Investigation of CDOT's Flowfill Specifications
Record Type: DOT

The Colorado Department of Transportation (CDOT) uses flowfill as an alternative to compacted soil backfill to backfill bridge abutments, pipes and culverts, utility cuts and minor inlet structures. However, flowfill is expensive and some field performance problems have been encountered. A study panel concluded that a performance-based specification for flowfill is needed. The objective of this study is to review and improve CDOT's specifications and quality assurance procedures for flowfill.
Start date: 2005/10/1
End date: 2009/12/15
Status: Active
Contract/Grant Number: 80.23
Total Dollars: 0
Source Organization: Colorado Department of Transportation
Date Added: 11/17/2005
Index Terms: Backfilling, Backfill soils, Compacted soils, Bridge abutments, Pipe culverts, Flow, Research projects, Colorado,

 
Sponsor Organization     Project Manager

Colorado Department of Transportation
http://www.dot.state.co.us/research
4201 East Arkansas Avenue
Denver, CO 80222
USA

   

Khan, Aziz
Phone: (303) 757-9522
Fax: (303) 757-9974
Email: aziz.khan@dot.state.co.us

 
Performing Organization     Principal Investigator
   
 
Subjects    
Construction
Materials
Research
Geotechnology