 2007/12/31
Status: Completed
Contract/Grant Number: Project 20-59(16)B
Total Dollars: 74973
Source Organization: National Cooperative Highway Research Program
Date Added: 10/17/2006

Research Program Design---Administration of Highway and Transportation Agencies. Innovative Contracting for Major Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=549
Start date: 2005/6/1
End date: 2005/11/1
Status: Completed
Contract/Grant Number: Project 20-24(43)
Total Dollars: 30000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/17/2006

Research Program Design---Administration of Highway and Transportation Agencies. Communicating Urban Congestion Information
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=541
Start date: 2004/8/20
End date: 2006/11/19
Status: Completed
Contract/Grant Number: Project 20-24(35)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/16/2006

Research for AASHTO Standing Committee on Highways. Task 201. Use of Warranties in Highway Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1217
Start date: 2005/10
End date: 2007/5/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 201
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/15/2006

Research for AASHTO Standing Committee on Highways. Task 227. Technology Transfer Guidebooks for Implementation of Innovative Technologies
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-07
Start date: 2006/11/1
End date: 2007/10/31
Status: Active
Contract/Grant Number: Project 20-07, Task 227
Total Dollars: 45000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/15/2006

Research for AASHTO Standing Committee on Highways. Task 230. Safety and Security in Roadway Tunnels
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1245
Start date: 2007/9/24
End date: 2008/9/23
Status: Active
Contract/Grant Number: Project 20-07, Task 230
Total Dollars: 45000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/15/2006

Research for AASHTO Standing Committee on Highways. Task 233. Development of a Toolkit to Assist State DOTs and Contractors in Uniformly Handling DBE Requirements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1248
Start date: 2007/3/23
End date: 2008/4/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 233
Total Dollars: 60000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/15/2006

Research for AASHTO Standing Committee on Highways. Task 232. Development of a Guide to Update ADA Transition Plans
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1247
Start date: 2007/10/15
End date: 2009/4/14
Status: Completed
Contract/Grant Number: Project 20-07, Task 232
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/13/2006

Research Program Design---Administration of Highway and Transportation Agencies. 2006 Bottom Line Report State and National Investment Analysis: Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=559
Start date: 2006/4/4
End date: 2006/8/31
Status: Completed
Contract/Grant Number: Project 20-24(54)
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/12/2006

Accelerating the Application of NCHRP Research Results
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=588
Start date: 1995/10/1
Status: Active
Contract/Grant Number: Project 20-44
Total Dollars: 1250000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/11/2006

Research Program Design---Administration of Highway and Transportation Agencies. State DOT Leadership Forum--2006
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=557
Start date: 2006/12/27
End date: 2007/3/26
Status: Completed
Contract/Grant Number: Project 20-24(51)
Total Dollars: 145000
Source Organization: National Cooperative Highway Research Program
Date Added: 10/11/2006

Seismic Design of Geosynthetic-Reinforced Soil (GRS) Bridge Abutments with Flexible Facing
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=346
Start date: 2006/9/18
End date: 2011/1/30
Status: Active
Contract/Grant Number: Project 12-59(01)
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/18/2006

Abutment Scour in Cohesive Soils
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=712
Start date: 2004/6/25
End date: 2008/6/30
Status: Active
Contract/Grant Number: Project 24-15(2)
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/10/2006

Identification of Liability-Related Impediments to Sharing 409 Safety Data Among Transportation Agencies, and Synthesis of Best Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=930
Start date: 2004/12/28
End date: 2006/6/30
Status: Completed
Contract/Grant Number: Project 8-54
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2006

Structural Concrete Design with High-Strength Steel Reinforcement
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=366
Start date: 2007/5/1
End date: 2010/4/30
Status: Active
Contract/Grant Number: Project 12-77
Total Dollars: 600000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2006

Predicting and Mitigating Hydroacoustic Impacts on Fish from Pile Installation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=763
Start date: 2005/11/23
End date: 2009/9/1
Status: Active
Contract/Grant Number: Project 25-28
Total Dollars: 450000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2006

Research Program Design---Administration of Highway and Transportation Agencies. Effective Program Delivery in a Constrained Fiscal Environment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=538
Start date: 2004/6/4
End date: 2006/11/30
Status: Completed
Contract/Grant Number: Project 20-24(31)
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2006

Research for the AASHTO Standing Committee on Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=910
Start date: 2004/6
Status: Active
Contract/Grant Number: Project 8-36B
Total Dollars: 0
Source Organization: National Cooperative Highway Research Program
Date Added: 09/01/2006

Scour at Bridge Foundations on Rock
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=728
Start date: 2006/8/22
End date: 2009/8/21
Status: Active
Contract/Grant Number: Project 24-29
Total Dollars: 750000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/31/2006

Research for AASHTO Standing Committee on Highways. Task 228. Update the United States Numbered Highways (1989 Edition) and Document Current U.S. Routes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1243
Start date: 2009/3/24
End date: 2010/4/15
Status: Active
Contract/Grant Number: Project 20-07, Task 228
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for AASHTO Standing Committee on Highways. Task 227. Technology Transfer Guidebooks for Implementation of Innovative Technologies
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-07
Start date: 2006/8/30
Status: Proposed
Contract/Grant Number: Project 20-07, Task 227
Total Dollars: 45000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for AASHTO Standing Committee on Highways. Task 225. Best Practices in the Management of Design Errors and Omissions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1240
Start date: 2008/1/11
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 225
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 13. State Public Transportation Division Involvment in State Emergency Planning, Response, and Recovery
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2463
Start date: 2007/3/27
End date: 2008/1/15
Status: Completed
Contract/Grant Number: Project 20-65 Task 13
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 14. Current Practice and Future Guidance on the Development of SAFETEA-LU- Required Coordinated Public Transit-Human Services Transportation Plan
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2006/8/30
Status: Proposed
Contract/Grant Number: Project 20-65 Task 14
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 15. Updated Research Agenda for State DOT Public Transportation Divisions and NCHRP Project 20-65
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2006/8/30
Status: Proposed
Contract/Grant Number: Project 20-65 Task 15
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 16. Current State Eligibility Requirements for Grantees to Qualify for Federal Section 5310 and 5311 Funds
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2006/8/30
Status: Proposed
Contract/Grant Number: Project 20-65 Task 16
Total Dollars: 25000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/30/2006

Evaluation of Existing Roadside Safety Hardware Using Updated Criteria
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=686
Start date: 2007/4/16
End date: 2010/5/31
Status: Active
Contract/Grant Number: Project 22-14(03)
Total Dollars: 530000
Source Organization: National Cooperative Highway Research Program
Date Added: 07/13/2006

