Development of Maintenance Training Module for Bus Transit Technicians
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2860
Start date: 2009/11/14
Status: Active
Contract/Grant Number: Project J-04, IDEA 62
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/13/2009

A Guide to Transportation and Hazards Resources
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1198
Start date: 2007/8/17
End date: 2009/1/31
Status: Active
Contract/Grant Number: Project J-10E
Total Dollars: 37500
Source Organization: Transportation Research Board
Date Added: 09/18/2009

Synthesis of Information Related to Transit Problems. Topic SA-23. Practices in the Development and Deployment of Downtown Circulators
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2772
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project J-07, Topic SA-23
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SA-24. Rail Security: Right-of-Way Surveillance and Vehicle Security Cameras
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2773
Start date: 2009/7/7
Status: Proposed
Contract/Grant Number: Project J-07, Topic SA-24
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SA-25. Use of Mobile/Cell Phone Alerts to Notify Transit Customers of Approaching Next Vehicle
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2774
Start date: 2009/7/1
Status: Proposed
Contract/Grant Number: Project J-07, Topic SA-25
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SB-18. Strollers, Carts and Other Large Items on Buses and Trains
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2775
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project J-07, Topic SB-18
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SF-14. Practices to Protect Bus Operators from Passenger Assault
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2776
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project J-07, Topic SF-14
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SG-11. Transit Asset Condition Reporting and Management Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2777
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project J-07, Topic SG-11
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SH-13. Engaging the Transit Passenger in Effective Public Participation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2778
Start date: 2009/7/1
Status: Active
Contract/Grant Number: Project J-07, Topic SH-13
Total Dollars: 35000
Source Organization: Transportation Research Board
Date Added: 07/06/2009

Synthesis of Information Related to Transit Problems. Topic SH-12. Impact of "Small Starts" (Streetcars and Trolleys) on Land Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2566
Start date: 2009/6/25
Status: Active
Contract/Grant Number: Project J-07, Topic SH-12
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 06/24/2009

Google Transit Data Tool for Small Transit Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2695
Start date: 2009/4/9
Status: Active
Contract/Grant Number: Project J-04, IDEA 58
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/08/2009

TCIP Traveler Information Pilot Project
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2696
Start date: 2009/4/9
Status: Active
Contract/Grant Number: Project J-04, IDEA 60
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/08/2009

Flexible Carpooling to Transit Stations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2697
Start date: 2009/4/9
Status: Active
Contract/Grant Number: Project J-04, IDEA 61
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/08/2009

Synthesis of Information Related to Transit Problems. Topic SD-02. Rail Transit Tunnel and Underground Structures Inspection Policy and Procedures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1705
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SD-02
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SE-01. Transit Bus Service Line and Cleaning Functions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1706
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SE-01
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-01. Bus Occupant Safety
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1707
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-01
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-02. Employee Incentive Programs to Improve Transit Performance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1708
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-02
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-03. Methods for Reducing Violence and Improving Transit Security
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1709
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-03
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-04. Monitoring Maintenance Performance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1710
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-04
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-05. Emergency Preparedness for Transit Counter Terrorism
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1711
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-05
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SF-06. Practices in Ensuring Employee Availability
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1712
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-06
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SG-05. Managing Transit Construction Contract Claims
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1717
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-0, /Topic SG-05
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SG-06. Paratransit Contracting and Service Delivery Methods
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1718
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SG-06
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SG-08. Information Technology Update for Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1719
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SG-08
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SH-01. Transit-Focused Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1720
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SH-01
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 04/01/2009

Synthesis of Information Related to Transit Problems. Topic SA-08. Bus Transit Fare Collection Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1691
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SA-08
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 03/31/2009

Synthesis of Information Related to Transit Problems. Topic SA-09. Passenger Counting Technologies and Procedures
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1692
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SA-09
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 03/31/2009

Synthesis of Information Related to Transit Problems. Topic SA-09A. Accessibility of Automated Fare Vending and Collection for Customers with Disabilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1693
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SA-09A
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 03/31/2009

Synthesis of Information Related to Transit Problems. Topic SA-10. Data Collection for Bus Planning and Monitoring
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1694
Start date: 2009/4/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SA-10
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 03/31/2009

Improving ADA Complementary Paratransit Demand Estimation--Phase II: Regional Travel Demand Forecasting
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2357
Start date: 2008/5/15
End date: 2010/5/4
Status: Active
Contract/Grant Number: Projectg B-28A
Total Dollars: 330000
Source Organization: Transportation Research Board
Date Added: 02/19/2009

Guidebook for Measuring, Assessing, and Improving Demand Response Transportation in Rural Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2367
Start date: 2007/8/31
End date: 2009/5/31
Status: Completed
Contract/Grant Number: Project B-31A
Total Dollars: 149442
Source Organization: Transportation Research Board
Date Added: 02/19/2009

Strategic Plan for Meeting Transit Industry Wireless Communications Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2610
Start date: 2008/10/22
End date: 2009/10/21
Status: Active
Contract/Grant Number: Project C-18
Total Dollars: 224972
Source Organization: Transportation Research Board
Date Added: 02/18/2009

Communication with Vulnerable Populations: A Transportation and Emergency Management Toolkit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2611
Start date: 2009/8/27
End date: 2011/9/26
Status: Active
Contract/Grant Number: Project A-33
Total Dollars: 349899
Source Organization: Transportation Research Board
Date Added: 11/13/2008

