Precast Systems for Rapid Construction of Bridge Substructures
Record Type: DOT
The Bridge Office is beginning a program of research into bridge designs that facilitate rapid construction. This study will develop practical and safe precast systems for the construction of bridge substructures taking advantage of concepts recently developed for buildings. Verification of the design will be done through instrumentation of an upcoming WSDOT structure. Primary benefits of the precast systems would be shorter construction time and less disruption of traffic.
Start date: 2003/8/1
End date: 2005/12/31
Status: Completed
Contract/Grant Number: T2695-53
Secondary Number: 03-381
Total Dollars: 145000
Source Organization: Washington State Department of Transportation
Date Added: 01/22/2003
Index Terms: Bridge substructures, Precast concrete, Design, Bridge design, Construction, Work zone traffic control, Research projects,
|
|
Federal Highway Administration
http://www.fhwa.dot.gov/
1200 New Jersey Avenue, SE
Washington, DC 20590
USA
Phone: (202) 366-4000
|
|
Anderson, Keith W.
Phone: (360) 586-8959
|