Design Guidelines for Increasing the Lateral Resistance of Highway Bridge Pile Foundations by Improving Weak Soils
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=729
Start date: 2006/6/2
End date: 2009/12/1
Status: Active
Contract/Grant Number: Project 24-30
Total Dollars: 499758
Source Organization: National Cooperative Highway Research Program
Date Added: 06/16/2006

Temporary Bridging to Avoid or Minimize Impacts to Waters and Wetlands During Highway Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=765
Start date: 2006/6/5
End date: 2008/5/30
Status: Completed
Contract/Grant Number: Project 25-30
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 06/08/2006

Making Transportation Tunnels Safe and Secure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=652
Start date: 2004/9/13
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project 20-67
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/31/2006

Calibration of Rutting Models for HMA Structural and Mix Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=965
Start date: 2005/8/29
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 9-30A
Total Dollars: 1000000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/31/2006

Independent Review of the Recommended Mechanistic-Empirical Design Guide and Software
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=222
Start date: 2004/11/6
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project 1-40A
Total Dollars: 595000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/31/2006

User Manual and Local Calibration Guide for the Mechanistic-Empirical Pavement Design Guide and Software
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=223
Start date: 2005/1/28
End date: 2009/2/28
Status: Completed
Contract/Grant Number: Project 1-40B
Total Dollars: 324996
Source Organization: National Cooperative Highway Research Program
Date Added: 05/31/2006

A Mix Design Manual for Hot Mix Asphalt
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=967
Start date: 2005/7/1
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 9-33
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/31/2006

Developing Design and Management Guidelines for Historic Road Corridors
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=764
Start date: 2006/4/7
End date: 2007/11/16
Status: Completed
Contract/Grant Number: Project 25-29
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/22/2006

Models for Predicting Top-Down Cracking of Hot-Mix Asphalt Layers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=228
Start date: 2006/5/1
End date: 2009/6/30
Status: Active
Contract/Grant Number: Project 1-42A
Total Dollars: 360000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/12/2006

Research Program Design---Administration of Highway and Transportation Agencies. Assessing the Importance of Transportation for Major Industries and Sectors of the U.S. Economy
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=534
Start date: 2002/5/14
End date: 2007/11/8
Status: Completed
Contract/Grant Number: Project 20-24(23)
Total Dollars: 230305
Source Organization: National Cooperative Highway Research Program
Date Added: 05/12/2006

Guidance for Implementation of the AASHTO Strategic Highway Safety Plan
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=435
Start date: 2000/3/22
End date: 2009/6/30
Status: Completed
Contract/Grant Number: Project 17-18(03)
Total Dollars: 4247915
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Guidelines for Verification and Validation of Crash Simulations Used in Roadside Safety Applications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=697
Start date: 2007/4/5
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 22-24
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

LRFD Design Specifications for Shallow Foundations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=730
Start date: 2007/1/30
End date: 2009/4/30
Status: Active
Contract/Grant Number: Project 24-31
Total Dollars: 350000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Implementing Transportation Knowledge Networks
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=661
Start date: 2007/3/27
End date: 2009/9/30
Status: Completed
Contract/Grant Number: Project 20-75
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Operations Academy
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-77
Start date: 2006/5/4
Status: Proposed
Contract/Grant Number: Project 20-77
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Communicating the Value of Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=664
Start date: 2007/2/22
End date: 2010/2/28
Status: Active
Contract/Grant Number: Project 20-78
Total Dollars: 307123
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Scour at Wide Piers and Long Skewed Piers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=731
Start date: 2007/7/2
End date: 2009/10/1
Status: Active
Contract/Grant Number: Project 24-32
Total Dollars: 298982
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

AcceleratingTransportation Program and Project Delivery: Conception to Completion
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-73
Start date: 2007/2
Status: Proposed
Contract/Grant Number: Project 20-73
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Guidelines for Conducting a Disparity and Availability Study for the Federal Disadvantaged Business Enterprise Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=662
Start date: 2007/4/5
End date: 2009/7/1
Status: Completed
Contract/Grant Number: Project 20-76
Total Dollars: 280000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Tools to Aid State DOTs in Responding to Workforce Challenges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=658
Start date: 2007/3/1
End date: 2009/2/28
Status: Completed
Contract/Grant Number: Project 20-72
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Effective Experimental Design and Data Analysis in Transportation Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=657
Start date: 2007/4/23
End date: 2009/12/22
Status: Active
Contract/Grant Number: Project 20-71
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

High-Performance/High-Strength Lightweight Concrete for Bridge Girders and Decks
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=481
Start date: 2007/8/21
End date: 2010/8/20
Status: Active
Contract/Grant Number: Project 18-15
Total Dollars: 747880
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Evaluation and Repair Procedures for Precast/Prestressed Concrete Girders with Longitudinal Cracking in the Web
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=480
Start date: 2007/5/1
End date: 2009/4/30
Status: Active
Contract/Grant Number: Project 18-14
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Specifications and Protocols for Acceptance Tests of Fly Ash Used in Highway Concrete
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=479
Start date: 2007/7/16
End date: 2010/7/15
Status: Active
Contract/Grant Number: Project 18-13
Total Dollars: 749125
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

HSM Implementation and Training Materials
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+17-38
Start date: 2006/5/4
Status: Proposed
Contract/Grant Number: Project 17-38
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Revising the AASHTO Guide for the Development of Bicycle Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=417
Start date: 2007/3/12
End date: 2009/11/1
Status: Active
Contract/Grant Number: Project 15-37
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Test Methods and Specification Criteria for Mineral Filler Used in HMA
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=979
Start date: 2007/6/5
End date: 2010/6/4
Status: Active
Contract/Grant Number: Project 9-45
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Decision Making for Outsourcing and Privatization of Vehicle and Equipment Fleet Maintenance - Phase I
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=368
Start date: 2007/7/9
End date: 2009/3/12
Status: Completed
Contract/Grant Number: Project 13-03
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Developing a Plan for Validating an Endurance Limit for HMA Pavements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=978
Start date: 2007/4/17
End date: 2009/2/28
Status: Completed
Contract/Grant Number: Project 9-44
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Guide Specifications for the Design of Externally Bonded FRP Systems for Repair and Strengthening of Concrete Structures
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+10-73
Start date: 2007/4
Status: Proposed
Contract/Grant Number: Project 10-73
Total Dollars: 450000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Mix Design Practices for Warm Mix Asphalt
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=977
Start date: 2007/3/22
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project 9-43
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