Improving Safety-Related Rule Compliance in the Public Transportation Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2612
Start date: 2009/9/30
End date: 2011/3/30
Status: Active
Contract/Grant Number: Project A-34
Total Dollars: 349745
Source Organization: Transportation Research Board
Date Added: 11/13/2008

Audience Measurement for Transit Advertising
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2613
Start date: 2009/9/4
Status: Proposed
Contract/Grant Number: Project B-39
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/13/2008

Track Design Handbook For Light Rail Transit, Second Edition
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2614
Start date: 2008/11/14
Status: Proposed
Contract/Grant Number: Project D-14
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/13/2008

Fuel Purchasing Strategies for Public Transit Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2615
Start date: 2009/9/1
Status: Proposed
Contract/Grant Number: Project G-12
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/13/2008

Assessing and Comparing Environmental Performance of Major Transit Investments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2616
Start date: 2009/10/15
Status: Proposed
Contract/Grant Number: Project H-41
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 11/13/2008

International Transit Studies Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1169
Start date: 2008/10/31
Status: Proposed
Contract/Grant Number: Project J-03B
Total Dollars: 325000
Source Organization: Transportation Research Board
Date Added: 10/30/2008

Portable Electronic Wheel Gauge
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2252
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 43
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Biometric Notification Network for Transit Employees
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2257
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 48
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Developing Regional Mobility Management Centers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2259
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 50
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Travel Assistant Device (TAD) to Help Transit Riders
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2261
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 52
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Detection of Radioactivity in Transit Stations--Phase 2
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2263
Start date: 2008/9/3
Status: Completed
Contract/Grant Number: Project J-04, IDEA 54
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Detection of Explosives and Weapons in Transit Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2430
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 56
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Independent Wheelchair Securement
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2431
Start date: 2008/9/3
Status: Active
Contract/Grant Number: Project J-04, IDEA 57
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/29/2008

Synthesis of Information Related to Transit Problems. Topic SA-22. Bus Arterial and Light Rail Transit Preferential Treatments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2532
Start date: 2008/6/26
Status: Active
Contract/Grant Number: Project J-07, Topic SA-22
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 06/25/2008

Synthesis of Information Related to Transit Problems. Topic SE-05. Preventive Maintenance Intervals for Transit Buses
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2533
Start date: 2008/9/26
Status: Active
Contract/Grant Number: Project J-07, Topic SE-05
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 06/25/2008

Synthesis of Information Related to Transit Problems. Topic SH-09. Greenhouse Gas Emissions Savings from Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2534
Start date: 2008/6/26
Status: Active
Contract/Grant Number: Project J-07, Topic SH-09
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 06/25/2008

Synthesis of Information Related to Transit Problems. Topic SH-10. Effective Use of Citizen Advisory Committees for Transit Planning and Operations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2535
Start date: 2008/6/26
Status: Active
Contract/Grant Number: Project J-07, Topic SH-10
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 06/25/2008

Synthesis of Information Related to Transit Problems. Topic SH-11. Pass Fare Arrangements for Public Employees
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2536
Start date: 2008/6/26
Status: Active
Contract/Grant Number: Project J-07, Topic SH-11
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 06/25/2008

A Practical Guide for Recruiting Minorities for Chief Executive Officers at Public Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2362
Start date: 2008/12/5
End date: 2010/5/4
Status: Active
Contract/Grant Number: Project F-15
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 05/29/2008

Methods for Forecasting Demand and Quantifying Need for Rural Passenger Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1590
Start date: 2007/12/4
End date: 2009/10/31
Status: Active
Contract/Grant Number: Project B-36
Total Dollars: 299180
Source Organization: Transportation Research Board
Date Added: 05/09/2008

Estimation of Demand for Rural Intercity Bus Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1591
Start date: 2007/12/11
End date: 2010/2/28
Status: Active
Contract/Grant Number: Project B-37
Total Dollars: 199411
Source Organization: Transportation Research Board
Date Added: 05/09/2008

Methodology for Determining the Economic Development Impacts of Transit Investments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2364
Start date: 2008/11/11
End date: 2010/5/20
Status: Active
Contract/Grant Number: Project H-39
Total Dollars: 400000
Source Organization: Transportation Research Board
Date Added: 03/24/2008

Synthesis of Information Related to Transit Problems. Topic SB-16. Integration of Paratransit and Fixed Route Transit Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1679
Start date: 2007/10/1
End date: 2008/10/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SB-16
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 03/12/2008

Synthesis of Information Related to Transit Problems. Topic SB-17. Innovative Rural Transit Routes
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1680
Start date: 2007/11/1
End date: 2008/11/1
Status: Active
Contract/Grant Number: Project J-07, Topic SB-17
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 03/12/2008

Synthesis of Information Related to Transit Problems. Topic SF-13. Transit Security Update
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1681
Start date: 2007/10/1
End date: 2008/10/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-13
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 03/12/2008

Synthesis of Information Related to Transit Problems. Topic SA-20. Public/Private Transit Partnerships
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1682
Start date: 2007/11/6
End date: 2008/11/6
Status: Completed
Contract/Grant Number: Project J-07, Topic SA-20
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 03/12/2008

Joint Rail Transit Research with the Association of American Railroads/Transportation Technology Center, Incorporated
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1086
Start date: 1999/10/28
End date: 2009/6/30
Status: Active
Contract/Grant Number: Project D-07
Total Dollars: 1300000
Source Organization: Transportation Research Board
Date Added: 02/29/2008

International Transit Studies Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2417
Start date: 2008/4/23
Status: Proposed
Contract/Grant Number: Project J-03C
Total Dollars: 425000
Source Organization: Transportation Research Board
Date Added: 02/27/2008

