Concrete Filled Steel Tube Arch Suppl. #1
Record Type: DOT

The Nebraska Department of Roads (NDOR,) Bridge Division, is faced with the challenge of providing a 175 ft single span bridge with a structural depth not exceeding 35 in. for the Ravenna Viaduct. The only way to meet this challenge is by using a truss or a tied arch system. A tied arch would require less fabrication labor and would be more aesthetically pleasing than a truss. An innovative steel tube parallel arch system was investigated by NDOR and University personnel and was found to be feasible. The slender arch would only be possible due to the high performance steel and concrete to be used, and due to use of new theories recognizing a significant increase in capacity of concrete that is confined inside a steel tube. The proposed work includes establishing design criteria for the arch top chord, the arch bottom chord and the arch hangers. It would include development and testing of connection of the deck to the bottom chord, top and bottom chord splice connections, details at the abutments, construction and final bridge buckling stability, and material and construction specifications for quality control/quality assurance. Survey also will be undertaken to identify the best concrete mix and pumping techniques for tube filling, and the measures required for durability of the arch and the deck. The immediate goal of this research is to provide technical justification for the design and detailing of the Ravenna Viaduct arch system. The results of the research will form the basis for standardizing the system for future use in applications where superstructure depth is severely limited. Missouri River bridges built recently have superstructure depths ranging from 14 to 28 feet. The paper describes how an economical high-performance steel/concrete tube arch system can be developed for Missouri River crossings with structural depth of 6 to 10 feet.
Start date: 2003/3/31
End date: 2008/6/20
Status: Active
Contract/Grant Number: SPR-P1(04) P561
Total Dollars: 142000
Source Organization: Nebraska Department of Roads
Date Added: 08/12/2003
Index Terms: Concrete bridges, Steel, Tubular structures, Concrete structures, Arch bridges, Splice plates, Research projects, Nebraska,

 
Sponsor Organization     Project Manager

Federal Highway Administration
http://www.fhwa.dot.gov/
1200 New Jersey Avenue, SE
Washington, DC 20590
USA
Phone: (202) 366-4000

Nebraska Department of Roads
http://www.dor.state.ne.us/
P.O. Box 94759
Highway Building
Lincoln, NE 68509-4759
USA
Phone: (402) 471-4567
Fax: (402) 479-4325

   

Traynowicz, Mark

Sharp, Dan

 
Performing Organization     Principal Investigator

University of Nebraska, Lincoln
College of Engineering and Technology
Lincoln, NE 68503
USA

   

Tadros, Maher K.
Phone: (402) 554-4842
Fax: (402) 554-3304
Email: mtadros@unomaha.edu

 
Subjects    
Materials
Research
Bridges and other structures