A Guidebook on Improved Principles, Processes, and Methods for Shared-Use Passenger and Freight Rail Corridors
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=940
Start date: 2007/4/6
End date: 2009/8/5
Status: Active
Contract/Grant Number: Project 8-64
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Travel Demand Forecasting: Parameters and Techniques
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=937
Start date: 2007/3/19
End date: 2010/10/31
Status: Active
Contract/Grant Number: Project 8-61
Total Dollars: 550000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Transportation Performance Management Programs--Insight from Practitioners
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=938
Start date: 2007/4/5
End date: 2009/7/6
Status: Completed
Contract/Grant Number: Project 8-62
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Guidebook on Risk Analysis Tools and Management Practices to Control Transportation Project Costs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=936
Start date: 2007/6/1
End date: 2009/4/1
Status: Active
Contract/Grant Number: Project 8-60
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/04/2006

Technical Assistance to NCHRP and NCHRP Project 1-40A: Version 0.9 AND 1.0 of the M-E Pavement Design Software
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=224
Start date: 2005/7/18
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 1-40D(01)
Total Dollars: 642819
Source Organization: National Cooperative Highway Research Program
Date Added: 05/03/2006

Selection Criteria and Guidelines for Highway Safety Features
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=681
Start date: 2003/9/12
End date: 2008/12/31
Status: Completed
Contract/Grant Number: Project 22-12(02)
Total Dollars: 64592
Source Organization: National Cooperative Highway Research Program
Date Added: 05/03/2006

LRFD Metal Loss and Service-Life Strength Reduction Factors for Metal-Reinforced Systems in Geotechnical Applications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=727
Start date: 2006/6/1
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 24-28
Total Dollars: 600000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/01/2006

Research Program Design---Administration of Highway and Transportation Agencies. Improving the Time Performance of Highway Construction Contracts
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=527
Start date: 2004/9/3
End date: 2006/9/2
Status: Completed
Contract/Grant Number: Project 20-24(12)A
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/20/2006

Time-Related Incentive and Disincentive Provisions in Highway Construction Contracts
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=276
Start date: 2006/6/1
End date: 2009/5/30
Status: Active
Contract/Grant Number: Project 10-58(01)
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/18/2006

Transit, Call Centers, and 511: A Guide for Decision Makers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1020
Start date: 2006/12/15
End date: 2009/4/30
Status: Completed
Contract/Grant Number: Project A-31
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/12/2006

A Guide for Implementing Bus-On-Shoulder (BOS) Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1092
Start date: 2006/10/18
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project D-13
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/12/2006

Integrated Safety Management Process - Technical Support
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=438
Start date: 2003/9/12
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 17-18(05)B
Total Dollars: 498603
Source Organization: National Cooperative Highway Research Program
Date Added: 04/12/2006

Technical Assistance to NCHRP and NCHRP Project 1-40A: Versions 0.9 and 1.0 of the M-E Pavement Design Software
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=225
Start date: 2005/10/25
End date: 2009/12/1
Status: Active
Contract/Grant Number: Project 1-40D(02)
Total Dollars: 848595
Source Organization: National Cooperative Highway Research Program
Date Added: 04/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. In-Service Training Needs for State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=556
Start date: 2005/4/1
End date: 2006/3/31
Status: Completed
Contract/Grant Number: Project 20-24(50)
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/07/2006

Research Program Design---Administration of Highway and Transportation Agencies. Alternative Organizational Designs for State Transportation Departments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=545
Start date: 2005/9/22
End date: 2008/7/31
Status: Completed
Contract/Grant Number: Project 20-24(39)
Total Dollars: 220000
Source Organization: National Cooperative Highway Research Program
Date Added: 04/07/2006

Research Program Design---Administration of Highway and Transportation Agencies. Future Options for the National System of Interstate and Defense Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=558
Start date: 2006/5/11
End date: 2007/12/5
Status: Completed
Contract/Grant Number: Project 20-24(52)
Total Dollars: 726793
Source Organization: National Cooperative Highway Research Program
Date Added: 04/05/2006

Research for AASHTO Standing Committee on Highways. Task 182. Evaluation of Highway Innovative Technology Evaluation Center (HITEC)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1526
Start date: 2004/6/30
End date: 2005/11/30
Status: Active
Contract/Grant Number: Project 20-07, Task 182
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 183. LRFD Foundation Design Implementation and Specification Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1209
Start date: 2004/10/29
End date: 2005/12/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 183
Total Dollars: 65000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 186. Updating the Calibration Report for AASHTO LRFD Code
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1210
Start date: 2005/8/9
End date: 2007/1/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 186
Total Dollars: 60000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 188. Mainstreaming Operations in State DOT's
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1530
Start date: 2005/1/7
End date: 2005/11/6
Status: Completed
Contract/Grant Number: Project 20-07, Task 188
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 189. Advancing Strategic Highway Safety Plans: Safety Leadership Forum II
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1531
Start date: 2004/12/2
End date: 2005/12/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 189
Total Dollars: 23400
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 190. Develop Strategy for the Testing and Evaluation of Durable Striping Materials for High Traffic Areas and Mountain Passes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1532
Start date: 2005/3/21
End date: 2006/4/15
Status: Completed
Contract/Grant Number: Project 20-07, Task 190
Total Dollars: 48000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 191. Product Evaluation and Plant Certification of HDPE Pipe
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1211
Start date: 2005/6/1
End date: 2005/12/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 191
Total Dollars: 35000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 192. Update of Barrier Hardware Guide
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1533
Start date: 2004/9/1
End date: 2005/10/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 192
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 193. LRFD Guidelines for the Seismic Design of Highway Bridges, Version 2
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1534
Start date: 2004/12/22
End date: 2006/7/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 193
Total Dollars: 150000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 194. Consistency of Titles for AASHTO Publications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1535
Start date: 2005/5/6
End date: 2006/4/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 194
Total Dollars: 25000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 195. Development and Performance of Web Based Joint Salary Survey
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1212
Start date: 2007/2/22
End date: 2008/4/21
Status: Completed
Contract/Grant Number: Project 20-07, Task 195
Total Dollars: 20000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 196. Development of a Guide to Crashworthy Bridge Rail Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1213
Start date: 2006/5/30
End date: 2008/12/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 196
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 197. Development of a Test Method for Optical Sizing and Roundness Determination of Glass Beads Utilized in Traffic Marking
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1214
Start date: 2007/3/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 197
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2006