Extending and Deepening National Transit Training Standards
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2360
Start date: 2008/7/14
End date: 2009/10/13
Status: Completed
Contract/Grant Number: Project E-08
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 02/19/2008

Establishing a National Transit Industry Rail Vehicle Technician Certification Program: Building for Success
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2359
Start date: 2008/7/18
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project E-07
Total Dollars: 800000
Source Organization: Transportation Research Board
Date Added: 02/19/2008

Synthesis of Information Related to Transit Problems. Topic SH-07. Web Based Survey Techniques for Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=198
Start date: 2005/10/1
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project J-07, Topic SH-07
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 02/14/2008

Transit Bus Mechanics: Building for Success--The ASE Transit Bus Maintenance Certification Test Series
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1100
Start date: 2005/4/13
End date: 2010/6/30
Status: Active
Contract/Grant Number: Project E-06
Total Dollars: 1325000
Source Organization: Transportation Research Board
Date Added: 01/22/2008

Synthesis of Information Related to Transit Problems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1179
Start date: 1992/11/1
Status: Active
Contract/Grant Number: Project J-07
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 01/22/2008

Transit Enterprise Architecture and Planning Framework
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2384
Start date: 2008/9/10
End date: 2010/3/10
Status: Active
Contract/Grant Number: Project J-09, Task 13
Total Dollars: 213000
Source Organization: Transportation Research Board
Date Added: 12/21/2007

Synthesis of Information Related to Transit Problems. Topic SB-11. Practices in Late Cancellation/No-Show Policies for ADA Paratransit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=174
Start date: 2004/11/1
End date: 2005/8/26
Status: Completed
Contract/Grant Number: Project J-07, Topic SB-11
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SB-12. Integration of Bicycles and Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=175
Start date: 2004/10/1
End date: 2005/11/9
Status: Completed
Contract/Grant Number: Project J-07, Topic SB-12
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SC-07. Emergency Response Protocols for Natural Gas Powered Transit Vehicles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=179
Start date: 2003/12/11
End date: 2005/3/9
Status: Completed
Contract/Grant Number: Project J-07, Topic SC-07
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SD-03. Bus Use of Shoulders
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=181
Start date: 2004/11/3
End date: 2006/6/12
Status: Completed
Contract/Grant Number: Project J-07, Topic SD-03
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SE-03. Maintenance Staffing Levels for Light Rail Transit Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=183
Start date: 2004/11/1
End date: 2005/10/4
Status: Completed
Contract/Grant Number: Project J-07, Topic SE-03
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SE-04. Track Maintenance Costs on Rail Transit Properties
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=184
Start date: 2000/1/1
End date: 2007/11/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SE-04
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SF-12. Paratransit Managers' Skills, Qualifications, and Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=190
Start date: 2006/11/1
End date: 2007/11/1
Status: Completed
Contract/Grant Number: Project J-07, Topic SF-12
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SH-04. Strategic Planning and Management in Transit Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=195
Start date: 2004/1/1
End date: 2005/4/25
Status: Completed
Contract/Grant Number: Project J-07, Topic SH-04
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SH-05. On-Board and Intercept Transit Survey Techniques
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=196
Start date: 2004/12/1
End date: 2005/11/30
Status: Completed
Contract/Grant Number: Project J-07, Topic SH-05
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Synthesis of Information Related to Transit Problems. Topic SH-06. Fixed Route Transit Ridership Forecasting and Service Planning Methods
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=197
Start date: 2005/10/1
End date: 2006/11/14
Status: Completed
Contract/Grant Number: Project J-07, Topic SH-06
Total Dollars: 30000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Improving Pedestrian and Motorist Safety Along Light Rail Transit Alignments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1019
Start date: 2006/9/8
End date: 2009/3/1
Status: Completed
Contract/Grant Number: Project A-30
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Demonstration of Paratransit/Fixed-Route Feeder Service for ADA Compliance
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1022
Start date: 1997/1/2
End date: 2004/7/1
Status: Active
Contract/Grant Number: Project B-01A
Total Dollars: 240000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Update the Traveler Response to Transportation System Changes Handbook
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1033
Start date: 1997/2/1
End date: 2007/12/31
Status: Completed
Contract/Grant Number: Project B-12
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Strategies for Increasing the Effectiveness of Commuter Choice Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1154
Start date: 2003/4/8
End date: 2005/6/30
Status: Completed
Contract/Grant Number: Project H-25A
Total Dollars: 160000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

State and National Transit Investment Analysis: Quick-Response Analyses for SAFETEA-LU Commissions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1163
Start date: 2006/2/21
End date: 2006/8/22
Status: Completed
Contract/Grant Number: Project H-33
Total Dollars: 100000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

A New Process for Determining TCRP New Paradigms Research Topics
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1172
Start date: 2008/3/31
Status: Active
Contract/Grant Number: Project J-06, Task 21
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 11/29/2007

A Guide for Planning and Operating Flexible Public Transportation Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1588
Start date: 2007/8/16
End date: 2009/12/30
Status: Active
Contract/Grant Number: Project B-35
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Guidebook for Evaluating Fuel Choices for Post-2010 Transit Bus Procurements: Update of TCRP Report 38
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1592
Start date: 2008/1/23
End date: 2010/1/1
Status: Active
Contract/Grant Number: Project C-19
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/29/2007

Characteristics of Premium Transit Services that Affect Choice of Mode
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1596
Start date: 2007/12/28
End date: 2010/10/1
Status: Active
Contract/Grant Number: Project H-37
Total Dollars: 375000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Reinventing the Interstate: A 'New Paradigm' for Multimodal Transportation Facilities
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1595
Start date: 2007/10/26
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project H-36
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