Research for AASHTO Standing Committee on Highways. Task 198. Standard Practice for Independent Assurance Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1536
Start date: 2005/7/8
End date: 2006/7/15
Status: Completed
Contract/Grant Number: Project 20-07, Task 198
Total Dollars: 58900
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 199. Update of the Strategic Plan for Bridge Engineering
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1215
Start date: 2005/2/3
End date: 2005/7/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 199
Total Dollars: 24000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 200. Synthesis of Vehicle Based Winter Maintenance Technologies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1216
Start date: 2005/11/7
End date: 2006/9/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 200
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 202. Guide to Benchmarking Operations Performance Measures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1218
Start date: 2006/11/15
End date: 2008/5/14
Status: Completed
Contract/Grant Number: Project 20-07, Task 202
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 203. Update of AASHTO Maintenance Manual to Include Systems Operations and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1219
Start date: 2005/5/19
End date: 2006/3/19
Status: Completed
Contract/Grant Number: Project 20-07, Task 203
Total Dollars: 39160
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 204. Pavement Noise Intensity Testing in Europe for Comparison to the United States
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1220
Start date: 2006/3/29
Status: Proposed
Contract/Grant Number: Project 20-07, Task 204
Total Dollars: 25000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 205. Project Delivery Workforce Management Review
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1221
Start date: 2005/7/22
End date: 2007/6/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 205
Total Dollars: 72796
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 206. A Model Guide for Condition Assessment Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1222
Start date: 2006/5/22
End date: 2007/7/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 206
Total Dollars: 70000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 207. Update of the AASHTO Guide Specifications for Highway Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1223
Start date: 2005/12/8
End date: 2006/10/8
Status: Completed
Contract/Grant Number: Project 20-07, Task 207
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 209. Incorporation of Research Findings into AASHTO's Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1225
Start date: 2005/11/8
End date: 2006/12/15
Status: Completed
Contract/Grant Number: Project 20-07, Task 209
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 210. Guidelines for the Selection of Cable Barrier Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1226
Start date: 2005/8/25
End date: 2007/7/5
Status: Programmed
Contract/Grant Number: Project 20-07, Task 210
Total Dollars: 49984
Source Organization: National Cooperative Highway Research Program
Date Added: 03/29/2006

Research for AASHTO Standing Committee on Highways. Task 211. Scoping Study for an AASHTO Guide on Accelerating Project Delivery
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1537
Start date: 2005/11/21
End date: 2006/5/20
Status: Completed
Contract/Grant Number: Project 20-07, Task 211
Total Dollars: 40000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 212. Development of a Model Drivers License Handbook
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1227
Start date: 2006/12/1
End date: 2007/12/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 212
Total Dollars: 70000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 213. Requirements for Minimum Maintained Retroreflectivitiy of Pavement Marking
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1228
Start date: 2005/9/30
End date: 2008/3/31
Status: Completed
Contract/Grant Number: Project 20-07, Task 213
Total Dollars: 42729
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 214. Update of A Guide to Small Sign Support Hardware
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1229
Start date: 2006/5/5
End date: 2008/8/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 214
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 215. Statewide Incident Reporting Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1230
Start date: 2006/3/21
End date: 2006/11/20
Status: Completed
Contract/Grant Number: Project 20-07, Task 215
Total Dollars: 60000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 216. Application of ORFD Bridge Design Specifications to High-Strength Structural Concrete: Final Project-Phase I
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-07
Start date: 2006/2/24
End date: 2007/2/23
Status: Active
Contract/Grant Number: Project 20-07, Task 216
Total Dollars: 33560
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 217. Verification and Implementation of Strut-and-Tie Model in LRFD Bridge Design Specifications
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1232
Start date: 2006/4/28
End date: 2007/10/27
Status: Completed
Contract/Grant Number: Project 20-07, Task 217
Total Dollars: 74986
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 218. Performance-Based Maintenance Contracting
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1233
Start date: 2006/3/27
Status: Terminated
Contract/Grant Number: Project 20-07, Task 218
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 219. Testing American Traffic Marking Systems on the Spanish (AETEC) Traffic Marking Wear Simulator
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1234
Start date: 2006/6/21
End date: 2007/6/20
Status: Completed
Contract/Grant Number: Project 20-07, Task 219
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 220. Update of the AASHTO Guide Specifications for Highway Construction
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1235
Start date: 2006/3/1
End date: 2007/3/1
Status: Completed
Contract/Grant Number: Project 20-07, Task 220
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/27/2006

Research for AASHTO Standing Committee on Highways. Task 221. Traffic Incident Management Program for Worker Safety
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1236
Start date: 2007/2/7
End date: 2010/1/30
Status: Active
Contract/Grant Number: Project 20-07, Task 221
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/24/2006

Research for AASHTO Standing Committee on Highways. Task 222. Evaluation of the Field Implementation of the Flashing Yellow Arrow Permissive Left-Turn Indication
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1237
Start date: 2006/7/7
End date: 2008/1/8
Status: Completed
Contract/Grant Number: Project 20-07, Task 222
Total Dollars: 65000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/24/2006

Research for AASHTO Standing Committee on Highways. Task 223. Update Business Needs for Pavement Engineering
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1238
Start date: 2007/4/12
End date: 2008/6/30
Status: Completed
Contract/Grant Number: Project 20-07, Task 223
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/24/2006

Research for AASHTO Standing Committee on Highways. Task 224. Update of the AASHTO Guide for Contracting, Selecting, and Managing Consultants in Preconstruction Engineering
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1239
Start date: 2006/3/15
End date: 2006/11/17
Status: Completed
Contract/Grant Number: Project 20-07, Task 224
Total Dollars: 40000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/24/2006