A Methodology for Performance Measurement and Peer Comparison in the Public Transportation Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1594
Start date: 2007/11/1
End date: 2010/3/1
Status: Active
Contract/Grant Number: Project G-11
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Guidebook for Estimating "Soft Costs" for Major Public Transportation Capital Infrastructure Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1589
Start date: 2007/8/24
End date: 2009/8/31
Status: Active
Contract/Grant Number: Project G-10
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Guidelines for Ferry Transportation Services--A National Overview
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2365
Start date: 2008/10/30
End date: 2010/4/29
Status: Active
Contract/Grant Number: Project H-40
Total Dollars: 199286
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Developing, Enhancing, and Sustaining Tribal Transit Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2363
Start date: 2008/9/30
End date: 2010/9/29
Status: Active
Contract/Grant Number: Project H-38
Total Dollars: 399366
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Outreach to Minorities for Executive Searches in Public Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2362
Start date: 2008/4/2
Status: Proposed
Contract/Grant Number: Project F-15
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Addressing Critical Shortfalls: Recruitment, Development, and Retention of High-Quality Managers for Public Transportation Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2361
Start date: 2008/9/12
End date: 2010/4/1
Status: Active
Contract/Grant Number: Project F-14
Total Dollars: 250000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Guidelines for Providing Access to Public Transportation Stations
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2358
Start date: 2008/9/17
End date: 2010/3/16
Status: Active
Contract/Grant Number: Project B-38
Total Dollars: 350000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Operation of Light Rail Transit through Ungated Crossings at Speeds over 35 MPH
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=2356
Start date: 2008/11/26
End date: 2011/11/26
Status: Active
Contract/Grant Number: Project A-32
Total Dollars: 295000
Source Organization: Transportation Research Board
Date Added: 11/15/2007

Update the Traveler Response to Transportation System Changes Handbook
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1034
Start date: 1999/10/5
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project B-12A, Phase II
Total Dollars: 456600
Source Organization: Transportation Research Board
Date Added: 10/12/2007

Synthesis of Information Related to Transit Problems. Topic SB-15. Cost Containment for Paratransit Rider Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1550
Start date: 2008/4/21
Status: Completed
Contract/Grant Number: Project J-07, Topic SB-15
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 09/06/2007

Vehicle Operator Recruitment, Retention, and Performance in ADA Complementary Paratransit Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1593
Start date: 2007/9/1
End date: 2009/12/1
Status: Active
Contract/Grant Number: Project F-13
Total Dollars: 300000
Source Organization: Transportation Research Board
Date Added: 09/04/2007

Synthesis of Information Related to Transit Problems. Topic SC-09. Use of Biodiesel in a Transit Fleet
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1551
Start date: 2008/4/22
Status: Completed
Contract/Grant Number: Project J-07, Topic SC-09
Total Dollars: 0
Source Organization: Transportation Research Board
Date Added: 08/09/2007

Role of Public Transportation in Emergency Evacuation (Supplement to SAFETEA-LU NAS/TRB Policy Study)
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1165
Start date: 2006/11/1
End date: 2008/7/31
Status: Completed
Contract/Grant Number: Project H-35
Total Dollars: 65000
Source Organization: Transit Cooperative Research Program
Date Added: 10/17/2006

Quick Response for Special Needs
http:///www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-06
Start date: 1994/1/1
Status: Active
Contract/Grant Number: Project J-06, Task 69
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 07/13/2006

Quick Response for Special Needs. Task 68. Background Information and Issues Associated with Ridership Estimates for Major Capital Projects
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-06
Start date: 2007/7/13
Status: Proposed
Contract/Grant Number: Project J-06, Task 68
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 07/13/2006

Human Services Transportation Cost Reporting to Facilitate Cost Sharing Agreements
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1122
Start date: 2007/1/8
End date: 2009/7/31
Status: Active
Contract/Grant Number: Project G-09
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 05/22/2006

A Guidebook for the Evaluation of Project Delivery Methods
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1121
Start date: 2006/10/3
End date: 2008/10/31
Status: Completed
Contract/Grant Number: Project G-08
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 04/07/2006

Practical Measures to Increase Transit Industry Advertising Revenues
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1056
Start date: 2007/3/19
End date: 2009/2/28
Status: Completed
Contract/Grant Number: Project B-33
Total Dollars: 285000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Local and Regional Funding Mechanisms for Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1164
Start date: 2006/8/8
End date: 2008/9/15
Status: Completed
Contract/Grant Number: Project H-34
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

The e-Zine Technology Knowledge Center for Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1183
Start date: 2005/9/29
End date: 2009/12/29
Status: Active
Contract/Grant Number: Project J-09, Task 11
Total Dollars: 205000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