Research for the AASHTO Standing Committee on Planning. Task 46. Synthesis of Where Data Groups are Organizationally Located in State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1260
Start date: 2004/2/16
End date: 2005/12/15
Status: Completed
Contract/Grant Number: Project 8-36, Task 46
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 47. Effective Organization of Performance Measurement
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+8-36
Start date: 2004/10/15
End date: 2006/3/15
Status: Active
Contract/Grant Number: Project 8-36, Task 47
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 48. Guidance for Better Linking Systems Planning and the NEPA Process
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1262
Start date: 2004/10/27
End date: 2006/1/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 48
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 49. Synthesis of Metropilitan-Level Transportation Funding Sources
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1263
Start date: 2004/12/16
End date: 2005/12/15
Status: Completed
Contract/Grant Number: Project 8-36, Task 49
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 50. What is the Impact of an Aging Population on System Planning and Investment Policies?
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1264
Start date: 2004/12/16
End date: 2006/10/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 50
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 51. Information Design for Effective Decision Making and Communication
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1265
Start date: 2004/12/16
End date: 2006/1/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 51
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 52. Changes in Travel Behavior/Demand Due to Managed Lanes (HOV, HOT) Facility System Expansion
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1266
Start date: 2004/10/21
End date: 2006/11/30
Status: Completed
Contract/Grant Number: Project 8-36, Task 52
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 53. Peer Review Capacity Building Partnership: Best Practices in Non-Traditional Performance Measures, Multimodal Goods Movement Tradeoffs, Safety, Reliability, and State Funding
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1267
Start date: 2004/10/8
End date: 2006/5/15
Status: Active
Contract/Grant Number: Project 8-36, Task 53
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 54. Census Data For Transportation Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1268
Start date: 2006/3/23
Status: Completed
Contract/Grant Number: Project 8-36, Task 54
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 55. The Role of Collaboration in Freight Transportation Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1269
Start date: 2005/4/15
End date: 2006/3/15
Status: Completed
Contract/Grant Number: Project 8-36, Task 55
Total Dollars: 49965
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 56. Highway Construction Project Coordination to Minimize Traffic Impact
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1270
Start date: 2005/8/10
End date: 2006/8/10
Status: Completed
Contract/Grant Number: Project 8-36, Task 56
Total Dollars: 10000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 57. Institutional Needs in Safety Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1271
Start date: 2005/8/25
End date: 2006/10/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 57
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 58. Best Practices for State and MPO NHS and STP Programming
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1272
Start date: 2005/8/25
End date: 2007/2/5
Status: Completed
Contract/Grant Number: Project 8-36, Task 58
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 59. Transportation and Health
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1273
Start date: 2005/8/26
End date: 2006/8/26
Status: Completed
Contract/Grant Number: Project 8-36, Task 59
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 60. State DOT Consideration of Infrastructure Development Potential Planning
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1274
Start date: 2005/8/5
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 8-36, Task 60
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research for the AASHTO Standing Committee on Planning. Task 61. Monetary Valuation per Dollar of Investment in Different Performance Measures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1275
Start date: 2005/8/26
End date: 2007/1/15
Status: Completed
Contract/Grant Number: Project 8-36, Task 61
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/23/2006

Research Program Design---Administration of Highway and Transportation Agencies. Highway Safety Leadership Organizational Issues; A Survey of States and Recommendations for Sustaining Progress
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-24(44)
Start date: 2005/10/25
End date: 2007/1/24
Status: Active
Contract/Grant Number: Project 20-24(44)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 6. Comparative Review and Analysis of State Transit Funding Programs
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2005/6
End date: 2006/5
Status: Completed
Contract/Grant Number: Project 20-65, Task 6
Total Dollars: 99730
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 7. Evaluation of States' Ability to Have Staff Resources to Adequately Implement Federal Transportation Programs
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2005/7
End date: 2006/5
Status: Active
Contract/Grant Number: Project 20-65, Task 7
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 8A. Buy America Issues Associated with the State DOT Procurement of Paratransit Vehicles Using FTA Funds
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2006/3/20
Status: Active
Contract/Grant Number: Project 20-65, Task 8A
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 9. Centralized Versus Decentralized State Procurement of Vehicles for the Federal Section 5310 Program
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2006/1
End date: 2006/7
Status: Active
Contract/Grant Number: Project 20-65, Task 9
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 11. Current State Issues with Implementing FTA Section 5310 and 5311 Programs
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2005/12
End date: 2006/6
Status: Active
Contract/Grant Number: Project 20-65, Task 11
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Research for the AASHTO Standing Committee on Public Transportation. Task 12. Cost-Allocation Methods for Commuter, Intercity and Freight Operations on Shared-Use Rail Systems and Corridors
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-65
Start date: 2005/12
End date: 2006/8
Status: Active
Contract/Grant Number: Project 20-65 Task 12
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/20/2006

Synthesis of Information Related to Highway Problems. Topic 37-12. Animal-Vehicle Collision Data Collection
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=104
Start date: 2005/11/1
End date: 2006/2/28
Status: Completed
Contract/Grant Number: Project 20-5, Topic 37-12
Total Dollars: 30000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Highway Problems. Topic 37-08. Crash Reconstruction Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=100
Start date: 2005/11/1
End date: 2006/2/28
Status: Completed
Contract/Grant Number: Project 20-5, Topic 37-08
Total Dollars: 12000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Highway Problems. Topic 37-10. Preserving Freight and Passenger Rail Corridors and Service
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=102
Start date: 2005/11/1
End date: 2006/2/28
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-10
Total Dollars: 2900
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Highway Problems. Topic 37-02. Preservation of Institutional Memory
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=95
Start date: 2005/9/1
End date: 2006/11/30
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-02
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Highway Problems. Topic 37-14. Cone Penetration Test: State of the Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=105
Start date: 2005/1/1
End date: 2007/3/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-14
Total Dollars: 30000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Highway Problems. Topic 37-06. Emerging Technologies for Construction Delivery
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=98
Start date: 2005/10/15
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-06
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/15/2006

Research Program Design---Administration of Highway and Transportation Agencies. Analysis and Benchmarking of State DOT Human Resource Activities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=554
Start date: 2005/12/23
End date: 2007/5/22
Status: Completed
Contract/Grant Number: Project 20-24(48)
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/10/2006

Research Program Design---Administration of Highway and Transportation Agencies. Freight Transportation: New Roles for State DOTs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=552
Start date: 2005/4/12
End date: 2008/10/31
Status: Active
Contract/Grant Number: Project 20-24(46)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/10/2006

US Domestic Scan Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=654
Start date: 2004/9/30
End date: 2005/7/30
Status: Completed
Contract/Grant Number: Project 20-68
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. Guidelines for State DOT Quality Management Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=548
Start date: 2005/1/6
End date: 2006/7/7
Status: Completed
Contract/Grant Number: Project 20-24(42)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. Executive Seminar, Coordinating Transportation and Land Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=551
Start date: 2005/6/17
End date: 2006/1/31
Status: Active
Contract/Grant Number: Project 20-24(45)
Total Dollars: 60000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. AASHTO Strategic Plan Support
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=542
Start date: 2004/3/30
End date: 2005/9/30
Status: Completed
Contract/Grant Number: Project 20-24(36)
Total Dollars: 126000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

U.S. Domestic Scan Program Pilot
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=653
Start date: 2006/1/20
End date: 2008/6/30
Status: Completed
Contract/Grant Number: Project 20-68(01)
Total Dollars: 269553
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. Future Financing Options to Meet Highway and Transit Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=555
Start date: 2005/12/23
End date: 2007/1/22
Status: Completed
Contract/Grant Number: Project 20-24(49)
Total Dollars: 375000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. Analysis and Benchmarking of State DOT Recruitment and Hiring Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=546
Start date: 2004/9/21
End date: 2006/9/30
Status: Completed
Contract/Grant Number: Project 20-24(40)
Total Dollars: 49658
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Research Program Design---Administration of Highway and Transportation Agencies. Racial and Gender Diversity in State DOTs and Transit Agencies: Phase I Benchmark Scoping
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=553
Start date: 2005/7/15
End date: 2006/5/30
Status: Completed
Contract/Grant Number: Project 20-24(7)
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Technologies to Improve Consideration of Environmental Concerns in Transportation Decisions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=756
Start date: 2004/5/7
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project 25-22(02)
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Countermeasures to Protect Bridge Abutments from Scour
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=717
Start date: 2003/8/29
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 24-18A
Total Dollars: 363116
Source Organization: National Cooperative Highway Research Program
Date Added: 03/09/2006

Synthesis of Information Related to Highway Problems. Topic 37-09. Performance-Based Contracting for Maintenance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=101
Start date: 2005/10/17
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-09
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 37-05. Bridge Inspection Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=97
Start date: 2006/10/15
End date: 2007/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-05
Total Dollars: 49000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 37-03. Managing Selected Transportation Infrastructure Assets
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=96
Start date: 2005/9/1
End date: 2007/4/30
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-03
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 35-08. Comprehensive Investigation of Bridges with Fracture Critical Details
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=76
Start date: 2003/10/15
End date: 2006/2/2
Status: Active
Contract/Grant Number: Project 20-05, Topic 35-08
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 37-01. Multi-Disciplinary Teams for Context Sensitive Solutions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=94
Start date: 2005/11/1
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-01
Total Dollars: 0
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 37-11. Debt Financing Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=103
Start date: 2005/10/21
End date: 2007/3/1
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-11
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 37-07. Bridge Management Systems for Transportation Agency Decision-Making
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=99
Start date: 2005/10/7
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 37-07
Total Dollars: 29000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Synthesis of Information Related to Highway Problems. Topic 36-07. Training Program Policies, Practices and Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=87
Start date: 2004/12/8
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 20-05, Topic 36-07
Total Dollars: 12000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/22/2005

Median Cross-Section Design for Rural Divided Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=694
Start date: 2006/1/24
End date: 2009/1/23
Status: Active
Contract/Grant Number: Project 22-21
Total Dollars: 800000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Placement of Traffic Barriers on Roadside and Median Slopes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=695
Start date: 2005/8/1
Status: Proposed
Contract/Grant Number: Project 22-22
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Criteria for Restoration of Longitudinal Barriers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=696
Start date: 2006/6/1
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 22-23
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Intelligent Soil Compaction Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=672
Start date: 2006/8/30
End date: 2009/5/30
Status: Active
Contract/Grant Number: Project 21-09
Total Dollars: 599879
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Guidance for Transportation Project Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=655
Start date: 2006/2/7
End date: 2009/3/13
Status: Completed
Contract/Grant Number: Project 20-69
Total Dollars: 249943
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Transportation Research Thesaurus Improvements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=656
Start date: 2005/9/7
Status: Completed
Contract/Grant Number: Project 20-70
Total Dollars: 90000
Source Organization: National Cooperative Highway Research Program
Date Added: 09/07/2005

Evaluation of Safety Strategies at Signalized Intersections
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=461
Start date: 2006/11/1
End date: 2010/4/30
Status: Active
Contract/Grant Number: Project 17-35
Total Dollars: 750000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Production of the First Edition of the Highway Safety Manual
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=462
Start date: 2006/6/19
End date: 2009/12/30
Status: Active
Contract/Grant Number: Project 17-36
Total Dollars: 1060968
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Pedestrian Predictive Crash Methodology for Urban and Suburban Arterials
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=463
Start date: 2005/9/29
End date: 2007/2/28
Status: Completed
Contract/Grant Number: Project 17-37
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Context Sensitive Solutions: Quantification of the Benefits in Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=412
Start date: 2006/5/25
End date: 2009/6/30
Status: Completed
Contract/Grant Number: Project 15-32
Total Dollars: 450000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Guide for Transportation Landscape and Environmental Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=413
Start date: 2006/3/15
End date: 2009/12/1
Status: Active
Contract/Grant Number: Project 15-33
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Performance-Based Analysis of Geometric Design of Highways and Streets
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=414
Start date: 2006/7/14
End date: 2009/12/13
Status: Active
Contract/Grant Number: Project 15-34
Total Dollars: 600000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Geometric Design of Driveways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=415
Start date: 2006/6/2
End date: 2009/5/30
Status: Active
Contract/Grant Number: Project 15-35
Total Dollars: 349997
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Estimating Joint Probabilities of Design Coincident Flows at Stream Confluences
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=416
Start date: 2006/5/11
End date: 2009/10/31
Status: Active
Contract/Grant Number: Project 15-36
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Guidelines for Vegetation Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=385
Start date: 2006/4/28
End date: 2009/8/1
Status: Completed
Contract/Grant Number: Project 14-16
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Manual for Emulsion-Based Chip Seals for Pavement Preservation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=386
Start date: 2006/8/14
End date: 2009/12/13
Status: Active
Contract/Grant Number: Project 14-17
Total Dollars: 349933
Source Organization: National Cooperative Highway Research Program
Date Added: 08/24/2005

Design of FRP Systems for Strengthening Concrete Girders in Shear
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=364
Start date: 2006/3/27
End date: 2009/7/31
Status: Active
Contract/Grant Number: Project 12-75
Total Dollars: 400000
Source Organization: American Association of State Highway & Transp Officials
Date Added: 08/23/2005

Protocols for Collecting and Using Traffic Data in Bridge Design
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=365
Start date: 2006/3/1
End date: 2008/9/1
Status: Completed
Contract/Grant Number: Project 12-76
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/23/2005

Cost-Effective Connection Details for Highway Sign, Luminaire, and Traffic Signal Structures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=290
Start date: 2006/3/15
End date: 2009/3/14
Status: Active
Contract/Grant Number: Project 10-70
Total Dollars: 891086
Source Organization: National Cooperative Highway Research Program
Date Added: 08/23/2005