eTransit: Electronic Business Strategies for Public Transportation New and Emerging Information Technologies for Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1184
Start date: 2004/10/13
End date: 2007/3/31
Status: Completed
Contract/Grant Number: Project J-09, Task 12
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Ensuring Full Potential Ridership from Transit-Oriented Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1157
Start date: 2004/12/10
End date: 2007/12/15
Status: Completed
Contract/Grant Number: Project H-27A
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Public Transportation Passenger Security Inspections: A Guide for Decision Makers
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1202
Start date: 2006/11/16
End date: 2007/2/28
Status: Completed
Contract/Grant Number: Project J-10J
Total Dollars: 100000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Continuity of Operations Plans for Transportation Agencies
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1199
Start date: 2004/7/21
End date: 2005/5/31
Status: Completed
Contract/Grant Number: Project J-10F
Total Dollars: 100000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Developing and Updating Security Plans: A Pilot Course for Rural and Community-based Public Transportation Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1199
Start date: 2004/5/4
End date: 2005/10/8
Status: Completed
Contract/Grant Number: Project J-10D
Total Dollars: 200000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Security Measures for Ferry Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1201
Start date: 2004/8/3
End date: 2006/2/28
Status: Completed
Contract/Grant Number: Project J-10H
Total Dollars: 150000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Making Transportation Tunnels Safe and Secure
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1200
Start date: 2004/9/13
End date: 2006/6/30
Status: Completed
Contract/Grant Number: Project J-10G
Total Dollars: 400000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Guidelines for Transportation Emergency Training Drills and Exercises
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1196
Start date: 2004/7/1
End date: 2005/11/30
Status: Completed
Contract/Grant Number: Project J-10C
Total Dollars: 200000
Source Organization: Transit Cooperative Research Program
Date Added: 04/05/2006

Guidebook for Commingling ADA-Eligible and Other Passengers on ADA-Complementary Paratransit Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1057
Start date: 2006/8/30
End date: 2009/10/31
Status: Active
Contract/Grant Number: Project B-34
Total Dollars: 299447
Source Organization: Transit Cooperative Research Program
Date Added: 03/20/2006

Controlling System Costs: Basic and Advanced Scheduling Manuals and Contemporary Issues in Transit Scheduling
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1018
Start date: 2006/7/31
End date: 2009/3/15
Status: Completed
Contract/Grant Number: Project A-29
Total Dollars: 375000
Source Organization: Transit Cooperative Research Program
Date Added: 03/20/2006

Synthesis of Information Related to Transit Problems. Topic SB-14. Methods of Ridership Communication
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=177
Start date: 2005/11/1
End date: 2006/12/1
Status: Completed
Contract/Grant Number: Project J-7, Topic SB-14
Total Dollars: 30000
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Transit Problems. Topic SB-13. Transit Agency Participation in Medicaid Transportation Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=176
Start date: 2005/6/1
End date: 2005/11/9
Status: Completed
Contract/Grant Number: Project J-7, Topic SB-13
Total Dollars: 30000
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Transit Problems. Topic SH-08. Incorporating Bus Transit Service in Planning for New Development
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=199
Start date: 2005/10/15
End date: 2006/12/15
Status: Completed
Contract/Grant Number: Project J-7, Topic SH-08
Total Dollars: 30000
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Transit Problems. Topic SH-07. Web-Based Survey Techniques
http://www4.nas.edu/trb/synthsis.nsf/All+Projects/Synthesis+SH-07
Start date: 2005/10
End date: 2006/7
Status: Active
Contract/Grant Number: Project J-7, Topic SH-07
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Transit Problems. Topic SH-06. Easy to Apply, Short Range, Fixed-Route, Bus and Rail Transit Ridership Forecasting Methods
http://www4.nas.edu/trb/synthsis.nsf/All+Projects/Synthesis+SH-06
Start date: 2005/10
End date: 2006/7
Status: Active
Contract/Grant Number: Project J-7, Topic SH-06
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Synthesis of Information Related to Transit Problems. Topic SC-08. Use of Mobile Data Terminals (MDTs) in Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=180
Start date: 2005/10/1
End date: 2006/12/31
Status: Completed
Contract/Grant Number: Project J-7, TopicSC-08
Total Dollars: 30000
Source Organization: Transit Cooperative Research Program
Date Added: 03/15/2006

Determining the Elements Needed to Create High-Ridership Transit Systems
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1162
Start date: 2004/9/15
End date: 2006/12/30
Status: Completed
Contract/Grant Number: Project H-32
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 03/10/2006

Quick Response for Special Needs. Task 67. Strategic Assessment of Wireless Capabilities and Needs for the Public Transportation Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1177
Start date: 2006/8/28
End date: 2008/3/31
Status: Completed
Contract/Grant Number: Project J-06, Task 67
Total Dollars: 99740
Source Organization: Transit Cooperative Research Program
Date Added: 03/09/2006

Employee Compensation Guidelines for Transit Providers in Rural and Small Urban Areas
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1112
Start date: 2005/9/27
End date: 2007/9/30
Status: Completed
Contract/Grant Number: Project F-12
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 03/09/2006

Quick Response for Special Needs. Task 59. Racial and Gender Diversity in State DOTs and Transit Agencies: Phase I Benchmark Scoping
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1176
Start date: 2005/7/15
End date: 2006/5/30
Status: Completed
Contract/Grant Number: Project J-06, Task 59
Total Dollars: 50000
Source Organization: Transit Cooperative Research Program
Date Added: 03/09/2006

Design, Operation, and Safety of At-Grade Crossings of Exclusive Busways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1090
Start date: 2004/9/29
End date: 2006/8/15
Status: Completed
Contract/Grant Number: Project D-11
Total Dollars: 150000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Ground-Borne Noise and Vibration in Buildings Caused by Rail Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1091
Start date: 2005/9/16
End date: 2009/11/30
Status: Active
Contract/Grant Number: Project D-12
Total Dollars: 424867
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Assessment of Hybrid-Electric Transit Bus Technology
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1076
Start date: 2004/12/20
End date: 2009/2/28
Status: Active
Contract/Grant Number: Project C-15
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Development of Crash Energy Management Performance Requirements for Light-Rail Vehicles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1078
Start date: 2005/9/22
End date: 2008/3/8
Status: Completed
Contract/Grant Number: Project C-17
Total Dollars: 299990
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Improving ADA Complementary Paratransit Demand Estimation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1051
Start date: 2004/8/24
End date: 2006/12/29
Status: Completed
Contract/Grant Number: Project B-28
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Transit Market Research: Leveraging ITS and Transit ITS Data
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1052
Start date: 2005/2/3
End date: 2007/5/31
Status: Completed
Contract/Grant Number: Project B-29
Total Dollars: 200000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Optimal Split of Dedicated and Nondedicated Service for Demand-Responsive Paratransit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1053
Start date: 2004/9/1
End date: 2007/4/1
Status: Completed
Contract/Grant Number: Project B-30
Total Dollars: 249921
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Guidebook for Measuring, Assessing, and Improving Performance of Demand-Response Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1054
Start date: 2005/9/8
End date: 2007/3/8
Status: Completed
Contract/Grant Number: Project B-31
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Understanding How to Motivate Communities to Support and Ride Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1055
Start date: 2005/9/29
End date: 2007/3/30
Status: Completed
Contract/Grant Number: Project B-32
Total Dollars: 325000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Shared Use of Railroad Infrastructure with Non-FRA-Compliant Public Transit Rail Vehicles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1016
Start date: 2005/8/31
End date: 2009/3/30
Status: Completed
Contract/Grant Number: Project A-27
Total Dollars: 198564
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Guidebook for Mitigating Fixed-Route Bus-and-Pedestrian Collisions
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1017
Start date: 2005/11/2
End date: 2007/5/2
Status: Completed
Contract/Grant Number: Project A-28
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 04/14/2005

Center Truck Performance on Low-Floor Light Rail Vehicles
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1077
Start date: 2004/10/19
End date: 2006/4/18
Status: Completed
Contract/Grant Number: Project C-16
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 11/10/2004

Synthesis of Information Related to Transit Problems. Topic SD-03. Bus Bypass Shoulders
http://www4.nas.edu/trb/synthsis.nsf/All+Projects/Synthesis+SD-03
Start date: 2004/8/13
End date: 2006/4
Status: Active
Contract/Grant Number: Project J-7, Topic SD-03
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 08/13/2004

New Paradigms for Local Public Transportation Organizations
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-08B
Start date: 1998/5/11
End date: 2003/7/30
Status: Active
Contract/Grant Number: Project J-08B
Total Dollars: 723283
Source Organization: Transit Cooperative Research Program
Date Added: 07/27/2003

Robotic Devices: A Selection Guide for the Transit Environment
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2002/12
Status: Completed
Contract/Grant Number: Project J-10B(3)
Total Dollars: 20000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Use of Portable Explosive Detection Devices
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2003/8/30
Status: Active
Contract/Grant Number: Project J-10B(2)
Total Dollars: 200000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Emergency Response Mobilization Strategies and Guidelines for Transit
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2003/8
Status: Active
Contract/Grant Number: Project J-10B(1)
Total Dollars: 400000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Intrusion Detection for Public Transportation Facilities
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2003/3
Status: Active
Contract/Grant Number: Project J-10A(3)
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Security-Related Training and Customer Communications
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2003/6
Status: Active
Contract/Grant Number: Project J-10A(2)
Total Dollars: 400000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

A Guide to Public Transportation Security Resources
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2002/12/31
Status: Active
Contract/Grant Number: Project J-10(3)
Total Dollars: 5000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Transit Security White Papers
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-10
Start date: 2002/11/24
End date: 2002/8/30
Status: Completed
Contract/Grant Number: Project J-10(2)
Total Dollars: 20000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Public Transportation Security Research
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1186
Start date: 2002/1/1
Status: Active
Contract/Grant Number: Project J-10
Total Dollars: 2000000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

e-Transit: Electronic Business Strategies for Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1185
Start date: 2001/7/1
End date: 2006/7/1
Status: Active
Contract/Grant Number: Project J-09
Total Dollars: 1000000
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Legal Aspects of Transit and Intermodal Transportation Programs. Topic 6-03. Compilation of Labor (13c) Decisions
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-05
Start date: 2001/6/1
End date: 2003/5
Status: Active
Contract/Grant Number: Project J-05, Topic 6-03
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Legal Aspects of Transit and Intermodal Transportation Programs. Topic 6-02. A Guide to ADA for the Transit Lawyer
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-05
Start date: 2001/7/1
End date: 2003/5
Status: Active
Contract/Grant Number: Project J-05, Topic 6-02
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Legal Aspects of Transit and Intermodal Transportation Programs. Topic 5-04. A Compilation of Transit Laws
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+J-05
Start date: 2000/1/1
End date: 2003/10
Status: Active
Contract/Grant Number: Project J-05, Topic 5-04
Total Dollars: 0
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Mechanical Precision Docking System: Improving Safety & Access for All
http://www.nationalacademies.org/trb/idea
Start date: 2002/11/24
Status: Active
Contract/Grant Number: Project J-04, IDEA 34
Total Dollars: 86950
Source Organization: Transit Cooperative Research Program
Date Added: 12/20/2002