Bridge Deck Design Criteria and Testing Procedures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=292
Start date: 2006/9/11
End date: 2009/9/10
Status: Active
Contract/Grant Number: Project 10-72
Total Dollars: 499836
Source Organization: National Cooperative Highway Research Program
Date Added: 08/23/2005

History of Superpave: Documenting the Research Program and Implementation Process
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=976
Start date: 2006/2/28
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 9-42
Total Dollars: 150000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/22/2005

Transportation Safety Planning: Forecasting the Safety Impacts of Socio-Demographic Changes and Safety Investments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=919
Start date: 2006/10/27
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 8-44(02)
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Improved Framework and Tools for Highway Pricing Decisions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=933
Start date: 2006/7/7
End date: 2009/6/30
Status: Completed
Contract/Grant Number: Project 8-57
Total Dollars: 750000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Development of a Multimodal Statewide Corridor Planning Guidebook
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=934
Start date: 2006/2/7
End date: 2008/12/29
Status: Completed
Contract/Grant Number: Project 8-58
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Transportation Cost Implications of New Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=935
Start date: 2006/6/1
End date: 2009/10/31
Status: Active
Contract/Grant Number: Project 8-59
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Procedures for Testing and Evaluating Detectable Warning Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=866
Start date: 2006/11/28
End date: 2009/5/27
Status: Active
Contract/Grant Number: Project 4-33
Total Dollars: 349557
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Application of LADAR in the Analysis of Aggregate Characteristics
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=867
Start date: 2006/6/20
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 4-34
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Low-Cost Improvements for Recurring Freeway Bottlenecks
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=839
Start date: 2005/8/10
End date: 2010/5/20
Status: Active
Contract/Grant Number: Project 3-83
Total Dollars: 300000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Guide for Multistate Transportation Operations Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=840
Start date: 2006/8/23
End date: 2008/1/22
Status: Completed
Contract/Grant Number: Project 3-84
Total Dollars: 265000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Guidance for the Use of Alternative Traffic Analysis Tools in Highway Capacity Analyses
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=841
Start date: 2006/7/28
End date: 2010/7/31
Status: Active
Contract/Grant Number: Project 3-85
Total Dollars: 399926
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Traffic Operations Management and Planning Process
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=842
Start date: 2006/1/1
Status: Proposed
Contract/Grant Number: Project 3-86
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Proactive Ramp Management Under the Threat of Freeway-Flow Breakdown
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=843
Start date: 2006/10/19
End date: 2009/12/18
Status: Active
Contract/Grant Number: Project 3-87
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Models for Estimating the Effects of Pavement Condition on Vehicle Operating Costs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=231
Start date: 2006/10/4
End date: 2009/10/3
Status: Active
Contract/Grant Number: Project 1-45
Total Dollars: 500000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/18/2005

Private-Sector Provision of Congestion Data
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=891
Start date: 2005/6/29
End date: 2007/2/26
Status: Completed
Contract/Grant Number: Project 70-01
Total Dollars: 175000
Source Organization: National Cooperative Highway Research Program
Date Added: 08/08/2005

Synthesis of Information Related to Highway Problems. Topic 304. Driveway Regulation Practices
http://www4.nas.edu/trb/synthsis.nsf/All+Projects/Synthesis+304
Start date: 2001/12/5
Status: Active
Total Dollars: 0
Source Organization: National Cooperative Highway Research Program
Date Added: 05/09/2005

Synthesis of Information Related to Highway Problems. Topic 36-16. State of Tribal Transportation Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=93
Start date: 2004/11/11
Status: Completed
Contract/Grant Number: Project 20-5, Topic 36-16
Total Dollars: 0
Source Organization: National Cooperative Highway Research Program
Date Added: 05/09/2005

A Guide to Emergency Response Planning at State Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=642
Start date: 2006/12/4
End date: 2009/9/30
Status: Active
Contract/Grant Number: Project 20-59(23)
Total Dollars: 325000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

A Guide to Emergency Quarantine and Isolation Controls of Roads in Rural Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=641
Start date: 2006/8/30
End date: 2008/5/31
Status: Completed
Contract/Grant Number: Project 20-59(22)
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Continuity of Operations Plans for Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=640
Start date: 2004/7/21
End date: 2005/5/31
Status: Completed
Contract/Grant Number: Project 20-59(21)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Enhanced Communications Interoperability: Assessment of Emerging Voice/Data Integration Tools
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-59
Start date: 2005/4
Status: Terminated
Contract/Grant Number: Project 20-59(20)
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Transportation Response Options: Scenarios of Infectious Disease, Biological Agents, Chemical, Radiological, or Nuclear Exposure
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-59
Start date: 2003/10/23
End date: 2005/12/31
Status: Active
Contract/Grant Number: Project 20-59(19)
Total Dollars: 251000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Guidelines for Conduct of Emergency Training Drills, Simulations, and Exercises
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-59
Start date: 2005/5/6
End date: 2005/7
Status: Completed
Contract/Grant Number: Project 20-59(18)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Guide to Risk Management of Multimodal Transportation Infrastructure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=637
Start date: 2005/2/23
End date: 2008/10/31
Status: Active
Contract/Grant Number: Project 20-59(17)
Total Dollars: 399966
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Preparation of Educational Materials: Outreach
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=634
Start date: 2004/1/16
End date: 2005/2/28
Status: Completed
Contract/Grant Number: Project 20-59(16)
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Enhanced State DOT Participation in NTI Train-the-Trainer Workshops for Security Awareness
http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20-59
Start date: 2005/5/6
End date: 2006/8
Status: Active
Contract/Grant Number: Project 20-59(6B)
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 24. Climate Change and U.S. Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1296
Start date: 2005/9/1
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project 25-25. Task 24
Total Dollars: 125000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 23. Environmental Performance Measurements Related to Transportation Project Planning, Design, Construction, Maintenance and Operations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1295
Start date: 2005/10/7
End date: 2008/7/1
Status: Completed
Contract/Grant Number: Project 25-25. Task 23
Total Dollars: 85000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 22. Land Use Forecasting for Indirect Impacts Analysis
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1294
Start date: 2005/8/24
End date: 2007/3/1
Status: Completed
Contract/Grant Number: Project 25-25. Task 22
Total Dollars: 99999
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 21. Assessment of Geophysical Remote Sensing Opportunities at State Departments of Transportation for Incorporation into Archaeological Investigations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1293
Start date: 2005/10/7
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 25-25. Task 21
Total Dollars: 40000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 20. The Role of State DOTs in Support of Transit Oriented Development (TOD)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1292
Start date: 2005/6/9
End date: 2006/3/8
Status: Completed
Contract/Grant Number: Project 25-25. Task 20
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 19. Historic Bridge Rehabilitation/Replacement Decision Making
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1291
Start date: 2005/9/22
End date: 2007/5/1
Status: Completed
Contract/Grant Number: Project 25-25. Task 19
Total Dollars: 85000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 18. Recommended Approaches to Communicating Air Toxics Issues and Transportation Project-Related Analyses in NEPA Documents
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1290
Start date: 2005/10/7
End date: 2006/11/16
Status: Completed
Contract/Grant Number: Project 25-25. Task 18
Total Dollars: 100000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 17. Assessment of Greenhouse Gas Analysis Techniques for Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1549
Start date: 2005/6/2
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project 25-25, Task 17
Total Dollars: 29997
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 16. State Transportation Agency Strategies to Address NPDES Phase II Requirements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1289
Start date: 2005/6/1
End date: 2006/12/1
Status: Completed
Contract/Grant Number: Project 25-25. Task 16
Total Dollars: 55000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 15. Historic Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1288
Start date: 2004/9/10
End date: 2005/10/9
Status: Completed
Contract/Grant Number: Project 25-25. Task 15
Total Dollars: 75000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 14. A Summary of Existing Research on Dam Removal Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1287
Start date: 2004/8/8
End date: 2005/10/1
Status: Completed
Contract/Grant Number: Project 25-25. Task 14
Total Dollars: 74948
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 13. Agency Use and Approach to FHWA Approved Programmatic Agreements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1286
Start date: 2004/9/10
End date: 2005/8/9
Status: Completed
Contract/Grant Number: Project 25-25. Task 13
Total Dollars: 59938
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 12. Design-Build Environmental Compliance Process and Level of Detail Required
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1548
Start date: 2004/1/7
End date: 2005/2/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 12
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/07/2005