Predictive Diagnostics for Bus Maintenance
http://www.nationalacademies.org/trb/idea
Start date: 2002/3/7
End date: 2003/1/6
Status: Active
Contract/Grant Number: Project J-04, IDEA 30
Total Dollars: 74068
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Designing Transit Services for the Mode-Choice Market Stage III Planning Tools and Processes
http://www.nationalacademies.org/trb/idea
Start date: 2000/6/30
End date: 2003/3/31
Status: Active
Contract/Grant Number: Project J-04, IDEA 26
Total Dollars: 70000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Combating Global Warming Through Sustainable Surface Transportation Policy
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-21
Start date: 2001/6/7
End date: 2003/3/7
Status: Completed
Contract/Grant Number: Project H-21
Total Dollars: 174953
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Assessing the Effectiveness of Public Transportation Boards
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-24A
Start date: 2003/1/13
End date: 2004/1/30
Status: Active
Contract/Grant Number: Project H-24A
Total Dollars: 175000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Economic Benefits of Coordinating Human Service Transportation and Transit Services
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-26
Start date: 2000/10/15
End date: 2003/4/30
Status: Completed
Contract/Grant Number: Project H-26
Total Dollars: 150000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Transit-Oriented Development: State of the Practice and Future Benefits
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-27
Start date: 2001/9/1
End date: 2003/9/1
Status: Active
Contract/Grant Number: Project H-27
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Uses of Archived AVL/APC Data to Improve Transit Performance and Management
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1158
Start date: 2001/8/1
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project H-28
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

A New Vision of Mobility: Guidance to Foster Collaborative Multimodal Decision Making
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-29
Start date: 2001/8/1
End date: 2004/2/28
Status: Completed
Contract/Grant Number: Project H-29
Total Dollars: 349998
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Strategies to Increase Coordination of Transportation Services for the Transportation Disadvantaged
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-30
Start date: 2002/7/16
End date: 2004/1/16
Status: Active
Contract/Grant Number: Project H-30
Total Dollars: 199998
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Understanding How Individuals Make Travel and Location Decisions: Implications for Public Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1161
Start date: 2003/10/17
End date: 2006/12/30
Status: Completed
Contract/Grant Number: Project H-31
Total Dollars: 350000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

A Guidebook for Developing a Transit Performance-Measurement System
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+G-06
Start date: 2001/6/28
End date: 2002/11/28
Status: Completed
Contract/Grant Number: Project G-06
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Managing Capital Costs of Major Federally Funded Public Transportation Projects
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1120
Start date: 2003/9/4
End date: 2005/12/1
Status: Completed
Contract/Grant Number: Project G-07
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/19/2002

Positioning the Public Transportation Operating Agency as an Employer of Choice
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+F-11
Start date: 2002/9/9
End date: 2003/9/3
Status: Active
Contract/Grant Number: Project F-11
Total Dollars: 299705
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

A Guidebook for Developing and Sharing Transit Bus Maintenance Practices
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1099
Start date: 2003/9/26
End date: 2005/7/15
Status: Completed
Contract/Grant Number: Project E-5
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Joint Track-Related Research with the Association of American Railroads/Transportation Technology Center, Incorporated
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+D-07
Start date: 1999/10/28
End date: 2005/11/30
Status: Active
Contract/Grant Number: Project D-07
Total Dollars: 950000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Improved Pedestrian Safety at Unsignalized Roadway Crossings
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1087
Start date: 2002/11/6
End date: 2006/3/6
Status: Completed
Contract/Grant Number: Project D-08
Total Dollars: 175000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Transit Vehicles and Facilities on Streets and Highways
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1088
Start date: 2002/11/1
End date: 2007/4/30
Status: Completed
Contract/Grant Number: Project D-09
Total Dollars: 349969
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Audible Signals for Pedestrian Safety in Light Rail Transit Environments
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1089
Start date: 2003/10/3
End date: 2007/2/28
Status: Completed
Contract/Grant Number: Project D-10
Total Dollars: 400000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Technical Assistance for Development of Bus Standards
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1075
Start date: 2001/11/1
End date: 2008/9/30
Status: Completed
Contract/Grant Number: Project C-14
Total Dollars: 1275000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Update the “Traveler Response to Transportation System Changes” Handbook (DOT-FH-11-9579)
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-12A
Start date: 1999/10/5
End date: 2006/12/31
Status: Active
Contract/Grant Number: Project B-12A Phase II
Total Dollars: 456600
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Improving Public Transportation Access to Large Airports
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-18A
Start date: 2000/6/20
End date: 2002/5/17
Status: Completed
Contract/Grant Number: Project B-18A
Total Dollars: 200000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Improving Public Transportation Options for Older Persons
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-19
Start date: 1999/10/4
End date: 2002/5/12
Status: Completed
Contract/Grant Number: Project B-19
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

New Paradigms for Rural and Small Urban Transit Service Delivery
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-22
Start date: 2000/5/31
End date: 2001/11/30
Status: Active
Contract/Grant Number: Project B-22
Total Dollars: 99981
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Resource Requirements for Demand-Responsive Transportation Services
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-23
Start date: 2000/12/1
End date: 2003/8/30
Status: Active
Contract/Grant Number: Project B-23
Total Dollars: 249971
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Toolkit for Rural Community Coordinated Transportation Services
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-24
Start date: 2001/7/20
End date: 2003/10/20
Status: Active
Contract/Grant Number: Project B-24
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Guidelines for Evaluating, Selecting, and Implementing Suburban Transit Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1048
Start date: 2003/10/23
End date: 2006/5/1
Status: Completed
Contract/Grant Number: Project B-25
Total Dollars: 299970
Source Organization: Transit Cooperative Research Program
Date Added: 12/17/2002

Carsharing: Where and How it Succeeds
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1049
Start date: 2003/10/10
End date: 2005/10/9
Status: Completed
Contract/Grant Number: Project B-26
Total Dollars: 249997
Source Organization: Transit Cooperative Research Program
Date Added: 12/16/2002

Cost Benefit Analysis of Providing Non-Emergency Medical Transportation
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1050
Start date: 2004/2/20
End date: 2005/8/19
Status: Completed
Contract/Grant Number: Project B-27
Total Dollars: 245000
Source Organization: Transit Cooperative Research Program
Date Added: 12/16/2002

Update of the First Edition, Transit Capacity and Quality of Service Manual
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-15A
Start date: 1999/10/29
End date: 2003/12/31
Status: Active
Contract/Grant Number: Project A-15A
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Improved Traffic Signal Priority for Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1001
Start date: 1999/6/7
End date: 2006/11/30
Status: Completed
Contract/Grant Number: Project A-16A
Total Dollars: 194730
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Vehicle Guide for Integrating Non-Urban School and Public Transportation Services
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1006
Start date: 2002/5/30
End date: 2007/1/30
Status: Completed
Contract/Grant Number: Project A-19A(2)
Total Dollars: 163986
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Strategies for Improved Traveler Information
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-20A(2)
Start date: 2002/7/1
End date: 2003/3/3
Status: Active
Contract/Grant Number: Project A-20A(2)
Total Dollars: 50000
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Training for New Technology
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-20B(2)
Start date: 2001/1/19
End date: 2002/9/19
Status: Completed
Contract/Grant Number: Project A-20B(2)
Total Dollars: 90895
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Implementation Guidelines for Bus Rapid Transit Systems
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-23
Start date: 2000/5/24
End date: 2003/5/30
Status: Active
Contract/Grant Number: Project A-23
Total Dollars: 249980
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Cost and Effectiveness of Selected Bus Rapid Transit Components
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1012
Start date: 2003/10/20
End date: 2006/9/30
Status: Completed
Contract/Grant Number: Project A-23A
Total Dollars: 300000
Source Organization: Transit Cooperative Research Program
Date Added: 12/13/2002

Fare Policies, Structures and Technologies (Update)
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-25
Start date: 2001/7/1
End date: 2003/3/1
Status: Active
Contract/Grant Number: Project A-25
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 12/12/2002

Smart Card Interoperability Issues for the Transit Industry
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1015
Start date: 2003/10/10
End date: 2006/4/30
Status: Completed
Contract/Grant Number: Project A-26
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 12/12/2002

Public Transit Boards: Organization and Characteristics
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+H-24
Start date: 2000/10/11
End date: 2002/5/30
Status: Completed
Contract/Grant Number: Project H-24
Total Dollars: 150000
Source Organization: Transit Cooperative Research Program
Date Added: 12/11/2002

Strategies for Improved Traveler Information
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+A-20A(1)
Start date: 1998/6/22
End date: 2001/9/30
Status: Completed
Contract/Grant Number: Project A-20(A)(1)
Total Dollars: 90000
Source Organization: Transit Cooperative Research Program
Date Added: 12/11/2002

Dissemination and Implementation of Research Findings
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1166
Start date: 1993/2/15
Status: Active
Contract/Grant Number: Project J-01
Total Dollars: 4000000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

International Transit Studies Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1168
Start date: 1994/2/1
End date: 2009/12/31
Status: Active
Contract/Grant Number: Project J-03
Total Dollars: 500000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Innovations Deserving Exploratory Analysis--The Transit IDEA Program
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1170
Start date: 1992/12/1
Status: Active
Contract/Grant Number: Project J-04
Total Dollars: 2300000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Legal Aspects of Transit and Intermodal Transportation Programs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1171
Start date: 1993/3/1
Status: Active
Contract/Grant Number: Project J-05
Total Dollars: 19250000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Quick Response for Special Needs
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1178
Start date: 1994/1/1
Status: Active
Contract/Grant Number: Project J-06
Total Dollars: 335992600
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Passenger Information Services
Start date: 1996/3/1
End date: 1998/2/28
Status: Completed
Contract/Grant Number: Project A-12
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Management Practices at Small Urban and Rural Public Transportation Systems
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+G-05
Start date: 1997/1/2
End date: 1999/3/31
Status: Completed
Contract/Grant Number: Project G-5
Total Dollars: 250000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

New Paradigms for Public Transit
http://www.trb.org/TRBNet/ProjectDisplay.asp?ProjectID=1180
Start date: 1996/5/20
Status: Active
Contract/Grant Number: Project J-08
Total Dollars: 171000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Personal Mobility Aid Securement and Passenger Restraint on Transit Vehicles
Start date: 1993/7/15
End date: 1996/1/14
Status: Completed
Contract/Grant Number: Project C-01
Total Dollars: 299971
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Characteristics of Urban Travel Demand
http://www4.trb.org/trb/crp.nsf/All+Projects/TCRP+B-15
Start date: 1997/8/18
End date: 2001/6/30
Status: Completed
Contract/Grant Number: Project B-15
Total Dollars: 249998
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Strategies for Improved Traveler Information
Start date: 1998/6/22
Status: Active
Contract/Grant Number: Project A-20A
Total Dollars: 225000
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Managing Transit's Workforce in the New Millennium
Start date: 2000/2/1
End date: 2002/1/30
Status: Completed
Contract/Grant Number: Project F-09
Total Dollars: 249187
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002

Operating Policies for Improved Transit Productivity
Start date: 2000/5/17
End date: 2003/5/31
Status: Active
Contract/Grant Number: Project J-04, IDEA 25
Total Dollars: 73823
Source Organization: Transit Cooperative Research Program
Date Added: 07/10/2002