Research for the AASHTO Standing Committee on the Environment. Task 11. Secondary/Indirect and Cumulative Effects Analysis
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1285
Start date: 2004/9/10
End date: 2005/11/9
Status: Completed
Contract/Grant Number: Project 25-25. Task 11
Total Dollars: 74988
Source Organization: National Cooperative Highway Research Program
Date Added: 05/06/2005

Research for the AASHTO Standing Committee on the Environment. Task 10. Alternative Mitigation Strategies/Early Mitigation: Streamlining and Achieving Net Benefits for the Natural Environment
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1284
Start date: 2004/9/10
End date: 2005/10/9
Status: Completed
Contract/Grant Number: Project 25-25. Task 10
Total Dollars: 99971
Source Organization: National Cooperative Highway Research Program
Date Added: 05/06/2005

Research for the AASHTO Standing Committee on the Environment. Task 8. Developing Performance Data Collection Protocol for Stream Restoration
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1546
Start date: 2004/8/4
End date: 2006/4/1
Status: Completed
Contract/Grant Number: Project 25-25, Task 8
Total Dollars: 50000
Source Organization: National Cooperative Highway Research Program
Date Added: 05/06/2005

Guidance for the Design and Application of Shoulder and Centerline Rumble Strips
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=458
Start date: 2005/6/10
End date: 2009/3/31
Status: Completed
Contract/Grant Number: Project 17-32
Total Dollars: 600000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Effectiveness of Behavioral Highway Safety Countermeasures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=459
Start date: 2005/3/25
End date: 2008/6/30
Status: Completed
Contract/Grant Number: Project 17-33
Total Dollars: 600000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Evaluation of Bridge-Scour Research: Abutment and Contraction Scour Processes and Predicitions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1598
Start date: 2008/1/16
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project 24-27(02)
Total Dollars: 175000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Prepare Parts IV and V of the Highway Safety Manual
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=460
Start date: 2005/6/17
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project 17-34
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

GASB 34--Methods for Condition Assessment and Preservation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=485
Start date: 2005/3/21
End date: 2007/3/20
Status: Completed
Contract/Grant Number: Project 19-07
Total Dollars: 250000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Modernize and Upgrade CANDE for Analysis and Design of Buried Structures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=408
Start date: 2005/4/29
End date: 2008/3/31
Status: Completed
Contract/Grant Number: Project 15-28
Total Dollars: 450000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Design Specifications for Live Load Distribution to Buried Structures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=409
Start date: 2005/4/21
End date: 2009/2/27
Status: Active
Contract/Grant Number: Project 15-29
Total Dollars: 350000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Median Intersection Design for Rural High-Speed Divided Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=410
Start date: 2005/8/1
End date: 2008/12/31
Status: Completed
Contract/Grant Number: Project 15-30
Total Dollars: 200000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Design Guidance for Freeway Mainline Ramp Terminals
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=411
Start date: 2005/1/27
End date: 2007/4/26
Status: Completed
Contract/Grant Number: Project 15-31
Total Dollars: 70000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Default Values for Capacity and Quality of Service Analyses
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=838
Start date: 2005/9/2
End date: 2007/9/1
Status: Completed
Contract/Grant Number: Project 3-82
Total Dollars: 400000
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Measuring Tire-Pavement Noise at the Source
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=230
Start date: 2005/9/1
End date: 2008/3/31
Status: Completed
Contract/Grant Number: Project 1-44
Total Dollars: 249676
Source Organization: National Cooperative Highway Research Program
Date Added: 03/30/2005

Performance and Quality Control of Corrugated Pipe Manufactured with Recycled Polyethylene Content
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=865
Start date: 2006/2/28
End date: 2010/3/31
Status: Active
Contract/Grant Number: Project 4-32
Total Dollars: 349819
Source Organization: National Cooperative Highway Research Program
Date Added: 03/03/2005

Development of Precast Bent Cap Systems for Seismic Regions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=363
Start date: 2005/9/14
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project 12-74
Total Dollars: 598916
Source Organization: National Cooperative Highway Research Program
Date Added: 03/03/2005

Developing a National Database System for Maintenance Actions on Highway Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=384
Start date: 2005/8/26
End date: 2008/5/31
Status: Active
Contract/Grant Number: Project 14-15
Total Dollars: 427633
Source Organization: National Cooperative Highway Research Program
Date Added: 02/28/2005

Design Specifications and Commentary for Horizontally Curved Concrete Box-Girder Highway Bridges
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=360
Start date: 2005/7/18
End date: 2007/12/31
Status: Completed
Contract/Grant Number: Project 12-71
Total Dollars: 350000
Source Organization: National Cooperative Highway Research Program
Date Added: 02/28/2005